Post Job Free

Resume

Sign in

Corpus Christi Crude Oil

Location:
San Antonio, TX
Posted:
January 09, 2024

Contact this candidate

Resume:

SAMUEL LOZANO

*** **********

CORPUS CHRISTI, TX 78410

361-***-****

ad2lpl@r.postjobfree.com

Work History

KBR, CORPUS CHRISTI, Texas

Structural Coordinator Sep 09, 2015 - Oct 28, 2016 Read structural drawings for lengthy piperack n coordinated laydown yard for sequence of Iron n equipt. to be transported out to units for proper erection.Coordinated with sub-contractor (Turner Industries) on steel erecting and all other procedures involved as in lead abatement and weld procedures on detail work;Also reported all progress reports directly back to client (Flint Hills).

Primoris Energy, Texas

Gen. Foreman (Iron/Pipe/ Rigging) Feb 02, 2015 - Aug 14, 2015 Built a Crude Oil Station for Devon Energy/ Enlink At north side of Cuero Tx. Involved all equipment, steel, n piping ; also assisted electrical depts. with heavy lifts

JV Industrial, Texas

Iron/Rigging Lead Supv. Nov 05, 2014 - Jan 07, 2015 Back up for Zachary job at Air Liquide Plant... Refurbish all piping n steel at New Unit .. Lots of RFI work involved.. Munday Co-Invista, Victoria, Texas

Lead Team Rigger Jul 20, 2014 - Oct 28, 2014

Assisted, demo of valves, piping, and equipment to be replaced by new equipment. CCC Group, Seadrift, Texas

Supervisor (Rigging Dept.) Apr 01, 2014 - Jul 15, 2014 Tear down and erect new Superheater at Seadrift Coke Plant. Set new add-on equipment to new unit which included all structural steel, piping, pumps, valves, stacks, and duct work involved in the area. Operated 30 ton Terex as needed.

Holloman Corporation, Yorktown, Texas

General Foreman Jan 28, 2014 - Mar 10, 2014

New construction involving steel erection and piping at gas facility for BHP Billiton. Supervised 14 ironworkers/riggers and crane operator at oil and gas plant which processed crude oil into jet fuel (Expansion Project). Clark Contractors, Texas

Supervisor Iron/Rig Dept Apr 01, 2011 - Dec 01, 2013 Supervised 13 employees in iron and rigging department at CFB Power Plant. Specialized in mechanical conveyor belt system, all punch-out work orders and RFI's. Operated 50 ton Grove as needed. Flour Daniel Maintenance,

Crane Operator Feb 02, 2011 - Mar 28, 2011

Operator on 50 ton crane. Assisted with supervision on setting equipment with millwrights and pipefitters. Industrial Design,

Supervisor Apr 20, 2010 - May 13, 2010

Operated a 50 ton crane at CFB Power Plant. Assisted supervision of erection and piping department. Flour Daniels, Texas

Rigger Oct 05, 2009 - Oct 22, 2009

Erecting iron and steel, piping and heavy equipment Flour Daniels,

Rigger May 02, 2009 - Jun 06, 2009

Erecting iron and steel, piping and heavy equipment Zachary Const., SAN ANTONIO, Texas

Gen. Foreman Feb 20, 2008 - Dec 23, 2008

Supervised a 7-man crew. Erected many links (welded pipe), hung risers, tube walls, water walls, and headers. Moved to leadman in the laydown yard and help with other employees on off-on loading material and equipment. Operated a 100-ton Kobelco crane and also a tower crane. Bay Ltd., Louisiana

Superintendant ( Iron and Rigging Dept.) May 04, 2007 - Dec 21, 2007 Supervised 47 ironworkers and riggers, 5-foremans, and 2-gen. foremen. Erected all steel for 2 units at Calumet Refinery in Shreveport, La., Sour Crude unit and Diesel Hydrotreater. Involved heavy lifts such as heaters, stacks, exchangers, and cooling fans. Erected 17,000 tons of steel all in all and worked side by side with Commonwealth Engineering on all RFI's throughout the whole project. Lewis Equipment, Daytona, Florida

Crane operator Oct 20, 2006 - Apr 25, 2007

Operated a 100 ton crane for commercial projects and erected tower cranes. Starcon International, Manhattan, Illinois

Lead Man in Iron Department Oct 05, 2006 - Nov 12, 2006 Read blue prints and directing crew of 12 as lead man inside of Flint Hills Refinery. Bay LTD, Texas

Foreman Sep 01, 2004 - Jul 30, 2006

Demo and rebuild of all structural, equipment, and all piping at Olefins II Unit at Formosa Plastic Plant. Add on to existing heater at same unit, all steel and piping involved.



Contact this candidate