Address
Iraq /Kurdistan Region/Erbil City/
Italian City-2
Phone
Date of birth
Nationality
IRAQI
Link
https://www.linkedin.com/in/ali-al-ba
rwari-712662a4/
Skills
AutoCAD, Microsoft office Word, Excel
& Power Point
Design program (ETABS, SAP2000,
SAFE, CSI DETAIL)
Problem-Solving
Leadership
Teamwork
Handling conflict
Languages
Kurdish
Advanced
Arabic
Advanced
English
Intermediate
ALI S. MERZA
B.Sc. in Civil Engineering
I am a civil engineer with strong interpersonal relationships. I believe I am the right candidate for the position,
My chief quality is understanding the business relationships at this crucial stage of building Kurdistan Region, I am well into the construction sector, one of the biggest if not biggest, of the KRG economy.
If I were given the position, I will be dedicated, committed and conscientious in my job. I will make sure I reach out to create a big business connection and interpersonal network. I am from the region and I have lived throughout Iraq. I speak both Sorani and Badini as well as native level of Arabic and English, I am the ideal candidate for this role.
-Wide experience of 16 years in the infrastructure field in areas related to managing, super- vising, planning, construction and monitoring the implementation of transportation roads and bridges projects / infrastructures and roads construction (all road items)
-Has a practical experience on managing the lifecycle of roads and bridges construction projects, with a solid experience in rehabilitation roads and bridges projects in accordance with the applicable local and international specifications and standards as per the contract.
-Practical experience on small- and large-scale roads, structure and infrastructure projects in Iraq.
-Strong experience in collecting the project requirements, identifying the project scope and illustrating the project plan, executing and supervising roads projects with total administrative control.
-Specialized in supervising and monitoring the requested materials as per specification in terms of quality and quantity in roads projects in Iraq.
-Competent to review all technical submittals to ensure compliance with approved design and specifications, efficient in coordinating design and approval process of project submittals. With my Best Regards,
Ali S.Merza.
Experience
1-ERBIL (CIRCULAR LINK HIGHWAY ROADS 120m &150mp IN ERBIL) September 2015
December 2023
Structure and Infrastructure Engineer
Hemn Group Company
-Preparation the site of project and survey (Setting out, Approval of sources and types of material and plant, Clearing and Grubbing-Up
-Earth work for the road (Drainage excavations, Structural excavations, Special borrow excavations, Embankment in place).
-Install corrugated pipe type HDPE for storm system and backfilling pipe by suitable material.
-Follow up (formwork, reinforcement, pouring) drainage manholes and Box culvert, Underpass, Bridge.
-Follow up Quality Control of project and Implementation of work according to S.O.R.B Specification.
-Follow up installing iron cover with finish level of manholes Install catch basin and connected with manholes.
2-ERBIL (Orbela City)
March 2015
September 2015
Infrastructure Engineer
Trojan General Contracting
-Preparation the site of project and survey (Setting out, Approval of sources and types of material and plant, Clearing and Grubbing-Up
-Earth work for the road (Drainage excavations, Structural excavations, Special borrow excavations, Embankment in place).
-Install corrugated pipe type HDPE for storm system and sewer system and backfilling pipe by suitable material.
-Follow up (formwork, reinforcement, pouring) drainage manholes.
-Follow up installing iron cover with finish level
-Install catch basin and connected with manhole
-Follow up Quality Control of project and Implementation of work according to S.O.R.B Specification.
3-ERBIL (Hawler-Makhmor part 2-3 Highway)
March 2013
October 2014
Project manager and Road Engineer
Salaei group company
-Preparation the site of project and survey (Setting out, Approval of sources and types of material and plant, Clearing and Grubbing-Up
-Earth work for the road (Drainage excavations, Structural excavations, Special borrow excavations, Embankment in place).
-Pavement of the roads. (plant-mix base course 40cm, bituminous base course 10cm, binder course 6cm ).
-Follow up Quality Control of project and Implementation of work according to S.O.R.B Specification.
4-ERBIL (Kora – Shaqlawa- Harir- Qandeel High Way) April 2011
December 2012
Road Engineer Assistant
Al-muhandis consultant company
-Preparation the site of project and survey(Setting out, Approval of sources and types of material and plant, Clearing and Grubbing-Up
-Earth work for the road (Drainage excavations, Structural excavations, Special borrow excavations, Embankment in place).
-Pavement of the roads.( sub-base 20cm, plant-mix base course 20cm, bituminous base 10cm, binder course 7cm, wearing course 5cm ).
-Follow up Quality Control of project and Implementation of work according to S.O.R.B Specification.
5-Duhok (Construction of the Faculty of Science (G+2 floors) For University of Dohuk)
December 2009
February 2011
Site Engineer
Barokh company for construction
-Preparation of the site and survey work.
-Excavation work for the foundation as per drawings.
-checking Reinforcement concrete works for foundations, columns, and slab.
-Use bricks, block concrete for construction work.
-Site tests such as soil test, concrete test.
-Finishing work (Ceramics, plastering, painting, Electricity). 6-Iraq/ Qayarah Airport (60Km South of Mosul City) May 2008
November 2009
Project Engineer
Needham Construction Company
Installation and construction (cargo pad, runway slab, lam- shelter pad, BRC_ fence) for USA army in Qayarah Airport)
Preparation the site of project and survey (cargo pad, runway slab, lam- shelter pad, BRC_ fence) Excavation of foundation of cargo pad, runway slab, lam- shelter pad, BRC_ Fence) Construct the details of project as per drawings.
Field tests such as soil test concrete test.
Follow up Quality Control of project and Implementation of work according to S.O.R.B Specification 7-Iraq/Zakho City
February 2006
April 2008
Project Engineer
Siemens for Communication
-Instillation Fibre Optical Cable in Zakho for Communication
-Preparation the site of project and survey
-Excavation trench to limited level as per drawings.
-Instillation fiber optical cable and warning tape.
-Backfilling the trench and compacting.
8-Iraq/Duhok
January 2005
January 2006
Supervisor Engineer
Peace Winds Japan
- Construction of Building Health centers and schools
-Preparation the site of project and survey.
-Earth work for foundations (excavation and back filling).
-Build walls, slabs, fences & finishing works.
-Follow up Quality Control of project and Implementation of work according to S.O.R.B Specification.
9-Iraq/Zakho City
January 2004
December 2004
supervisor Engineer assistant
Municipality of Zakho
- Constriction of Sewer Channels and Internal Road in Zakho
-Preparation the site of project and survey.
-Excavation of sewer channel and road until the Limited elevation.
-Construct the sewer channel and road depending of the de- tails as drawings.
-Follow up Quality Control of project and Implementation of work according to S.O.R.B Specification.
Education
IRAQ/ Al-Anbar/ RAMADI CITY
November 1999
September 2003
B.Sc. in Civil Engineering
Al-Anbar University
References
1-Hemn Group company: Ali Ismael Abduljabbar
Email-ali.azawiyahoo.com
2-Trojan General Contractingn: Omar Kayser
Email-omarkaysartrojan.ae
3-Salaei group company: Shwan B.Hassan
Email-infsalaeigroup.com
Email-salaeigroupyahoo.com
www.salaeigroup.com
4-Al-muhandis consultant company: Majid Abdal
Email-majed.shabansadaconsul.com
5-Needham Construction Company: Mohammed Tawfeek
Email-hindtawfeekyahoo.com