NAWAZ ALI SHAH

DESIGNATION

POSTAL ADDRESS

:

Shift Charge Engineer/Operation Dept.

C/O KPS (KEPCO Plant Services & Engineering Co. Ltd), 185 MW CCPP FPCDL, 8 Km, Dad Laghari Road Daharki, Sindh Pakistan.

Email address: ad2ucu@r.postjobfree.com

PERMANENT ADDRESS

:

H.NO.131/A, Masoomi Muhalla Royal Road Sukkur Sindh Pakistan.

Mobile: +92-300******* (all time available)

Phone: Office: +92-723-******.

DATE OF BIRTH

:

12TH JAN 1975.

PASSPORT NO

:

F5393030

MARITAL STATUS

:

Married

DATE CAN START WORKING

:

One (01) Month of notice period

CURRENT SALARY

EXPECTED SALARY

:

:

300,000 PKR

4000 USD

EXPERIANCE & CAREER DETAIL:

2009 – 2020 (Presently):

1.FPCDL- Foundation Power Company Daharki Ltd (185 MW CCPP): O&M KEPCO-KPS Plant Services & Engineering Company Ltd (Korea Multinational Company).

Position/Roll: Shift Charge Engineer/ Operation

Units Covering

Gas Turbine GE (Frame: GE-9E)

Generator (GE): Capacity 121 MW Single Shaft.

Steam Turbine (FUJI Elect. Japan)

Generator (FUJI Elect. Japan): Capacity 64 MW, Single Casing.

HRSG-HP/LP dual Drums (Doosan Korea): Heat Recovery Steam Generator.

2 Black-Start Emergency Diesel Generators 2.5MW each : (Agretake Germany)

6 kV, 11kV,15kV & 132 / 220kV Switching & Distribution control.

220 kV Switchyards’-AIS Type (SIEMENS).

CCR: DCS: Honeywell (BOP), MARK-VIe (GT), Ovation: (Stm. Turbine).

Gas Sweetening, Filtration & Condensate Separation & Heating/Gas Metering.

Gas receiving, Reducing & Control (36 to 26 bar)/ Auto Flaring System.

Demin Water Treatment DCS - PLC type (100 m3/hr).

Rivers Osmosis (R.O Units) 2No. Trains 200 m3/hr.

Work started during Startup-Commissioning as Operation Sr. Engineer (EPC-DOOSAN KOREA), & carried out Successful Commercial Operation Date (COD).

Integrated Management System (IMS): Lead Auditor Team Member (Audit & training field) ISO: IMS-OHSAS 18001:2017, ISO 14001:2015, ISO 9001:2015.

1998 – 2009:

2.TNB LIBERTY POWER LTD – (CCPP): Capacity 235 MW Ops. Mode Combined Cycle Power Plant (Malaysia Multinational Company Tenaga Nasional Barhad Pakistan).

Work started during Project & Commissioning with EPC-ANSALDO Italy, RRT & COD carried out.

Position: Shift-charge Engineer

Units Covering:

Gas Turbine Generator: (V-94.2 Siemens): 160 MW Single Shaft.

Steam Turbine Generator: (German/Siemens): 75 MW, Single Cylinder.

HRSG-HP/LP dual Drums (CMI Belgium): Heat Recovery Steam Generator.

ABB HMI Power Generation Portal (PGP Rev. 4.0).

6 kV, 11 kV,15kV & 132kV Switching & Distribution Control.

Gas Sweetening, Filtration & Condensate Separation & Heating/Gas Metering.

Gas receiving, Reducing & Control (36 to 26 bar)/ Auto Flaring System.

Demineralization Water Treatment (200m3/hr), RO-2 Units 100m3/hr each.

Technical On-Job Training: Conducting (OJT) on job technical trainings.

3.RAS ABU FONTAS QATAR (Q.R.A.F) – Generation & Desalination Station Doha Qatar: 600 MW & 70 Million Gallons / day Distillate water.

Steam Turbine Generator (Anslado): 75 MW, Single Cylinder.

Position: Shift Engineer: Desalination/Generation (Doha Qatar)

RAS ABU FONTAS (R.A.F) Qatar: Capacity 600 MW & 70 Million Gallons/day Distillate water.

Electrical: 132-kV/11-kV/6 kV & 380V distribution & switching.

Units Covering:

Gas Turbines Generators

4 - Kraft Werk Union – 45 MW each

4 - Mitsubishi Elect. Corporation – 56 MW each

2 - Fiat TTG Torino Italy - 15MW (Black-start Diesel Generators)

Desalination & Distillate Treatment Systems.

1. SIR (Italy), 2. WW (United Kingdom), 3. SHI (Japan)

Distillers: Cross Tube Multi Stage, Flash-Vapors Type.

Boiler (Supplementary Firing (CMI Belgium): Heat Recovery Steam Generator.

DCS System: Elsag Bailey INFI90 OIS.

Filtration & Condensate Separation & Heating/Gas Metering.

Gas receiving, Reducing & Control (36 to 26 bar)/ Auto Flaring System.

EDUCATION

:

Bachelor of Engineer “Chemical Technology” from NED University of Engineering Science & Technology Karachi Pakistan.

:

University of Tenaga Nasional (UNITEN) Malaysia: Power Plant Operation (C.C.P 300 MW ABB Pro Control 20)

PROFESSIONAL & HSE TRAININGS:

1. Fire & Explosion Hazards, 2. Health Environment & Safety (HES), 3. Self-Contained Breathing Apparatus (SCBA), 4. Fire & Safety - Accident Prevention (HSE), 5. Training Techniques for Trainer’s, 6. Management Production Operations, 7. ABB HMI Power Generation Portal (PGP Rev. 4.0), 8. Fire & Safety – Advance Fire Fighting System, 9. Developing Performance Management System & its Implementation, 10. DCS (Distributed Control System), 11. Permit To Work (PTW), Log-out/Tag-out system,

Have Passed 1st CLASS BOILER Competency Certificate..

Roll & RESPONSIBILITIES:

Leading Generation & Operation department:

1.PPA: (Power Purchase Agreement) reviewing/checking.

2.GSA: (Plant Gas Supply Agreement) reviewing/checking.

3.Closely check Plant Daily Energy Report check (Efficiency/Capacity Factor & Heat Rate).

4.Developing and implementation of the plant performance plan and efficiency improvement.

5.Carry out ACT (Annual Capacity Test) & Equipment performance testing.

6.Company-O&M: Operation & Maintenance Agreement) reviewing/checking.

7.IMS (ISO): (Instigated Management Standard) certification implementation and checking.

8.Monitoring & Review Daily Energy Reports, Daily Operation Reports and monthly O&M report inputs.

9.Perform root cause and cost/benefit analysis of performance deficiencies.

10.Collect & Compile documentary requirements/reports for monthly energy billing & fuel consumption and other as for Power Purchase Agreement (PPA), Gas Supply Agreement (GSA), etc. send to Owner.

11.Ensure compliance with Governmental and Company policy/ regulations in respect of Environmental, Health and Safety aspects and obligations.

12.Daily monitoring plan performance & initiates corrective action.

13.Day to day Operational & Safety issues discussing.

14.Prepare/Implementing Maintenance plan for PM/CM (Preventive Maintenance & Corrective Maintenance) for Weekly/Monthly/Yearly and GT Offline Compressor Water Washing & GT-CI Outages.

15.Ensuring effective on-job trainings and development.

16.Health & Safety & Environment ISO policy Monitoring.

17.Daily MP2 & Defect review, and Project Improvement meetings.

18.Plant Operational Statistics preparing.

19.On-Job Technical Training: Arranging (OJT) On-job technical trainings.

20.Daily Plant Efficiency, Daily Event report, Monthly production and activities reports preparation.

21.Executing MP2 System, and Permit Coordinator for the LOTO System (PTW) for safe equipment maintenance.

22.Investigation to determine cause(s) of incident & recommend appropriate corrective future preventive actions.

23.Generate various reports include Equipment Non-Availability status, W.O’s, Failure Analysis, Plant Outage request.

Work in Project / Commissioning & Team Member of Plant Analysis:

I have started my carrier during Projects of Power plants: Operation/Commissioning Analysis.

1.RAS ABU FONTAS (R.A.F) Qatar : Capacity 600 MW & 70 Million Gallons/day Distillate water.

2.TNB LIBERTY POWER LTD : Capacity 235 MW Ops. Mode Combined Cycle Power Plant.

3.Foundation Power Company Ltd : Capacity 185 MW Ops. Mode Combined Cycle Power Plant.