Post Job Free

Resume

Sign in

Logistic Coordinator Co Ordinator

Location:
Riyadh, Saudi Arabia
Salary:
As per company
Posted:
January 20, 2024

Contact this candidate

Resume:

Muneer M

Mannam Paramban House

Malappuram (Dist.)

Pin No: 676506, Kerala

+966-*********

Email ad2xwx@r.postjobfree.com, ad2xwx@r.postjobfree.com

Contact number: +966-*********

Skype ID muneermp4

POST APPLIED - LOGISTIC CO-ORDINATOR & LIFTING SUPERVISOR

AIM

Exceptionally creative and self-motivated Logistic coordinator and Lifting Supervisor with huge experience supervising and coordinating activities of workers engaged in lifting and overseeing of hoisting and positioning machinery, equipment, and structural parts during work.

WORKING EXPERIENCE

DESIGNATION : LIFTING SUPERVISOR - LOGISTIC COORDINATOR

ORGANISATION : AL MUHAIDIB/THABAT CONTRACTING Co K S A

DURATION : JUNE 2013 to Till DATE

DESIGNATION : EQUIPMENT MANAGER

ORGANISATION : POWERTECH TRADING & CONTRACTING WLL.QATAR

DURATION : 15-JUNE-2009 to 18-MAY-2012

DESIGNATION : EQUIPMENT SUPERVISOR

ORGANISATION : INTEGTATED LOGISTICS Co KUWAIT

DURATION : FEB-2003 to MARCH-2009

DESIGNATION : EQUIPMENTS SUPERVISOR

ORGANISATION : NASSER FAIZAL HAJRI Co KUWAIT

DURATION : JUNE 2001 to JAN 2003

Job Responsibilities :-

Arranging tool box meeting every morning with rigger, operators and site foremen for explain the day today activities for safe work.

The riggers, the Crane Operator and any other person involved in the lift are familiar with and follow the safe system of work and the details and limitations recorded in the lifting plan.

Crane Operators working hours do not exceed the operating criteria,

Crane Operators are suitably trained and competent (if not informs Crane Co-coordinator and Section Manager).

The safe working load (SWL) is never exceeded, other than for the express purpose of testing a crane under the supervision of a competent person. There are no exceptions to this.

Cranes do not operate in any weather conditions that exceed the limit stated for that type of crane.

A suitable and sufficient risk assessment has been carried out, which considers all aspects of the lift including environmental factors such as the proximity of obstructions, underground services, overhead cables and structures.

Lift plans and method statements for the lifting operation and developed as appropriate.

Appropriate protection measures are put in place.

A current thorough examination and/or test record has been issued and is available for each item of lifting equipment and accessory.

The SWL of the lifting equipment and accessories is adequate for the weight of the load

All lifting accessories are clearly marked with their safe working load.

Correct and up-to-date copies of the Sling Chart and Safe Working Load tables are available, when using multi-leg slings.

The method of communication is agreed and understood by everyone involved in the lift.

A suitable rack is available for storing slings, etc. when they are not in use.

A trained and competent rigger is available.

Preparing time sheet for equipment’s and workers.

Arranging equipment time sheet daily and short listed for end of month.

Pre pare time sheet for workers including operators and riggers.

COMPUTER PROFICIENCY

MS Office, Word, Excel, PowerPoint, Outlook, Access, OneNote

Google Drive, Docs, Sheets, Forms, Slides. Spreadsheets,

Email, Filters, folders, mail merge, rules

Operating systems: windows 8, 7, XP & Vista.

OTHER ACIEVEMENTS

Elementary Fire Prevention Course – 1998

Best employee of the year on 2011 at POWERTECH TRADING & CONTRACTING W.L.L, QATAR

Special recognition from Vinci HSE team for safe lifting operations.

Privacy and Data Protection for global companies certification

Time and Labor System certifications

MAJOR PROJECTS HANDLED

Al Kharj S T P Project - Thabat.Co

Manfouha S T P Project - Thabat.Co

Briman Strategic Reservoir Project - Al Muhaidib Contracting

KOC Expansion Project in different GC’s - S K Engineering

Expansion of Mina Al Ahmadhi Refinery - Hyundai Engineering & Construction

Major Pipeline works for KOC - MECC(MW)

Doha Power Plant - IMCO

KOC Expansion GC-15 - Mushriff (Abdally)

Crude Export Project - Mushriff ( Fintas)

RAS Gas Shutdown Project (Qatar) - TWT

QATALUM ALUMINUM - AMA

New Doha International Air Port - Power Tech

EQUIPMENT HANDLED

Cranes Ranging From 25 t To 700 t ( Both Hydraulic and Crawler Cranes)

Boom Truck Ranging From 3 t to 15 t

Forklifts ranging from 3 t to 15 t

Other earth moving equipment like Excavator, Loader, Roller, Back Hoe Loader, Skid Steer Loader etc.

Welding Machines, Generators, Air Compressors etc.

Hydraulic Trailers, Low Bed Trailers etc.

Bus, car, pickup, jeeps, and other transporting vehicles

PERSONAL PROFILE

Name : MUNEER. M

Name of the father : Mr. Avaran Kutty Mannan Paramban

Permanent address : Mannam Paramban House

Padinhattummury P.O

Kottilangady Vazhy

Malappuram (dist)

Pin No: 676 506, Kerala

Age & Date of Birth : 49 years, 1th May 1974

Religion : Muslim

Sex : Male

Marital status : Married

Nationality : Indian

Mother tongue : Malayalam

Languages known : English, Arabic, Hindi, Malayalam, Tamil

Contact number : +966-*********

E mail id : ad2xwx@r.postjobfree.com, ad2xwx@r.postjobfree.com

: ad2xwx@r.postjobfree.com

Passport number : U0704198

Expiry : 26/JAN/2030

Driving License Number : 235*******

Expiry : 31/07/2025

DECLARATION

I hereby declare that this Curriculum Vita is true and correct.

DATE: NAME: MUNEER. M



Contact this candidate