Post Job Free

Resume

Sign in

Construction Project Multi Family

Location:
Lake Elsinore, CA
Posted:
January 19, 2024

Contact this candidate

Resume:

*

Steven Brent Taylor

CONSTRUCTION PROJECT PROFESSIONAL

CORE COMPETENCIES AND STRENGTHS:

*Expert in Multi Family Podium Type.

*Expert in Concrete Tilt up and Commercial Office General Structures.

*Expert with VE and Implementation of Actually reading, Understanding Blueprints, Recommendations.

*Experienced with site lay out, mass grading with underground facilities

*Industrial, Commercial projects which include Street Improvement with Utilities and Parking Lots.

*Adept with Rebar identification and lay out, Structural reports, Concrete design, Steel, Site delivery.

*Expert in Interior multiple finishes, fine Millwork’s installation/Floor finishes.

*Highly skilled at Report Interpreting, Specifications, Blueprint Lay out/ Interpretation

*Proven leader capable of building award-winning Buildings.

*Consistent peak performer with an eye for detail and creative value engineering, cost, implementation.

*Strong managerial skills with construction documents.

*Capable of administering multiple projects, creating MS schedules all while increasing profits.

*Highly proficient with managing, planning, staging, and executing project plans.

*Extensive working relationship with City, County and State Agencies.

*Thorough understanding of Safety OSHA Regulations and Compliance.

*Hold an OSHA 30 Card / Safety Officer.

*Communicating Clearly with Subs for results!

Professional Experience:

General Superintendent

Responsible for 5 distinctive style podium build – 3 lots, Level 5, Historic Architecture, 3 down Podium 7 up, Hybrid Type 5,3a-3b. $120M Senior Superintendent

Responsible for a Multifamily Podium the : “Neptune” Marina Del Rey 4 separate buildings 578 units plus Marina 110 slips Marina Del Rey. 11 Supers, 2 PM, 3 Office staff. Completion of all buildings, off site, Interiors and More. Golden Nugget Award. Hybrid Type 5,3a-3b $260M. Director of Construction

Responsible for 6 Projects Mufti Family Podiums in Greater LA, 9 full support personal teams at each site. Golden Nugget Award. Hybrid Type 5,3a-3b $330 M. Commercial General Superintendent

Responsible for extensive large Tilt Ups, Commercial, Demolition, Re-modeling, Offsite Utilities wet and dry Commercial / Industrial projects. Mediate between client, architect, engineers, contractors, and City Inspectors to resolve issues and changes. Administer all aspects of building after Permit’s. 2

EMPLOYMENT HISTORY:

MILL CREEK DEVELOPMENT 2020-2024

General Superintendent

Multi Family Podiums, 7 stories 5 separate structures, Level 5, High End Themed Period Design.$130M JOHNSTON MOYER 2017 -2020

General Superintendent

Massive Multi Unit Concrete Podium 7 story multi bldgs. $260M ETCO HOMES - LENNAR 2016- 2017

Director of Construction

Multi Family Podium 3 down 8 up, Commercial Buildings, Luxury High End Residence, SOG, Multi Family.

$ 350M Aggregate Value

FULLMER CONSTRUCTION 2014 – 2016

Superintendent

Built over 2.5M square feet of tilt up industrial transportation centers. HABITURE SOUTHERN CALIFORNIA 2011-2014

Project Manager

131-acre resort development in Temecula, CA, that included a 220 Key Hotel, Winery/Restaurant, 130 Private Suites and storage facilities. This ground up proposed project included massive grading, street improvements, sewer design, reclamation, Processed all entitlements. SEASONS WEST 1991-2010

Director of Operations- formerly General Superintendent Built 4.5 million square feet of Commercial, /Industrial projects. Projects included 44 acres of shopping centers, tilt ups, (2M sq. Ft) complete build outs, masonry projects, parking lot light sanctions, Edison’s/telephone underground vaults and switch gear, pole standards, signage, parking lots, structural slabs, major road improvements, landscape installation.

Education: Loyola BS Business Management Sierra College JC Business Management Many Continuing Education online classes.

SOFTWARE: Pro Core, Bluebeam, MS Word, MS Project, MS Excel, Photoshop, cut n paste, Email, & more

OF INTEREST:

EL Camino College Instructor Blueprint - Reading and Understanding, Parsons CPM Instructor, Speak Construction Spanish, OSHA 30, Safety Officer- SWPPTS- LEEDS Proficient, Certified CPR. Certified Sexual Harassment. OSHA Equipment Operator, All current B General License B405114.

3

STEVE TAYLOR PROJECT HIGHLIGHTS LIST

Seasons-West.com: Google Completed Projects

Various Large Multifamily Podium projects $650M Aggregate

(2) Mall parking concrete structures (320) & (640) 42 Acres 1.2 M Sq. Ft. Shopping Center- Mixed use, Grocery, Home Depot, Sam’s Club, More. Seal Beach Pier

132-acre Hotel, guest suites, Amphitheater, Spa, Winery process Riv Co Graded – removed- compacted over 5.3 M CU Yards, Miles of roads and Utilities wet n dry. 32 Acres 76 Union Facilities Pasadena

Two Blocks Retail Storefront Redondo Beach

68 Acres Sports Facilities, Office Condos, Gymnasium, Olympic pools Soccer Field’s, 56 Tennis courts and more. 2 Golden Nugget Awards



Contact this candidate