Post Job Free

Resume

Sign in

A Team Body Shop

Location:
Ahmedabad, Gujarat, India
Posted:
January 21, 2024

Contact this candidate

Resume:

+91-906*******

Vishalvariya****@

gmail.com

** ** *****-* ********

Surat -395004

**/**/****

Male

CONTACT

SKILLS

Robot programming &

troubleshooting

MS office

DWM

Decision Making

PDCA based Work Plan

4M, 5S, KAIZEN,

Why-Why analysis

Loss Monitoring

Controlling, Stop Call

Wait System.

TPM & 7QC Tools.

V I SHAL VARIYA

To be associated with a growing organization and making sure that the goals of the organization are consistently achieved by working with team work & sincerity

WORK EXPERIENCE

SUZUKI MOTOR GUJARAT PVT LTD. Dec 2017- July 2022

Bechraji, Mehsana

BODY SHOP PRODUCTION ENGINEER

Working as a team leader as a line-in charge in side body and main body line.

Fulfil the green field requirements to achieve the schedule and establish the system.

Finalize the line side (Loading station) layout to make the part easily accessible to the operator & to reduce the operator movement.

Robot programme modification for body accuracy with quality team.

Monitored and evaluated all existing manufacturing process to increase efficiency and reduce cost as much as possible.

Responsible for 114 Robot & leading a team of 25 to 30 workers to meet production schedule and standard in accordance with the organisation policies.

Work in close coordination with the engineering

department(PE) to Implement engineering changes in the product.

Production meeting for production issue like material availability, product quality status component & assembly problem.

Studying & identification the bottlenecks for productivity improvement, finding solution, implementing & stream lining the production process.

Kaizen co-ordinate plant level & conduct the monthly meeting with CFT.

Attend daily meeting to know the defect of BIW.

To manage on job training and multi skill training for line associate.

EDUCATION

Dr. S S & S ghandhy engineering July 2017

Diploma in Electrical / 7.5 CGPA

Kailash Vidhya Bhavan June 2014

10th SSC / 75%

DECLARATION

I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned.

VISHAL VARIYA

STRENGTH

Seek Challenges

Hard Working

Good Leadership

Friendly Nature

MG MOTOR PVT LTD Aug 2022

Halol, Vadodara

BODY SHOP PRODUCTION ENGINEER

Significate experience in minimizing performance bottlenecks with a collaborative approach to achieve high productivity with maximum utilization of Men, Method, Machine & Materials.

Maintaining and controlling the production targets on the basis of SPQRC.

To maintain quality of assembly & main line to provide best quality product to the next customer.

Troubleshooting of assembly line defect related to manual operation.

To eliminate the deviation in line and shop floor through effective layered audits and safety observation tour(SOT).

To prepare SOP to carry out the process within the standard and maintain the quality of assembly and main line.

To evaluate and prepare skill matrix of associate through proper job rotation plan & increase their flexibility.

Worked as a CFT team to solved body shop defect.

To adhere body product audit defect & troubleshooting of issue by root cause analysis.

To identify bottleneck and line balancing to improve productivity

& optimum utilization of all resources.

Maintain documentations & records as per company standards.

Monitoring Global Customer Audit score and taking countermeasure to achieve the target with quality team.

Analysing line side issues on daily basis and taking countermeasure on timely basis.

Checking Spot position and Spot Nugget size on daily basis through chisel check.

Worked on Direct Pass ratio (DPR) take counter measure to improve direct pass of vehicle in weld, paint, and assembly and VI shop.

Coordinate with maintenance team to improve and maintain line breakdown & efficiency.

Languages known

Gujarati

Hindi

English

Achievment project

ATC(Auto tip Changer) - 2019

SPS project for improve part

magazine capacity. - 2020

SPS project is underway to shift

extra spot at the bottleneck

station to other station. - 2021

SPS project for improve part

magazine capacity. - 2020

Guide making for avoid gun

shunting and spot quality improve.



Contact this candidate