CURRICULUM VITAE
Position Title Project Manager
Name of Expert Nabbala Moses Mumpembe
Date of Birth 05/07/1970
Country of Citizenship/Residence Uganda
Email ad2wnj@r.postjobfree.com
Tel. +256*********
Key Qualifications
Moses Nabbala Mumpembe is a Professional Civil Engineer with a proven track record gained over 30 years work experience in Civil Engineering and Building Infrastructure Development Projects. Moses Nabbala Mumpembe has been actively involved and delivered several infrastructure projects, starting with concept design, tender assistance, feasibility studies, Detailed Engineering Design, construction supervision/management, project monitoring and post construction evaluation. Moses Nabbala Mumpembe has worked on several Building structures and Civil infrastructure projects funded by both local and international agencies such as JICA, World Bank, IDB, Shelter Affric, Government of Uganda, Housing finance Bank, majorly in High Rise Building structures, transport sector, Drainage, Water and Sanitation . Moses has gained vast experience in the role and responsibility of (i) Project Manager (ii) Project Engineer (iii) Quantity and Structural Engineer, (iv) Geotechnical Engineer (v) Construction Engineer (vi)Site Quantity Surveyor (vii) Site agent
Moses Nabbala Mumpembe has horned skill set in and is well conversant with Design and Supervision, Conditional assessment of structures and soil Investigations, inspection and Quality Control, Quality Assurance/ Quality Control Procedures, Supervision Procedures and Interpretation of Technical Specifications, Project Management and Contract Administration.
Education
Institution (Period) Degree(s ) or Diploma (s) obtained Kyambogo University,Uganda, August 2016-
December 2020,Graduated 23 sept.2021
MSc Civil Engineering, Majoring in Construction
Technology and Management
,Kyambogo University Aug.2010 –July
2014,Graduated 16th Jan 2015
Bachelor of Engineering in Civil and Building
Engineering
Kyambogo Polytechnic,Uganda, August
1999-July,Graduated 7th May 2004 Higher Diploma in Construction (Civil) Uganda Technical College Bushenyi,Uganda
August 1991-July 1993,Graduated Nov.1996 Ordinary Diploma in Civil and Building Engineering Membership in profession society
Registered with Uganda Institute of Profession Engineers Gm1367 2
Publication :
Published in the journal of Civil Construction and Environmental Engineering (JCCEE), Thesis titled: Assessment of the performance of Artisan Clay Brick for Structural Strength, Chemical Stability and Durability on Dec.31. 2020
Other Training
Safety and Health training JICA (ODA) project
Risk Assessment and Health NHCC
MS word
MS excel
Auto CAD
Prokon
MS Project
Power Point
Employment Record Relevant to Assignment
Period Employing
organization and
title/position.
Country/
Client
Summary of activities performed
relevant to the Assignment
Feb 2022
to date
1.Kyambogo
University
2.International
University of East
Africa
Uganda Lecture,examine, assess,supervise
research and mark examinations of
Students
Feb.2022 –
June 2022
Ankin Engineering Ltd plot
122 Semawata Ntinda-
Uganda
Position:
Structural/Geotechnical
Engineer
(Enhancing National Food
Security through Increased
Rice Production-Bugiri and
Igogero Rice Irrigation
Scheme)
Uganda-
Ministry of Agriculture
The project was for Enhancing National Food
Security through increased Rice Production. It
involved improving the existing and designing new
Bridges, Culvert structures, irrigation fullow
channels, Earth dam, water reservoir
Work Carried out:
Geotechnical investigation
Design of earth dam /water reservoir.
Design of the water pump head
Review of Contract
Design of bridges, box culverts Fullow channels
and Documentations
Design review and update of box Culvert
Review and approve Contractor’s Work Method
Statements;
Certify Contractor’s works;
Draft Site Instructions and response to
Contractor’s correspondences such as letters,
Technical Notes, etc.;
Lead Technical Meetings between the
Contractor and the Consultant in line with
Structural construction.
Delivered Structural update report at all culvert points and bridges.
3
Period Employing
organization and
title/position.
Country/
Client
Summary of activities performed
relevant to the Assignment
Aug.2019 -
Dec 2021
YOKOGAWA Architect
&Engineers, Inc. 2-25-2
Kamiosaki, Shinagawa,
Tokyo
141-0021, Japan
Position: Assistant
Consulting Engineer
Uganda-Ministry of
Health
The project involved improvement of Regional
Referral Hospitals in Northern Uganda.
Works carried out:
Worked on structural design reviews
Review of geotechnical/foundation
conditions design data.
Monitored project costs
Review and approval of Contractor’s
shop drawings;
Review and approval of Contractor’s
submittals such as Quality
Assurance/Quality Control Plan
Review and approve Contractor’s Work
Method Statements
Certify Contractor’s works
Delivered Structural update report as
when change in use of materials are
required and market constrains.
Lead Technical Meetings between the
Contractor and the Consultant in line
with Structural construction
Supervised testing of concrete materials
both in fresh and hardened state, steel,
cement, blocks, sand, bricks, tiles, coarse
aggregates, earthworks, and water to
ensure contract requirements are met
Lead the weekly safety patrols for
ensuring safety of people on site.
Delivered Monthly Physical Progress
Reports as provided for in the Terms of
Reference
Dec. 2017 -
JUL2019
TRI-FOCI Technical
services limited-Uganda
Position:
Structural/Quantity
Engineer
Uganda-Uganda National
Bureau of Standards
The Project involved Improvement of Calibration
Rig and Support Structure at UNBS. It involved
improving the existing Calibration rig by designing new components of the calibration rig, redesigning parking area, retaining wall,Underground water
tank, box Culvert structures and design of office
block /restaurant
Work carried out:
Over saw geotechnical Investigations
Delivered structural analysis,design and
drawings for retaining wall,Office
block/restaurant and the Underground
water tank
Delivered project specification and costs
Draft Site Instructions and response to
Contractor’s correspondences such as
letters, Technical Notes, etc.;
Prepared and made tender
assistance and procurement of Civil
Works Contractor
Participant in Kick-off meeting for
civil works;
4
Period
Employing
organization and
title/position.
Country/
Client
Summary of activities performed
relevant to the Assignment
Reviewed the Contractor’s submittals
such including shop drawings;
Reviewed and responded to
Contractor’s correspondences;
Certified/approved Contractor’s site
works
Prepared and delivered Monthly
Progress Reports to show
Contractor’s physical progress
Prepared final account of the
project works.
Dec 2014 –
Oct. 2017
DAF Value Engineering
Company Limited
Position: Project Engineer
Uganda-Warner
Consultants
The projects involved design and construction
supervision of multipurpose commercial
development in Lira City.
Work carried out:
Delivered structural analysis,design and
drawings for the commercial
multipurpose development
Delivered the structural review
calculation due to changes made in the
architectural
Delivered design for subsoil dewatering
Lead the technical team in delivering
geotechnical investigation and setting out
works on ground
Supervised construction
Monitored the project costs up
commissioning stage
Lead Technical Meetings between the
Contractor and the client in line with
Structural construction
Supervised testing of concrete materials
both in fresh and hardened state, steel,
cement, blocks, sand, bricks, tiles, coarse
aggregates, earthworks, and water to
ensure contract requirements are met.
Delivered Monthly Physical Progress
Reports as provided for in the Terms of
Reference
5
Period
Employing
organization and
title/position.
Country/Client
Summary of activities performed
relevant to the Assignment
July 2011-
Oct. 2014
Basimisa Enterprises in
Joint Venture with DAF
Value Engineering
company Limited
Position : Construction
Engineer
Uganda-Precious kids and
Primary School
Namasuba
The project involved Design and Construction
supervision of Three Storied Administration
Block, 2 blocks of class rooms each three Storied
classroom blocks housing 21 classes per block,
eight staff quarters,and parking at Namasuba-
Kampala
Works carried out:
Lead the technical team in delivering
geotechnical investigation,survey work
and setting out works on ground
Participant in Kick-off meeting for civil
work and building works
Delivered overall supervision of
construction through leading Building
surveyors, Site Quantity surveyors, Trade
foremen etc.
Supervised testing of concrete materials
both in fresh and hardened state, steel,
cement, blocks, sand, bricks, tiles, coarse
aggregates, earthworks, and water to
ensure contract requirements are met
Certified the prepared interim certificates
before presented to the project manager.
Lead Technical weekly Meetings
between the workers and the trade leaders
on site.
Lead the weekly safety patrols for
ensuring safety of people on site.
Feb 2009-
Jan 2011
DAF Value Engineering
Company Limited
Position: Construction
Engineer
Uganda-Professor Mango
John/Lovisa Mango
The project involved Design and Construction of
3 blocks of residential flats each of three Storied with associated axillary structure Kisonkole-
Kampala
Works carried out:
Lead the technical team in delivering
geotechnical investigation, survey work
and setting out works on ground and
securing Environmental Impact
Assessment Report.
Delivered the submission of plans to
KCC and secured approved plans,
commencement letter and job card.
Participant in Kick-off meeting for civil
work and building works
Delivered overall supervision of
construction through leading Building
surveyors, Site Quantity surveyors, Trade
foremen etc.
Supervised testing of concrete materials
both in fresh and hardened state, steel,
cement, blocks, sand, bricks, tiles, coarse
aggregates, earthworks, and water to
ensure contract requirements are met
Certified the prepared interim certificates
before presented to the project manager.
Lead Technical weekly Meetings
between the workers and the trade leader.
6
Period
Employing
organization and
title/position.
Country/
Client
Summary of activities
performed relevant to the
Assignment on site
Lead the weekly safety patrols for
ensuring safety of people on site.
Identified areas for variations that were
brought due to changes made by the
client after design plan approval
Jan2003-
Dec. 2008
DAF Value Engineering
Company Limited
Position: Construction
Engineer
Uganda –West Cliff Hotel The project involved Construction of conference hall,Hotel facility and axillary facilities –Nsamby- Kampala
Works carried out:
Review of geotechnical/foundation
conditions design d
Lead the technical team in setting out
works on ground.
Participant in Kick-off meeting for civil
work and building works
Delivered overall supervision of
construction through leading Building
surveyors, Site Quantity surveyors, Trade
foremen etc.
Supervised testing of concrete materials
both in fresh and hardened state, steel,
cement, blocks, sand, bricks, tiles, coarse
aggregates, earthworks, and water to
ensure contract requirements are met
Certified the prepared interim certificates
before presented to the project manager.
Lead Technical weekly Meetings
between the workers and the trade leaders
on site.
Lead the weekly safety patrols for
ensuring safety of people on site.
Identified areas for variations that were
brought due to changes made by the
client during construction.
March
2001-Dec
2002
Kwewayo Construction
Company
Position: General
Foreman
Uganda- White Fathers
Nsambya-Kampala
The project involved Construction White Father
Conference Hall and Hotel facility including
axillary Facilities.
Works carried out:
Delivered setting out works on ground.
Participant in Kick-off meeting for civil
work and building works
Supervision of construction trade
foremen etc.
Participated in testing of concrete
materials both in fresh and hardened
state, steel, cement, blocks, sand, bricks,
tiles, coarse aggregates, earthworks, and
water to ensure contract requirements are
met.
Participated in technical weekly Meetings
between the workers and the trade leaders
on site.
Participated in the weekly safety patrols
for ensuring safety of people on site.
7
Period Employing
organization and
title/position.
Country/Client
Summary of activities performed
relevant to the Assignment on site
Feb 2000-
Feb 2001
Warner consultant
Position: Field operations
Technician
Uganda-Gayaza High
school
The project involved redesigning of water system
,drainage and sewage system
Works carried out:
Delivered contour survey and
community population data
Establishment of field control survey
points
Supervision of contractors/Sub
contractors for both sewage line and
water supply system
Controlled quality of construction in
corroboration with the government
laboratories
Supervised both the quality of supplied
water and the sewage influent & effluent
from the waste stabilizing ponds
Controlled the slope stability during
excavation
Jan 1997-
Dec 1999
National Housing and
Construction Corporation
Position: Foreman
Uganda-Ministry Housing
and Urban planning
The project involved construction of a housing
estate in Bukoto and Ntinda-Kampala
Works carried out:
Delivered setting out of houses on ground
Supervised the masonry
work,carpentary,joinery,painting
work,formwork,concrete work
Delivered recruitment of casual
masons,carpenters,plumbers,painters
Delivered leveling on site in comparison
with the reference control points
Delivered setting out of sewer line
Supervised the lagoon construction
Jan 1994-
Dec 1996
National Housing and
Construction corporation
Position: Head of trade
(Masonry)
Uganda-Ministry Housing
and Urban planning
The project involved construction of a housing
estate in Bukoto and Ntinda-Kampala
Works carried out
Delivered setting out of superstructure
Supervised concrete casting, block/brick
walling & making,plastering,terrazzo
works
July 1993-
Dec. 1993
National Housing and
Construction corporation
Position: Trainee
Uganda-Ministry of
Housing and Urban
Planning
The project involved construction of a housing
estate in Bukoto and Ntinda-Kampala
Works carried out
Delivered setting out of houses using
tapes
Learning using equipment theodolite,
dumpy level, earth compacting machines,
Learning using dimension
paper,abstracting,quantifying items and
preparation of bill of quantities
Learn scheduling
Learn plan interpretation
Learn making specification
Learn coordination of items of
construction
8
Language Skills (indicate only languages in which you can work): Name: Nabbala Moses Mumpembe
Signature:
Language Reading Speaking Writing
English Excellent Excellent Excellent
Swahili Good Good Good
Luganda Excellent Excellent Excellent
French Basic Basic Basic