Mark Tillotson

916-***-****

Business & Personal

References upon request

MARK TILLOTSON

SENIOR PROJECT MANAGER / SENIOR ESTIMATOR

Mr. Tillotson graduated from Chabot College with a degree in Construction Technology. His ability to successfully manage operations comes from more than 40 years of construction experience as a General Contractor as well as an Owner of a construction company. Mark has also continued his education in Construction Management and Claim Avoidance.

UC Davis

Peter J. Shields Library PROJECT ROLE AND RESPONSIBILITIES

Mr. Tillotson is responsible for direct supervision over all assigned projects. Mark provides leadership and guidance to the team to assist them in planning, implementing and coordination of the work, securing timely and economical completion of all projects with high quality and profits consistent with the established goals and missions. Mark reports to the President assuring that all job functions shall be accomplished including safe work practices, instructing all subordinates in, and enforcing all OSHA safety requirements/guidelines, in addition to all company policies and procedures. He is held directly accountable for safety performance, field production & quality. Monitors job cost, schedules, and quality of work. Reviews projects to be bid or negotiated as to staffing, planning, schedule, labor cost, construction methods and equipment needs. Selects and places key personnel for field assignments. Necessary record keeping including inventory and location of tools and equipment. Assist in project development and client maintenance. Assist in the recruiting and training of personnel. Consults with Principals on major system and equipment purchases. Estimate, prepare bid scopes and bid evaluations, write / review subcontracts and purchase orders to assure that the scope of work is accurate and complete. Monitors overall quantity and quality of work performed by the Company.

REPRESENTATIVE EXPERIENCE

•Multi-Family Affordable and Market Rate Housing Projects.

•Tenant Improvements to install big box stores, Hobby Lobby, Burlington, Grocery Outlet Five Below in subdivided shopping centers.

•Hollister Courthouse Multiple Prime Exterior Enclosure

•UCDMC Cancer Center Expansion Multiple Prime Contractor

•Folsom Lake College Performing Arts Building Multiple Prime Contractor

•University of California Davis Veterinary Medicine 3A Building, Davis, CA; $60M, new, two, multi-level laboratories totaling 159,220 sf.

•Folsom Lake College Visual and Performing Arts

•UOP Chambers Technology Center

•University of California Davis Robert Mondavi Food and Wine Institute, Davis, CA; $61M, new 185,000 sf, 2 three-story building and 1 two story wine institute.

•UC Merced Science & Engineering Building - Merced, CA; $58 M, new 173,000 sf, three-story, steel and concrete frame building.

•New Folsom Library, Folsom, CA ; $12 million, 24,000 square foot multipurpose library.

•Western Placer Waste Materials Recovery & Composting - Roseville, CA; $12 M, renovation and addition of 177,037 sf.

•California State University East Bay - Hayward, CA; $18.9 M, new three building concrete foundation, structural steel frame, metal deck roof structure metal roof deck, built-up roof, and split system HVAC.

•UC Davis Peter J. Shields Library- Davis, CA; $9 M, 5-level, poured-in-place concrete, lower level and structural steel upper floors, and the exterior is a combination of window wall system and aluminum skin.

•Franchise Tax Board, Sacramento, CA; $21M, 500,000 sf of renovations in buildings

MARK TILLOTSON

SENIOR PROJECT MANAGER

1 & 2 of the Sacramento Franchise Tax Board Facility.

•Arcohe Middle School Addition - Herald, CA; $5.2 million addition of a gymnasium, construction and installation of three portable modular classroom buildings and all associated site and road improvements totalling 20,000 sf.

•Stanford University Cecil H. Green Earth Sciences Research Building - Palo Alto, CA; $12 M, structural steel frame, two million volume research library.

•Stanford Memorial Church - Palo Alto, CA; $8 M, renovation and structural repair of historical landmark building.

•Stanford University Robert Crown Law Library and Classroom - Palo Alto, CA; $5 M, two-story, one million volume law research library, including a moot courtroom and classrooms.

•Sacramento Airport Dispensing Facility, Sacramento, CA; $3 M, 7,200 sf., fuel dispensing facility which includes three preengineered, slab on grade, metal roof buildings.

•Douglas Ridge Executive Office Building - Roseville, CA; $9 M, 100,000 sf, Class A, three story, structural steel frame office building.

•FedEx Sacramento Hub Expansion, Sacramento, CA; $8.5 M, $8.5 million, phased project totaling approximately 53,500 sf. consists of the construction of the 45,000 sf. steel structure Hub Expansion at Fed Ex's Sacramento Package Distribution Center. T

•Colusa Co-Generation Power Plant, Colusa, CA; $4.2 M, new, 12,120 sf, preengineered metal building to house a Co-generation plant from which both power and heated water.

Folsom Public Library Georgia Murray Building

•Napa County Juvenile Justice Center - Napa, CA; $11.9 M, phased, new 45,000 sf., two-story, Juvenile Justice Center with slab-on-grade, concrete masonry unit walls and steel frame roofing assemblies.

•Rocklin Police Station - Rocklin, CA; $9.2 M, new single-level police building of 40,000-square-feet, a new storage building of 3,600-square-feet, and site development of 4 acres.

•Murray Place Parking Structure — Bell, CA; $5.6 million, 1-level above-grade, 35-car masonry parking structure.

•Verdugo Towers Inc. Parking Structure — Burbank, CA; $9.1 million, 1-level

below-grade, 50-car, cast-in-place parking structure.

• P& P Homes for the Elderly, Inc. Parking Structure — Los Angeles, CA; $6.1

million, 1-level below-grade, 48-car, masonry parking structure.

• Casa Corazon Parking Structure — Long Beach, CA; $2.2 million, 1-level

above-grade, 19-car, masonry parking structure.

• La Brea/Franklin Parking Structure — Los Angeles, CA; $4 million, 1—level

above—grade, 75-car, Masonry and C.I.P. concrete parking structure.

MARK TILLOTSON

SENIOR PROJECT MANGAER

Rocklin Police Station

• Casa Corazon Parking Structure — Los Angeles, CA; $6.5 million, 2—level

below—grade, 105-car, C.I.P. parking structure.

• 1300 I Street Office Building & Parking Structure — Sacramento, CA; $4.3

million concrete package for office building and 6—level, 500-car, post tension parking structure.

• Kaiser Santa Rosa Parking Structure — Stockton, CA; $4.2 million, 4—level,

788-car, post tension parking structure.

• Arden Fair Parking Structure — Sacramento, CA; $4.1 million, 1— level, 620-

car, post tension parking structure.

• City Center Garage West Parking Structure — Oakland, CA; $15.5 million,

9—level, 1546-car, post tension parking structure.

• Moreno Valley Mall Parking Structure — Moreno Valley, CA; $4 million,

2—level, 682-car, post tension parking structure.

• Newpark Mall Parking Structure — Newark, CA; $4.5 million, 3—level, 1000-

car, post tension parking structure.

• Mercy Redding Parking Structure — Redding, CA; $3.1 million, 4—level, 502-

car, post tension concrete parking structure.

• Market Street parking Structure — Stockton, CA; $5.9 million, 4—level, 779-

car, post tension parking structure.

• 1325 J Street Office Building & Parking Structure — Sacramento, CA; $8

million concrete package for office building and 7—level, 577-car, post tension parking structure.

• Arden Fair Parking Structure — Sacramento, CA; $2.7 million, 3—level, 783-

car, post tension parking structure.

• Kaiser Foundation Parking Structure — Hayward, CA; $5.3 million, 4—level,

675-car, post tension parking structure.

• Ma Maison Hotel Sofitel & Parking Structure — Hollywood, CA; $22.9 million

hotel and a 2—level underground, 400-car, post tension concrete parking structure.

• Concord Gateway Phase II Office Building & Parking Structure — Concord,

CA; $18.3 million office building and 8—level, 950-car, post tension concrete parking structure.

• Ramada Renaissance Hotel & Parking Structure — Walnut Creek, CA; $ 19.8

million hotel and 4-level underground, 650-car, post tension concrete parking structure.

• 1333 North California Boulevard Office Building & Parking Structure —

Walnut Creek, CA; $ 16.8 million office building and 2—level underground, 640-car, post tension concrete parking structure.

MARK TILLOSTON

SENIOR PROJECT MANAGER

Arcohe Middle School Addition

• The Terraces Office Building & Parking Structure — Pleasant Hill, CA; $9.2

million office building and 1—level underground, 1—level suspended, 500-car, post tension parking structure.

• Lot "G" Parking Structure — Sacramento, CA; $5.3 million, 6—level, 1350-car,

precast concrete parking structure.

• Lot "C" Parking Structure — Sacramento, CA; $2.8 million, 2—level

underground, 325-car, post tension concrete parking structure.

• Harrah's Parking Structure — Reno, NV; $3.3 million, 10-level, 1000-car, post

tension concrete parking structure.

• Addition to Harrah's — Lake Tahoe, NV; $2.2 million, 3-level, 450-car, precast

concrete parking structure.

• Benvenuti Plaza Parking Structure — Sacramento, CA; $3.4 million, 7-level,

post tension parking structure.

• The Atrium Parking Structure — Irvine, CA; $4 million, 4-level, 1040-car,

precast concrete parking structure.

• 60 South Market Office Building & Parking Structure — San Jose, CA; $3.6

million office building and 5-level, 650-car, post tension concrete parking structure.

• Concord Gateway Phase I Office Building & Parking Structure — Concord,

CA; $16.7 million office building and 7-level, 950-car, post tension concrete parking structure.

• Grower's Square Office Building & Parking Structure — Walnut Creek, CA;

$15.8 million office building and 6-level, 500-car, post tension concrete parking structure.

• Capitol Bank of Commerce Office Building & Parking Structure — Sacramento,

CA; $31 million office building and 6-level, 900-car, post tension parking structure.

• Sutter Hospital Parking Structure — Sacramento, CA; $2.2 million, 3-level,

600-car, precast concrete parking structure.

• 1550 K Office Building & Parking Structure — Sacramento, CA; $7.3 million

office building and 4-level, 400-car, steel parking structure.

• Vista Montoya Condominiums & Parking Structure — Los Angeles, CA; $8.6

million condominiums and 1-level underground, 300-car, post tension concrete parking structure.

• Angelus Plaza Housing Complex & Parking Structure — Los Angeles, CA; $40

million housing complex and 4-level, 310-car, concrete parking structure.



Contact this candidate