IRFAN ALAM

Contact: +966*********, +966*********, +917*********, +919*********

E-Mail: ad2mgy@r.postjobfree.com / ad2mgy@r.postjobfree.com / ad2mgy@r.postjobfree.com, SkypeID: irfanalam2005

Iqama No. 254-***-****, valid till 17th October 2024 (Transferable) Goal-oriented professional targeting challenging opportunities in Design & Detail Engineering/Site Construction/ Supervision/Testing/Factory Inspection with a growth-oriented organization of repute in Engineering Consultancy/ Construction/ Oil & Gas industry P R O F I L E S U M MARY

A competent professional with nearly 18 years of experience in:

~ Project Development & Maintenance ~ Quality Assurance & Control ~Detail Engineering

~ Erection & Commissioning ~ Operations & Maintenance ~Team Management

~ Greenfield ~ Brownfield ~ Shutdowns

Working with Zamil Offshore Services Company as a Piping Superintendent, Khobar, Kingdom of Saudi Arabia since 23rd July 2023 to till date.

Worked with Al Yamama Company for Trading and Contracting as a Project Manager, Jubail, Kingdom of Saudi Arabia since 28th September 2022 to 10th January 2023.

Renowned for overseeing project activities from conceptualization to execution including technical specifications, stage inspections, progress monitoring, site management and manpower planning.

Expertise in managing maintenance functions for reducing breakdown / downtime & enhancing operational reliability of equipment and systems.

Skilled in managing multi-cultural teams to work in sync with corporate set parameters & motivating them for achieving business and individual goals.

Effective communicator with strong relationship building, interpersonal, analytical, problem solving and change management skills.

C O R E C O M P E T E N C I E S

Developing and implementing a stage-by-stage quality assurance and control system to ensure adherence to technical specifications/codes & standards/ contract.

Preparing & reviewing project specific Inspection & Test Plan (ITP), reviewing procedures and maintaining QC documentation to ensure adequate documented evidence is available to prove contract compliance.

Ensuring that all tests are carried out as per contract requirements.

Conducting first and second party audits, controlling non-conforming products, raising & resolving non-conformance reports and ensuring implementation of corrective/preventive actions

Reviewing manufacturing procedures, identifying areas of quality failures & advising changes for quality improvements

Controlling the complete sequential documentation of procured items for construction, pre-commissioning and commissioning till final handover

O R G A N I Z A T I ONAL E X P E R I E N C E

July 2023 to till date, Zamil Offshore Services Company, Khobar, Kingdom of Saudi Arabia Company: Zamil Offshore Services Company, Khobar, Kingdom of Saudi Arabia Owner: ARAMCO

Consultant: McDermott

Designation: Piping Superintendent

Duration: 23rd July 2023 to till date.

Key Result Areas:

Accountable for overall management administration and co-ordination of the project construction works in order to ensure that the project is realized in accordance with the Zamil Offshore Services Construction Schedule.

Informing the Director on the current status of such items as progress, cost, Safety Status, Quality Control and any site problems, through specific reports.

Liaising with the client, Statutory Authorities, etc. in order ensure that the statutory regulations regarding the conditions of work and welfare, for Zamil Offshore Services personnel are being complied with.

Reviewing the subcontractors planning, construction schedules, manpower status and equipment usage in order to accomplish the work with safety on schedule.

Ensure that appropriate safety procedures are implemented during the execution of the work, which will include the review of method statements as well as witnessing at site. September 2022 to January 2023, Al Yamama Company, Jubail, Kingdom of Saudi Arabia Company: Al Yamama Company for Trading and Contracting, Jubail, Kingdom of Saudi Arabia Client: SHARQ (SABIC)

Designation: Project Manager.

Duration: 28th September 2022 to 10th January 2023. Key Result Areas:

Successfully completed Sharq shutdown on stipulated time as a Project manager.

Accountable for monitoring, reviewing and, where required, approving the mechanical construction activities of the Contractors to ensure that all mechanical construction activities are carried out safely and fully in accordance with Company's HSE and technical requirements.

Provides management and leadership of all aspect of piping activities, Piping fabrication, Erection, Mechanical clearance, Pressure testing & Pre commissioning at the project site.

Well conversant with ASME & ASTM codes, standard and awareness with KNPC, ARAMCO, SABIC, SADARA, ORPIC, National Chevron Philips (NCP), and piping specification.

Piping Construction, Pre commissioning Specialist/ Pressure testing & Pigging and equipment installation/Alignment and pipe installation of above ground/ underground piping LTCS, A106Gr-B, Alloy steel P11, P22, SS304&316, FRP/GRP, RTR and HDPE

October 2018 to June 2021, SAIPEM S.p.A Kuwait

Company: KIPIC (KNPC) Kuwait

Organization: Saipem S.p.A

Owner: KNPC Kuwait

Designation: Mechanical Superintendent.

Duration: 20th October 2018 to 30th June 2021

Key Result Areas:

Successfully completed shutdowns in FOSP and GO Pump area on stipulated time of 30 days inside MAA Refinery.

Installation of new 30’’ Gas Oil Pipeline (2.5KM) from FOSP area to GO Pump area.

Generated reports Weekly, Monthly, Root case analysis and mitigation of project concern issue

Prepared ‘EPC’ presentations and reports to executive Managements on project status, engineering, procurement, construction and commissioning facilities and project concern issues.

Pump dismantling, overhauling procedure and Pump Installation, Pump Alignment and 4-hourTrial run test.

Attend and supervised all related rotating equipment’s maintenance of all type Pumps, compressors, turbines, agitators, blowers and other equipment’s and accessories.

January 2018 to May 2018Arabian Pipeline & Services Co. ltd (ANABEEB), Jubail, Kingdom of Saudi Arabia Company: Saudi Aramco Shell Refinery Company (SASREF), Jubail, Kingdom of Saudi Arabia Organization: Arabian Pipeline & Services Co. Ltd (ANABEEB) Owner: SASREF (ARAMCO)

Designation: Project Manager.

Duration: 23rd January 2018 to 4th May 2018.

Key Result Areas:

Reported to Project Director, regarding the Project Schedule, Progress, Project Controls, Safety and QA/QC analysis of the above projects.

Worked on Budgeting, Estimating, Cost Techniques, Prepared Change Management Report, Change Order and feasibility study, Value Engineering & Audits etc.

Maintained Equipment Delivery status / Forecast Schedule of individual packages and system.

Preparation of Field Change notice (FCN), Technical Query (TQ), Waiver, Non-Conformity Report (NCR), Site Observation Report (SOR) issued to Client and Contractor

Review Material specifications, project specification, Applicable standards and site drawings.

Coordination with client, subcontractor and third party. October 2016 to March 2017 Snamprogetti Saudi Arabia Ltd (SAIPEM) Project: Petro- Rabigh Naphtha & Aromatic Project (RP-2), Kingdom of Saudi Arabia Organization: Sanamprogetti Saudi ArabiaLtd (SAIPEM) Owner: ARAMCO

Designation: Piping Superintendent.

Duration: 11th October 2016 to 2ndMarch 2017

Key Result Areas:

Dealing with contractual matters with subcontractors, monthly invoice confirmations against the actual work progress

Managing Subcontractor’s Supervisor & worker in the field. Communication among planning & field workers. Highlighting potential problem to management.

Preparation of detailed execution plan for all the site activities.

Tie-ins preparations for shutdown. Thickness measurement by UT, Cold cutting, Grip Tight isolation plug installation prior to Hydro test. Tie-ins Packages preparation.

Responsible for Pre commissioning activities of piping for Air Blowing, water flushing/ chemical cleaning, Air Drying, Reinstatement, N2 Preservation, Subsystem WD, WD Punch clearance, MCC Completion, PTO Completion June 2015 to August 2016 Petrofac International Ltd., Sohar, Sultanate of Oman Project: Sohar Refinery Improvement (SRIP) Project, Joint venture between Daelim & Petrofac, Sohar, Oman

Organization: Petrofac International Ltd.

Owner: ORPIC

Designation: Construction Superintendent.

Duration: 24th June 2015 to 31st August 2016

Key Result Areas:

To monitor the Equipment Procurement, Storage, Installation, Commissioning and Testing as per Project Execution Plan with projects approved procedures and vendor recommendation.

Review, verify & approve all engineering documents for Rotating Equipment such as compressors, turbine, pumps, draft fans, Oil coolers, Fin fan coolers, special purpose water & oil pumps alignments.

After erection, check the Plumbness, orientation, elevation, anchor bolt, centre line, etc. referring to the construction drawing.

Installation of Flare, heat exchanger.

Invoicing/sub-contractor invoice clearing.

Aug’2009 to Feb'2015 Daelim Saudi Arabia Co. Ltd., Jubail, Saudi Arabia Project: SADARA Isocyanates Project, Jubail, Saudi Arabia Organization: DAELIM Saudi Arabia Co. Ltd.

Owner: DOW & SAUDI ARAMCO Joint venture

Designation: Senior Mechanical Engineer.

Duration: 19th October 2012 to 02nd February 2015

Key Result Areas:

Monitoring and reviewing the construction work-front for weakly & monthly basis.

Team spirited professional, able to handle critical situation, set priorities, clear communication, and respond positively to demanding situations. Recognize speedy, accuracy & quality of work.

Erection of the equipment, tower, reactor, and drum.

Maintaining daily manpower and equipment status.

Erection of Pump, Compressor & Static Equipment

Supervise the team for timely and accurate work execution. Ensure that all the work activities get completed as per the quality norms and as per project specification. Project: Arabian Chlor Vinyl CA/EDC (SAMAPCO) Project, Jubail, Saudi Arabia Owner: Arabian Chlor Vinyl Company- joint venture between Sahara Petrochemical Company and Ma’aden Organization: DAELIM Saudi Arabia Co. Ltd.

Designation: Senior Mechanical Engineer.

Duration: 2nd July 2011 to 18th October 2012

Key Result Areas:

Modification of Propylene, Filter, Feeder, Catalyst Pot, Agitator, Polymer Reactor, Powder Cyclone, Pellet dryer, Cooler, Silo, Agglomerate Separator, Recycle, Air, Hydrogen Compressor, Condensate Pump.

Mechanical/Loop Package, Turnover System details, Process System details, preparation for piping/Mechanical items.

Erection of Boiler, Vessels, Pumps, Static Equipment’s

Involved in Shutdown activities with replacement of pipes, Tie in activities, heat exchanger, vessels, drums etc.

Preparation of construction method statements and procedures like procedures for fabrication of piping, installation and testing of piping and structure’s, installation of equipment’s etc.

Responsible for assuring and controlling the work quality as per the approved specification and drawings.

Responding to client E-mails and communicating accordingly. Project: National Chevron Philips (NCP) South Plot Project, Jubail, Saudi Arabia Owner: Chevron /Saudi Polymer Company

Organization: DAELIM Saudi Arabia Co. Ltd.

Consultant: Worley Parsons

Designation: Piping Superintendent.

Duration: 12th August 2009 to 8th May 2011

Key Result Areas:

Preparation and issuing the Construction Method Statement (CMS) to client for approval.

Responsible for issuing the request of material purchasing through Field Purchase Requisition (FPR)

Creating and maintain a good working environment at site.

Carried out review the work schedule, priority, constrain items and accordingly support to construction group.

Follow client Quality Control Plans or inspection & Test plans.

Managed construction work of Oil, Gas Industries (Construction) with reputed ISO 9001 – 2000 Companies. Responsible for execution as per International Codes & procedures and motivate all concern to achieve target.

Ensure that all inspections are executed efficiently and expeditiously in order to comply with master construction schedule.

Organization : MOHAMMAD AL-MOJIL GROUP (MMG)

Project : TASNEE Project- Jubail, (K.S.A)

Owner : Saudi Polymer Company

Client : Fluor Saudi Arabia Co. Ltd.

Designation : Piping Manager.

Duration : 31st July 2008 to 07th April 2009

Key Result Areas:

Status report Preparation for Packages Preparation, Punch point details, MCC, Pre commissioning and other activities.

Reviewed and evaluated of vendor’s products & quotations.

Providing redesign solutions for the field problems or changes (mismatching) ensuring with the client regarding the same

Good professional Knowledge with P&ID, PFD, GA, ISO& section drawings

Carried out hydro test and pneumatic test.

Steam tracing line erection and testing.

Inspection of materials before fabrication and erection.

Preparation of punch list and mechanical clearance.

Ensured preparation and submittal of Tie-in packages (cold & hot tapping) for approval from client.

Assisted in the preparation and updating of Company’s Quality Manual and Operating Procedures in accordance with the ISO 9001:2000, Quality System

Organization : SAUDI BIN LADIN GROUP, PCM DIVISION (SBG-PCM) Project : YANPET DBN-1 Expansion Project, Yanbu, K.S.A Client : ABB LUMMUS Alireza Saudi Arabia Co. Ltd.

Designation : Mechanical Engineer.

Duration : 24th May 2003 to 21st May 2008

Key Result Areas:

Supervising and monitoring Static & Rotary equipment erection.

Supervise the preservation maintenance and inspection of mechanical equipment (Static &Rotating)

Attended, supervised pre com and preventive maintenance activities to all rotating equipment such as oil flushing, air blowing, hydro testing, and RPM, vibration and bearing temperature prior to start-up.

Clear the issue such NCR, PMT Punch, MC Punch points.

Ensuring implementation and adherence as per project specification and procedure.

Involved in all equipment installation and implement proper Quality Control Procedure and vendor supplied manual in connection with rotating and static equipment such as pumps, blowers, compressor, fin fan coolers, exchangers, vessels. HRSG, turbines, skid mounted packages.

Water Flushing and Hydro testing on Piping and Equipment

ASME B31.1, 31.3, 31.4, 31.8 ASME-SEC-I, II, V, VIII, IX API 510, 570, 620, 650, 653, ANSI, AWS D1.1

ITP’s, CMS, WPS & PQR

Organization : HALLIBURTON OFFSHORE SERVICES INC. Mumbai- INDIA. Client : Oil & Natural Gas Corporation (ONGC), (India) Designation : Mechanical Supervisor.

Duration : 20th June 1995 to 27th July. 1997

Key Result Areas:

Line checking as per P&ID and isometric drawing.

Fabrication and erection of pipe spools and supports.

Hydro testing, Punch list clearance and pre-commissioning

Reinstatements of Hydrostatic tested lines

Test pack coordination and line checking, walk down of related lines.

Coordination with Vendor representatives during stay at site for construction and pre-commissioning activities for following equipment

We shall also prepare erection procedures for submission/approval to Customer and for implementations by sub- contractors for important activities.

E D U C A T I ON

2003 M.Tech. in Mechanical Engineering with specialization in Thermal Sciences from Aligarh Muslim University, Aligarh (U.P) with First Division

2001 B.E. in Mechanical Engineering from Aligarh Muslim University, Aligarh (U.P) with First Division 1995 Diploma in Engineering (Mechanical) from Aligarh Muslim University, Aligarh (U.P) with First Division

Other Courses:

Successfully completed courses on Safe Erection Practices, First-Aid Training, Executive Development Program, Site Administration, Welding Technology, Safety Audit Techniques, Training for Trainers, Communication Skill and Presentation Skill

E X T R A C U R R I C U L A R A C T I V I T I E S

Holds the merit of being an international member of : o American Society for Mechanical Engineers (ASME) o American Society for Non-Destructive Testing (ASNT) T R A I N I N G A T T E N D E D

Holds the merit of accomplishing training on:

o Awareness & Escape from H2S Gas

o Work at Height & Fall protection.

o PTW Signatories & Supervisory safety

o Elementary first aid, fire prevention and fire fighting o Operation of fire extinguishers like DCP.CO2

o Operation of fire hydrants, deluge valve systems and MCP o Lock out Tag out (LOTO) procedures.

o Safety procedures for Tagging and scaffolding.

o All types of permit system& preparation of permits o Familiar with personal protective equipment’s and lifeguards o Barriers, barricades &fencing, Gas Mask, SCABA

o Lifting, Rigging, Excavations, Confined Space entry procedures o Elementary PPE, harness, work at heights, welding procedures o Toxic chemicals, H2S gas monitor, LEL, hazardous chemicals o JSA, Electrical Safety, Ladders, Multi gas detector IT S K I L L S

Well versed with Primavera P6, Microsoft Office Project, MS-Office, AutoCAD, Construction Integrated Management System (CIMS), Field Material Control System (FMCS) and C ++

Professional in PPM using Primavera P6 and Microsoft Office Project from CAAD CENTRE Training Services, New Friends Colony, New Delhi-11002

P E R S O N A L D E T A I L S

Date of Birth: 10th January 1977

Address: House No. S/10, Flat No. 201, Main Nafis road, Jogabai extension, Jamia Nagar, Okhla, New Delhi- 110025

Languages Known: English, Hindi, Urdu & Arabic

Marital Status Married

Nationality Indian

Religion Islam

Passport No. P4840178 (Expiring on 06.09.2026)

Declaration: I declare that the information above is true to the best of my knowledge. Being technically sound, young and enthusiastic, I am confident that I can fulfil your esteemed organization’s requirements. I wish and hope that I will get the privilege of serving your organization.

IRFAN ALAM