Post Job Free

Resume

Sign in

Los Angeles Construction Superintendent

Location:
Los Angeles, CA
Posted:
January 10, 2024

Contact this candidate

Resume:

David Ackerman

Los Angeles, CA. *****

626-***-****

Mr. Ackerman meets the requirements for Constructability Review Specialist- General as summarized below. This experience is described in detail in the following section, Employment History & Project Experience.

GENERAL EXPERIENCE / MINIMUM REQUIREMENTS

Minimum Requirements

Required Experience:

15 years full time paid professional experience as a Project Superintendent on a public/educational facility construction and/or large commercial projects with full responsibility for coordinating complex projects with construction value of a single project in excess of $30M with a combined cumulative project value of $400M.

. Dynamic Construction 3 years

Walton Construction Services, 3 years

Universal Studios, 2 years

North Dakota Commercial Construction, 1 year

UCAL Construction, 5 years

D&D Development, 1 year

AGC Developers, 11 years

Tom Torre Designs, 2 years

Minimum of two (2) years college level coursework from a recognized college, university or trade school. Five (5) years additional experience may be substituted for the educational requirement.

Northwestern University

High School Diploma

30 years constructions’ experience.

Dynamic Construction

Los Angeles, CA. 11/2019 -2022

Construction Superintendent / Project Manager

Performed all buyouts and performance schedule

Worked all three weeks look ahead

Safety meeting, all tailgate meeting using a weekly topic,

Worked with Architects, Engineers, City Inspectors as wee

as scheduling with all trades, as well asl deputy inspectors

Scheduled all deliveries from trades.

EMPLOYMENT HISTORY & PROJECT EXPERIENCE Walton Construction Services

Los Angeles, CA (11/2016 – 04/2019)

Construction Superintendent

Managed construction low income apartments projects – new construction.

Scheduled all trades and buy outs.

Responsible for safety standards and procedures.

Performed quality control through each phase of construction.

Worked directly with Architects, ( UAL) Engineers ( LaBiib)

All deliveries

Universal Studios

Los Angeles, CA (02/2014 – 05/2016) Construction Superintendent

Project: Universal Studios - 150Million

Worked directly with the General contractor (Clark Construction).

Worked with all ride show engineers, Architects and Finance officers.

Kept budgets, responsible for a three week look ahead.

Conducted all white board meetings. Worked in conjunction with all sub-contractors for scheduling and progress of all phases of construction.

Worked with safety officers from Universal corporate to Clark construction as well as consultants.

North Dakota Commercial Construction

Fargo, ND (2013)

Construction Superintendent

Scheduled all material and labor, worked with Project Managers, Architects, Engineers.

Managed and built two building, four hundred and fifty feet and five hundred feet. 500 and 500 unit apartments with subterranean parking.

Scheduled electricians, plumbers, framers, modular framing. excavation, building and safety.

Performed all aspects of construction.

UCAL Construction

Los Angeles, CA (2007 - 2012)

Project Superintendent

Project: L.A. Trade Technical, L.A.P.D - $00M Project: Anaheim High School, DSA project - $00M

Scheduled all trades and weekly Construction Meetings.

Responsible for R.F.I.'S, Sweep Reports Summary Logs, Weekly SSI. Reports, and Daily Labor Logs.

Conducted and observed all safety meeting from each trade, Responsible for no abatement work at site.

Planned, organized, and directed activities concerned with the construction and maintenance of structures,

Prepared and submitted budget estimates and progress and cost tracking.

Prepared contracts and negotiated revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and sub-contractors.

Collaborated with all Engineers, Architects, Owners Representatives, Inspectors of Record, Deputy Inspectors. I.O.R on site, through all phases of construction.

D & D Development

Los Angeles, CA (2006 - 2007)

Project Superintendent

Worked directly with Architects, Structural Engineers, building Inspectors.

Oversaw all Sub-Contractors.

Negotiated all bids for pre-construction, materials and labor as well as all vendors.

Scheduled all contractors and utility services for each project.

Ensured that all projects met code at each phase of construction.

Ensured all housing tracts were completed on time and on budget.

AGC Developers

Los Angeles, CA (1995 - 2006)

Project Superintendent

A.G.C. is an affordable housing T.C.A.C, Tax Credit Association of California State funded affordable housing.

Followed all federal and state guidelines and requirements.

Negotiated all pre-construction bids with sub-contractors and material vendors.

Maintained all contracts, set all timeline schedules during construction.

Interacted with Architects, visiting funding Architects, Structural Engineers, and Builders.

Tom Torre Designs

Woodland Hills, CA (1993 - 1995) Project Superintendent

Inspected all work on a constant basis and kept a site log of daily events R.F.I.'S Materials Certifications.

Responsible for T.C.A.C. compliance regulations and the state building codes.

Responsible for eleven retail facilities, seven state funded buildings, two condominiums and retail developments.

Oversaw all hardscapes, pools, decks, and architectural walls, concrete driveways.

Worked directly with clients. Scheduled vendors and sub contractors. Made sure that all projects were completed on time and on budget.



Contact this candidate