Manufacturing Production Manager
Professional Manufacturing Production Manager well-practiced in lean management principles and methodologies outlined in Lean Six Sigma Black Belt training using KANBAN and Value Stream Mapping to; Decrease cycle time, Lower inventory, Increase productivity, and Capital equipment utilization
Extensive experience in leading crews of technicians fabricating any size part or material from mechanical engineering drawings to mill spec accuracy for aerospace parts, to Industrial grade pipes and tanks out of metal, wood, and fiberglass
Ability to assess issues, make quick decisions, implement solutions, and influence change in a fast-paced, high demand environment while keeping proper documentation to maintain compliance with UL, ISO 9001 elements, and IPC Standards
Create and implement best practices to streamline production, monitor quality control and safety standards
Leverage resources from a linear timeline into a multidimensional process to assure all key elements meet lead times accurately, ensuring production flow with on-time delivery in a just on time environment, under budget
Regular equipment maintenance and retooling as part of quality and cost control, leading to less down time
Award winning troubleshooting expertise using measuring tools such as laser measuring, protractor, calipers, and micrometers to assess accuracy in root cause analysis of drawings, equipment calibration and operators
Create a bill of materials and standard routers in ERP/MRP systems
Promote a company culture, encouraging top performance, high employee morale and morals
Ready to meet any required education and certifications immediately
Organize companies for optimum efficiency through product Life Cycle from concept to delivered package
Work with the team to determine the required fixtures and tooling for production cell design
Develop and execute lean roadmap strategies through Continuous Improvement projects and Kaizen events
Coach enthusiasm in the use of the latest tools such as:
oERP/MRP programs including MS 360, Dynamics, Program 2016 Professional and Sage 100 & 300, and Fishbowl
oAutodesk Inventor Professional 2017/2018
oCNC Water Jets, Laser cutting equipment, Break press, Punch press, Tubing rollers, Fastener insertion, and drill press
Work Experience
E-stone Corp., Sebring, FL 5/2022-Present
Cabinetry Division Operations and Production Manager
Created a brand-new state of the art CNC cabinet Manufacturing line from crates of SCM equipment to fully functional custom made to order production line using a custom designed CRM/MRP to communicate to ERP, track material, create orders and equipment production programs
Developed and implemented a plan for production layout to drive lean product flow using lean management principles and methodologies outlined in Lean Six Sigma Black Belt training and Value Stream Mapping
Wrote SOPs, trained production team on new equipment, OSHA certifications, Gemba and 5S(6S) mind set
Established a custom designed CRM to implement and continuously monitor KPIs for safety, service level, quality, cost, productivity and profitability
Insured equipment was installed and running to specs by running test runs of every style, color and size being offered by entering orders, as a customer, to check that every bit of information is being disseminated properly, POs are created, inventory is consumed, production orders are correct, and pieces produced reflect the order entered exactly as entered
Melbourne Architectural Millworks, Melbourne, FL 11/21/2021 - 3/16/2022
Design Engineer
Using Cabinet Vision, I designed and programed CNC routers to fabricate outdoor cabinetry, create and maintain the libraries used of the on-line catalog.
Italian Terrazzo & Tile, Melbourne, FL 5/4/2020 - 9/4/2020
Project Administrator
Responsible for processing homebuilder orders for installations by entering information into AppWright BPM and, writing orders in Oracle JDE, scheduling material for orders based on builders’ installation schedule
Acting as a liaison between branches and builders on installations
Navigate homebuilder portals to translate multiple customer order formats into a standard format for order entry and processing all change order requests to ensure billing matches work estimated and completed
Monitor and track homebuilders schedule to ensure on time schedule and delivery of material and installation
Work with branch personnel to handle pre-closing repair issues, such as punch-out repairs, material shortfalls, claims on defective material, and warranty work
TBS Machines LLC, White Plains, NY 12/3/2018 - 1/3/2020
Project Manager/Remote Telecommute
Responsible for defining the scope of the project in collaboration with team of executives for the leasing/financing of mining and construction equipment from overseas and domestic companies then executed the project according to the project plan
Created a detailed work plan which identified and sequenced the activities needed to successfully complete the project
Determined the resources (e.g. time, money, equipment, etc.) required to complete the project
Completed the month of intensive paid training for Supply Chain and Project Management
Developed a schedule for project completion that effectively allocated the resources to the activities
Reviewed the project schedule with team of executives and all other staff that were affected by the project activities and revised the schedule as required using MS Program
In consultation with the appropriate manager, identified project staff with appropriate skillset for project activities
Managed project staff according to the established policies and practices of the organization
Ensured that all project personnel received the appropriate orientation to the organization and the project
Contracted qualified managers to work on the project as appropriate
Developed forms and records to document project activities using MS Office
Setup files to ensure that all project information was appropriately documented and secured
Monitored the progress of the project and made adjustments as necessary to ensure the successful completion of the project
Established a communication schedule to update stakeholders including appropriate staff in the organization on the progress of the project
Reviewed the quality of the work completed with the project team on a regular basis to ensure the project standards
Wrote reports on the project for team of executives and/or stakeholders
Communicated with stakeholders on project status
Monitored and approved all budgeted project expenditures
Monitored cash flow projections and reported actual cash flow and variance to senior management on a regular basis
Managed all project funds according to established accounting policies and procedures
Prepared financial reports and supporting documentation for stakeholders
Ensured that the project deliverables were on time, within budget and at the required level of quality
Evaluated the outcomes of the project as established during the planning
Nautical Furnishings, Fort Lauderdale, FL 6/11/2018-3/25/2019
Lighting Division Production Manager
Responsible for tracking the inventory of incoming parts, labor, and supplies needed to build lighting fixtures
Created production schedules according to sales department schedules to accommodate shipping dates
Maintained an on-time shipping performance of at least 95%
Conducted all safety inspections and assured all Personal Protective Equipment was being utilized
Ensure proper testing and documentation to maintain compliance with UL monthly inspections
Plan and execute the production schedule based on the MRP (Fishbowl)
Monthly production meetings with the sales department on projected sales, to present India and China orders to purchasing in order, to accommodate three-month lead time and limited rack space
Weekly and daily meetings with production teams and individuals to discuss time saving practices, upcoming projects, and changes in the production schedule
Planned and moved the lighting department from old warehouse to new building: stopping production after lunch on Friday for final teardown and first load, fully moving live inventory and equipment Saturday morning and setting up shop for production first thing Monday morning by 4:30 PM Saturday
Created and implemented best practices to streamline production, monitor quality control and safety
Determined materials and services to purchase for the lighting assembly department
Provided sales orders and prints to production workers
AMF Building Products, Mangonia Park, FL 1/3/2018 - 2/15/2018
Railing Division Plant Production/ Quality Consultant
Brought in to do root cause analysis on rails being returned to the company and streamline welding process
Coached enthusiasm in the use of Sage 100 and 300 thru the implementation of the unused modules, showing the time saving reports at production meetings, and the ease of printing travelers for tracking and organizing production progress
Hired welding school graduates to prep parts and set up jigs for the welders to maximize welding time with lower cost labor
Reintroduced time saving methods such as using carts that only had parts specified on the travelers
Trained sanders to perform quality control checks before each step was performed and how to set up railings to verify that overall dimensions, angles, and radius were to technical drawings before sending to power coat
Continuously worked with CAD department to ensure proper dimensions, angles and radius were in the same place in a readable font and size with correct cut list and part numbers
Daily meetings with project managers to keep informed of any issues on the job sites and changes in contractors needs to ensure proper lead times met delivery schedule
Created and implemented Standard Operating Procedures to streamline production, quality control and safety
Paul Fimbres Technologies, Delray Beach, FL 12/09/2016-present
Modernization and Remodeling Consultant
Working with customers to complete the installation of modernized home and vehicle products by teaching them how to do it by working beside them and doing whatever is to complex, technical, or physically demanding for them, helping them save money and have peace of mind knowing it was done correct to codes and intended purpose
Specialty Vehicle Solutions, LLC, Trenton, NJ 6/7/2016 - 12/09/2016
Production Manager of SVS South
Set up a temporary production facility in Coconut Creek, FL called SVS South
Oversaw, hired and trained a team to build Logistical Support Unit #4 for the Fire Department of New York City, and Surveillance Vehicles for the Department of Homeland Security originally slated for ProBuilt Industries
Designed and documented (including CAD drawings) the Surveillance Vehicle to match one already in production from different manufacture, so that it could be duplicated in the production facility in Trenton, New Jersey
Created a production schedule to reflect expectations discussed on weekly video conference calls with production management team in Trenton
Determined materials and services to purchase for the assembly and installation departments
Managed budgets and man hour allocation within those budgets
ProBuilt Industries, Coconut Creek, FL 3/7/2011 - 6/5/2016
C.O.O. - Production Strategies
Responsible for establishing project goals, setting timelines and achievement of milestones for the production of mobile platforms as a complete turn key product within the manufacturing plant for delivery worldwide
Completed production planning, scheduling, ordering, and approving resources required to maintain inventory for lean just on time manufacturing
Managed staff including hiring and training proper safe use of welding equipment, brake press, punch press, fastener insertion, wire crimpers, drill press, custom fiberglass molds, and annual performance reports
Researched, tested, and learned MRP/ERP, SAP and CAD programs before purchasing MS 360, MS Dynamics, MS Program 2016 Professional, with Sage 100 in a trial phase, and replacing Auto CAD 2.0 and unuser friendly Turbo CAD 3D with user friendly Autodesk Inventor Professional 2016
Studied and implemented Sigma Six Black Belt training on my own to improve my professional lean production skills
Maintained work area in accordance with 5S(6S) system and Just Do It (JDI) projects
Worked directly with the owner to develop goals and create detailed plans for the manufacturing, installation, and engineering departments to meet goals in preparation of taking over his responsibilities when he retired
Responsible for the accuracy of work-in-process and prepare status reports
Planed and coordinated preparation of project documentation, such as engineering drawings, production specifications and schedules, and contract modifications to ensure customer and government contract requirements were met
Ensured production was completed with established safety, quality and production standards
Reviewed contracts, applying knowledge of engineering and manufacturing processes to determine documentation required for each phase of projects
Analyzed proposed changes of product design to determine the effect on overall product and system, then coordinated modification records for production and management control
Established change orders and prepared for change authorization and documentation by company or government agency
Reviewed and analyzed released engineering change data and coordinated changes with engineering, quality control, support, manufacturing, and installation departments
Enforced regular equipment maintenance and retooling as part of quality and cost control, thus leading to less down time
Created and implemented Standard Operating Procedures to streamline production, quality control and safety
Determined materials and services to purchase for the manufacturing, electrical assembly and installation departments
Custom manufactured parts and components from a variety of materials including metal, wood, fiberglass and Plexiglas
Created and reorganized the production line for new product production using multiple and complex cell designs
The Painted Gecko Fine Metal Art and Furniture, Tucson AZ 12/2008 - 2/2011 and 10/2002 - 2/2004
Production and Sales Supervisor
Charged with streamlining production and increasing sales
Coach enthusiasm in the use of CNC water jet and plasma cutter, press brake, welding, and painting equipment
Updated CNC Plasma Cutter to achieve Modern Technology and Capabilities with Minimal Investment
Created and implemented Standard Operating Procedures to streamline production, quality control and safety
Determined materials and services to purchase for the manufacturing and installation departments
Managed budgets and man hour allocation within those budgets
Freeport-McMoRan Copper & Gold Inc, Morency, AZ 10/2007-11/2008
Crusher Repairman
Responsible for maintaining the production line of the crushers and conveyor belts from pit to leech fields
Safety inspections for preventative maintenance and repairing of equipment on down days within different departments
Maintained and organized supply yards for equipment parts and supplies
Created and implemented Standard Operating Procedures to streamline production, quality control and safety
Planned, Staged and Executed maintenance and repairs Safely, with Expertise and Efficiency
Competitive Paint and Body Inc., Tucson, AZ 3/200*-**-****
VP of Operations
Charged with all aspects of operations such as cash handling, banking, taxes, rent, insurance and building safety
Responsible for ordering products, supplies, parts and paint from multiple vendors with professionalism and urgency
Trained and hired new staff with continued coaching and training of all personnel focusing on safe fast production
Responsible for production scheduling, staff increases and decreases as demands and projections required
Managed budgets with respect to man hour and budgeting for new equipment allocation within those budgets
Created and implemented Standard Operating Procedures to streamline production, quality control and safety
Determined materials and services to purchase for the paint, repair, and parts installation departments
Vender relations insuring on time delivery and volume pricing
Research and development of proprietary paint colors and formulations that three times out performed the warranty
Mirage Plastering, Inc., Tucson, AZ 09/2001-10/2002
Maintenance Manager
Charged with creating a new maintenance department within the company, this included an inventory system and maintenance schedule that worked in agreement with large scale and out of town projects
Responsible for ordering parts and services required for preventive maintenance and repairing equipment
Created and implemented Standard Operating Procedures to streamline production, quality control and safety
Set up systems such as an air filter cleaning service to reduce cost of regular preventive maintenance
Desert Metal Works, Tucson AZ 11/1998-9/2001
Forming Department Assistant Foreman, Break press, and Laser Operator
Worked as a partner of the Foreman to combine two established manufacturing companies into one modern facility
Manage and analyze productions capacity v. demand
Organize work schedules over three shifts, including a staff of up to 50 direct reports and 150 plus indirect
Trained safe use of Mill lathes, Sheet metal shears, Ban saws, Fastener insertion, welders and drill press
Ensure that established polices, processes and procedures were followed according to established ISO9001 elements and UL standards
Regular equipment maintenance and retooling as part of quality and cost control, thus leading to less down time
Created and implemented Standard Operating Procedures to streamline production, quality control and safety
Southwest Circuits, Inc, Tucson AZ 05/1988-09/1990
Printed Circuit Board Troubleshooter and Repairman
Identify Cause of PCB (Printed Circuit Board) failure to pass Tests and Inspections
Repair if possible, by the use of Schematics, Prints and Drawings to determine best repair method including Welding Traces, Removing Shorts, Electroplating and Sealing of Traces, by hand if necessary,
Identify Patterns. Determine Cause and Process such as etching or silk screening and take the steps necessary to eliminate flaws and conform to IPC standards
Education:
University of Arizona 1991-1993
Philosophy and Political Science
2nd Ave, Tucson, AZ 85721 T: 520-***-****
Pima Community College 1988-1992
Liberal Arts and Sciences/Liberal Studies
1255 North Stone Avenue, Tucson, AZ 85711 T: 520-***-****
Amphitheater High School1983 - 1988
Graduated with honors in Industrial Arts
125 W. Yavapai Road, Tucson, AZ 85705 T: 520-***-****
Certifications:
o MENSA Mine Safety, Confined Spaces, Respirator and CPR
o Prometric Certified Professional Food Manager (Certificate Number: 1653753)
o ASE certified: Engines, Driveline and Suspension, Paint and Body, Electrical and Fuel, Wheels, Tires and Brakes
o Forklift Operator, Overhead Crane Operator, Lock out/Tag out
Awards:
2nd in Nation Written Team Score Plymouth Troubleshooting contest 1988
2nd in State Hands-On Plymouth Troubleshooting contest 1988
6th in Nation at VICA in Small Gas Engines 1988
1st and 2nd in State VICA in Small Gas Engines 1988 and 1987