THOMAS P. PERKINS IV
**** ****** ***** **., *******, Fl. 32566 / Phone: 440-***-****
Email – ad2tvh@r.postjobfree.com
EXPERIENCE:
**/** ** **/** Refuel / Forced Outage Scheduler
* Develop & maintain detailed / levelized schedules (PROJECT/2) – Primavera / Versions P3, P5 & P6).
* Identify work scope (WO's, repet. tasks, SVI's, DCP's, etc.) for implementation in refueling & forced outages.
* Interface with various units & work groups for schedule input & development.
* Monitor & update refuel outage prerequisite activities for schedule impact.
* Analyze critical path for indication of potential problems / conflicts.
* Assist in the development of the "Plan of the Day" (POD) which depicts work evolutions, plant status / configurations & a summarization of outage progress.
* Analyze & review schedule progress for submittal & perform schedule maintenance. 4/93 to 11/94 Integrated Project Scheduler
* Responsible for development & maintenance of detailed / levelized schedules (PROJECT/2) of Design Change Packages from conception to installation.
* Interface with Senior Project Engineers & Engineers for resource availability & schedule implementation.
* Interface with On-Line scheduling unit to schedule field installation based upon plant conditions & functional equipment groupings.
* Interface with Materials unit to ensure parts availability to support scheduled dates for installation. 2/86 to 4/93 Refuel / Outage Scheduler
* Develop & maintain detailed / levelized schedules (PROJECT/2).
* Identify work scope (WO's, repet. tasks, SVI's, DCP's, etc.) for implementation in refueling & forced outages.
* Interface with various units & work groups for schedule input & development.
* Monitor & update refuel outage prerequisite activities for schedule impact.
* Analyze critical path for indication of potential problems / conflicts.
* Assist in the development of the "Plan of the Day" (POD) which depicts work evolutions, plant status / configurations & a summarization of outage progress.
* Analyze & review schedule progress for submittal & perform schedule maintenance. 10/85 to 2/86 Project Work Center Scheduler
* Coordinate / schedule work activities for Instrument & Controls (I&C) section.
* Interface with Operations and I&C to ensure critical & priority items were worked.
* Expedited parts & other restraints to support work activities. 11/84 to 10/85 Unit Scheduler (Nuclear Test Sect.-NTS)
* Develop & maintain manual system schedules to support Pre-operational and Acceptance testing for the Electrical, BOP (Balance of Plant) & the ILRT (Integrated Leak Rate Test) groups.
* Interface with support groups to assist in the successful completion of testing.
* Expedite / deliver parts in support of the containment ILRT. 7/81 to 11/84 Installation Monitor Tech.
* Visual inspection of pipe hangers / supports and piping spools / welds.
* Inspect to fabrication sheets / related paperwork and isometric drawings. 1/81 to 7/81 Mail Clerk
* Circulation of mail throughout the Perry job site.
* Perform miscellaneous errands for supplies / blue prints. Employers:
* Worked at the Perry Nuclear Power Plant from 1/81 to 12/23 (42 yrs.)
- Energy Harbor (2019 to 12/23)
- FirstEnergy (11/97 to 2019)
- Cleveland Electric Illuminating Co. (2/88 to 11/97)
- National Inspection and Consultants Inc. (12/87 to 2/88)
- Kaiser Engineering (7/81 to 12/87)
- Kelly Employment Services (1/81 to 7/81)
Education:
1980 - 1981 Youngstown State University - general studies 1987 PROJECT/2 Outage Scheduling Course
1987 Perry Fundamentals
1988 Introduction to SAS
1989 Lakeland Community College - generals studies 1990 Various PROJECT/2 Training Courses
1991 System and Integrated OPS Training Program
References:
Available upon request.