Position Title and No.
Team Leader
Name of Expert:
K S Ramanathan
Date of Birth:
Country of Citizenship/Residence
Indian/ India
Education
#
Degrees/ Diploma Obtained
Name of the educational Institution / College / University
Dates attended
1.
Bachelor of Engineering-Electrical
Ghousia College of Engineering/Bangalore university
1987-1991
2.
Employment Record
#
Period
Employing organization and your title/ position. Contact information for references
Country
Summary of activities performed relevant to the Assignment
1.
Sep 2022 – Till date
Employer- Royal Power Turnkey Implements PVT LTD
Position: Manager Projects
India
CIDCO Project – MSEDCL –Ulwe, Navi Mumbai
Worked in 11 KV Sub–Station Project Sector wise laid various size of cables in all the flats in the building, survey and prepared the Drawing, Store arrange at site, preparing of Material details, Materials follow up, Material dispatch at site, Work allocation for Site Engineers, contactors & Manpower, Work follow up, Billing & Payment follow up.
Work Details- Cable trench work, H.T & L.T Cable laying, Mini, 8 way, 6 way & 4 way Feeder pillar erection, RMU, Panel Erection, C.T & P.T Erection, VCB erection, Cable termination, NE, BE etc…, Earthling meager checking, Transformer meager checking, Trouble shooting, Main fault attend at any panel, transformer erection. Every day stock checking and list preparing, weekly & monthly stock statement submitting to client (CIDCO) and our company.
MSEDCL & CIDCO work execution report submitting, Drawing submission.
Man power details - Supervisor – 2, Technician – 2 & Manpower – 25 No’
2.
Sep 2019 – Aug 2022
Employer- PRAYAGAA Enterprises PVT LTD
Position: Sr. Manager Projects - Electrical
India
Work Sites- Reliance Smart Hub Chitlapakkam and Reliance Smart – Pallavaram,
EPC - MEP work in IIEST Hostel projects, Kolkata.
Site drawing collection by Clint, studying the Drawing, Store arrangement at site, preparing of Material details, Materials follow up, Material dispatch at site, Work allocation for Site Engineers, contactors & Manpower, Work follow up, Billing & Payment follow up
Cable tray, Cripples or thread rod, Cabling, FSS, Smart racks, Racking area light fixing, DB’s erection, Earthling Panel Erection, Cable termination, NE, BE fixing etc. Earthling meager checking, Transformer meager checking, Trouble shooting, Main fault at any panel (or) transformer with in a time rectified of problem. UPS & Server systems. Fire fighting Systems, Plumping works Etc..
Man power details - Supervisor – 1, Manpower – 20 No’s.
3.
Sep 2013- Feb 2019
Employer- Lan-India Builders & Developers Private Ltd
Position: – Manager Projects - Electrical
India
Work location- Chennai, Tamil Ndau
Tender Quoting, Lighting and power point, lighting & Power DB, Wires & Cables / Mtrs, H.V&M.V. Panels, Transformers, Breaker, RMU & DP rates etc… Site drawing collecting & studying, Materials purchase & Payment follow-up, Material dispatch at site, Work allocation for Manpower, work follow up, Bill follow up.
Yard materials arrangement & DP yard marking, pole erection, materials LA, Disc, Pin Insulators, Her fuse, Earthing etc, Transformers Erection, Cable termination, NE, BE fixing etc.
4.
Jan 2011-Jun 2013
Employer- Feedback Infrastructure Services Private Ltd
Position: Resident Engineer (Manager Projects) Electrical
India
Work Site - MPEB Feeder separation projects. RGGVVY. Sihora, Jabalpur ( M.P). PMC Project.
Activities-Site drawing, Material dispatch at-site, Work & Billing follow up from contractors. The above mentioned co- ordinate with the contractors of EB,SE Office – Sihora. The work was completed for 46 villages under Sihora, Taluk EB.
Also did Yard materials arrangement & DP yard marking, pole erection, materials ( LA, Disc, Pin Insulators, HG fuse, Earthling, Transformers Erection, Cable termination, NE, BE fixing etc…). Feeder Separation line work. Single & Double feeder from Sub -Station to Villages.
The work was in all villages in each house given power supply with fixed Energy meter.
After completion of work, bill was prepared and submitted by the contractors. They submitted the bill after the work completion, I have checked in the site by Clint (E.B) with RE, then given the pending work as per Norms to contactors. After completion of the pending works, bill signed by both (RE & SE), after which bill forwarded to Govt aided Jabalpur (Feedback) office, then the bill was forwarded to C.E office (E.B) Jabalpur.
5.
Feb 2008 – Dec 2010
1.Employer- R.R.B ENERGY Ltd.
Position: – Sr. Engineer Projects
India
Work Sites- Gujarat & Tamil Nadu.
DP – Structure Yard materials arrangement & DP yard marking, pole erection, materials LA, Disc, Pin Insulators, Her fuse, Earthling etc, Transformers Erection, Cable termination, NE, BE fixing etc. Transformer erection, Panel erection, Rubber & PVC cable from generator to panel side, cable laying, dressing & termination. Earthling meager checking, Transformer meager checking, Trouble shooting, Main fault at any panel (or) transformed rectified it within the time.
Feeder Line:- 11Kv & 33KV Single & Double circuit feeder line work.
NOC :-Site document copy, authorization letter from customer, site drawing, site planning for all collecting from Customer and hand over to TNEB Section office.
CEIG:-Copy of NOC, site planning, Electrical schematic drawing, Building plan, Authorization letter from customer and hand over to CEIG office.
Project completion : Per year – 25 MW DP Structures erected & 15 Km’s Double feeders laid.
Employee Details - Site Engineers – 2, Supervisor-2 & Contactors – 2.
6.
Aug 2004-Jan 2008
Employer-SUZLON Infrastructure Services Pvt. Ltd
Position-Sr.Engineer Projects
India
Work Sites - Tamil Nadu,Karnataka & M.P.
DP – Structure Yard materials arrangement & DP yard marking, pole erection, materials LA, Disc, Pin Insulators, Her fuse, Earthing etc, Transformers Erection, Cable termination, NE, BE fixing etc. Transformers erection, Panel erection, Rubber & PVC cable from generator to panel side, cable laying, dressing & termination. Earthing meager checking, Transformer meager checking, Trouble shooting, Main fault at any panel and transformer rectified within the time..
Feeder Line:- 11Kv & 33KV Single & Double circuit feeder line work.
NOC :-Site document copy, authorization letter from customer, site drawing, site planning for all collecting from Customer and hand over to TNEB Section office.
CEIG:-Copy of NOC, site planning, Electrical schematic drawing, Building plan, Authorization letter from customer and hand over to CEIG office.
Project Completion: Per year – 75 MW DP Structures erected & 25 Km’s Double feeders laid.
Employee Details – Site Engineers – 2, Supervisor-2 & Contactors – 3.
7.
Jan 1998 – Oct 2001
Employer- S.S. ELECTRICAL CONTRACTOR PVT LTD
Position-–Manager Tender & Projects
India
Tamil Nadu & Karnataka
Tender Quoting, Lighting and power point, lighting &Power DB, Wires & Cables / Mtrs, H.V&M.V. Panels, Transformers & Breaker rates etc…
Project Co-Ordination activities like
Site drawing collecting & studying, Materials purchase & Payment follow-up, Material dispatch at site, Work allocation for Manpower, work follow up, Bill follow up.
Yard materials arrangement & DP yard marking, pole erection, materials LA, Disc, Pin Insulators, Her fuse, Earthing etc, Transformers Erection, Cable termination, NE, BE fixing etc.
Customer satisfaction at site quality, make of the materials as per customer requirement, Timing of work completion for customer requirement.
NOC:-Site document copy, authorization letter from customer, site drawing, site planning for all collecting from Customer and Hand over to as per TNEB Section office.
CEIG:-Copy of NOC, site planning, Electrical schematic drawing, Building plan, Authorization letter from the customer and hand over to CEIG office.
8.
Jan 1995-Dec 1997
Employer- M/S NEPC INDIA LTD as Project Engineer
Position- Project Engineer
India
Work Site- Chennai, Tamilnadu
Project coordination activities like Site drawing collecting & studying, Materials purchase & Payment follow-up, Material dispatch at site, Work allocation for Manpower, work follow up, Bill follow up.
Yard materials arrangement & DP yard marking, pole erection, materials LA, Disc, Pin Insulators, Her fuse, Earthing etc, Transformers Erection, Cable termination, NE, BE fixing etc.
Customer satisfaction at site quality, make of the materials as per customer requirement, Timing of work completion for customer requirement.
NOC :-Site document copy, authorization letter from customer, site drawing, site planning for all collecting from Customer and Hand over to as per TNEB Section office.
CEIG:-Copy of NOC, site planning, Electrical schematic drawing, Building plan, Authorization letter from the customer and hand over to CEIG office.
9.
Sep 1991-1994
Employer- SANTHI ELECTRICALS
Position-Supervisor
India
Work Site- Kanyakumari District
Yard materials arrangement & DP yard marking, Pole erection, materials LA, Disc, Pin Insulators, HG fuse, Earthling etc, Transformers Erection, Cable termination, NE, BE fixing etc.
Industrial, Commercial and Residential building wiring DB erections, Wires and Cables laid and Terminations etc…
Membership in Professional Associations and Publications:
NA
Language Skills (indicate only languages in which you can work):
Language
Writing
Reading
Speaking
English
Excellent
Excellent
Excellent
Tamil
Excellent
Excellent
Excellent
Hindi
No
No
Yes
Kannada
No
No
Yes
Malayalam
No
No
Yes
Adequacy for the Assignment:
Detailed Tasks Assigned on Consultant’s Team of Experts:
Reference to Prior Work/Assignments that Best Illustrates Capability to Handle the Assigned Tasks
As per the Terms of Reference of the Project
Project Reference 1: Royal Power Turnkey Implements PVT LTD
Name of Project: Development of power supply infrastructure distribution network including construction of 11/0.4KV substations.
Project Cost: 45 Cr’s
Year: Sep 2022- Till Date.
Location: Ulwe Node, Navi Mumbai Phase II
Client: CIDCO
Positions held: : Manager Projects
Activities Performed:
Worked in 11 KV Sub–Station Project Sector wise laid various size of cables in all the flats in the building, survey and prepared the Drawing, Store arrange at site, preparing of Material details, Materials follow up, Material dispatch at site, Work allocation for Site Engineers, contactors & Manpower, Work follow up, Billing & Payment follow up.
Work Details- Cable trench work, H.T & L.T Cable laying, Mini, 8 way, 6 way & 4 way Feeder pillar erection, RMU, Panel Erection, C.T & P.T Erection, VCB erection, Cable termination, NE, BE etc…, Earthling meager checking, Transformer meager checking, Trouble shooting, Main fault attend at any panel, transformer erection. Every day stock checking and list preparing, weekly & monthly stock statement submitting to client (CIDCO) and our company.
MSEDCL & CIDCO work execution report submitting, Drawing submission.
Project Reference 2: - Lan-India Builders & Developers Private Ltd
Name of Project : Residential and commercial Project
Project Cost: 220 Cr’s.
Year: Sep 2013- Feb 2019.
Location: Chennai, Tamilnadu
Client: Casa Grande Private Limited, IOCL Staff Quarters & VGK builders Pvt Ltd.
Positions held: Manager Projects
Activities Performed:
Tender Quoting, Lighting and power point, lighting & Power DB, Wires & Cables / Mtrs, H.V&M.V. Panels, Transformers, Breaker, RMU & DP rates etc… Site drawing collecting & studying, Materials purchase & Payment follow-up, Material dispatch at site, Work allocation for Manpower, work follow up, Bill follow up.
Yard materials arrangement & DP yard marking, pole erection, materials LA, Disc, Pin Insulators, Her fuse, Earthing etc, Transformers Erection, Cable termination, NE, BE fixing etc.
Project Reference 3: - Feedback Infrastructure Services Private Ltd
Name of Project: MPEB Feeder separation projects. RGGVVY. PMC Project.
Project Cost: 900 Cr’s.
Year: Jan 2011- Jun 2013.
Location: Sihora, Jabalpur, M.P
Client: MPEB(Madhya Pradesh EB)
Positions held: Resident Engineer
Activities Performed:
Activities-Site drawing, Material dispatch at-site, Work & Billing follow up from contractors. The above mentioned co- ordinated with the contractors of EB,SE Office – Sihora. The work was completed for 46 villages under Sihora,Taluk EB.
Also did Yard materials arrangement & DP yard marking, pole erection, materials ( LA, Disc, Pin Insulators, HG fuse, Earthling, Transformers Erection, Cable termination, NE, BE fixing etc…). Feeder Separation line work. Single & Double feeder from Sub -Station to Villages.
The work was in all villages in each house given power supply with fixed Energy meter.
After completion of work, bill was prepared and submitted by the contractors. They submitted the bill after the work completion, I have checked in the site by Clint (E.B) with RE, then given the pending work as per Norms to contactors. After completion of the pending works, bill signed by both (RE & SE), after which bill forwarded to Govt aided Jabalpur (Feedback) office, then the bill was forwarded to C.E office (E.B) Jabalpur.
Project Reference 4: R.R.B ENERGY Ltd.
Name of Project: Windmill
Project Cost: 525 Cr’s
Year: Feb 2008- Dec 2010.
Location: Gujarat & Tamil Nadu
Client: TATA Projects & TOSHIBA JSW Windmill
Positions held: Sr. Engineer Projects
Activities Performed:
DP – Structure Yard materials arrangement & DP yard marking, pole erection, materials LA, Disc, Pin Insulators, Her fuse, Earthling etc, Transformers Erection, Cable termination, NE, BE fixing etc. Transformer erection, Panel erection, Rubber & PVC cable from generator to panel side, cable laying, dressing & termination. Earthling meager checking, Transformer meager checking, Trouble shooting, Main fault at any panel (or) transformed rectified it within the time.
Feeder Line:- 11Kv & 33KV Single & Double circuit feeder line work.
NOC :-Site document copy, authorization letter from customer, site drawing, site planning for all collecting from Customer and hand over to TNEB Section office.
CEIG:-Copy of NOC, site planning, Electrical schematic drawing, Building plan, Authorization letter from customer and hand over to CEIG office.
Project completion : Per year – 25 MW DP Structures erected & 15 Km’s Double feeders laid.
Project Reference 5: M/s. SUZLON Infrastructure Services Pvt. Ltd.
Name of Project: Windmill
Project Cost: 1500 Cr’s
Year: Aug 2004- Jan 2008.
Location: Tamil Nadu, Karnataka & MP
Client: : TATA, MRF, Chettinadu Cements, Texmo.
Positions held: Sr. Engineer Projects
Activities Performed:
Yard materials arrangements & DP yard marking, pole erection, materials LA, Disc, Pin Insulators, Her fuse, Earthling etc, Transformers Erection, Cable termination, NE, BE fixing etc. Panel erection, Rubber & PVC cable from generator to panel side, cable laying, dressing & termination. Earthling meager checking, Transformer meager checking, Trouble shooting, Main fault at any panel (or) transformer within a time rectified of problem.
Feeder Line:- 11Kv & 33KV Single & Double circuit feeder line work.
NOC :-Site document copy, authorization letter from customer, site drawing, site planning for all collecting from Customer and hand over to TNEB Section office.
CEIG:-Copy of NOC, site planning, Electrical schematic drawing, Building plan, Authorisation letter from customer and hand over to CEIG office.
Project completion of target : year – 75 MW DP Structures erected & 25 Km’s Double feeders laid
Employee Details - Under controlled of Engineers – 2, Supervisor-3 & Contactors – 3.
=
Project Reference 6: M/S NEPC INDIA LTD as Project Engineer
Name of Project: Windmill
Project Cost: 470 Cr’s
Year: Jan 1995- Dec 1997.
Location: Chennai, Tamil Nadu, Karnataka
Client: Chettinadu Cements, Ramco Cements, MRF, TVS Sundaram, TVS Apex, TVS Clyton,Eveready,Texmo.
Positions held: Project Engineer
Activities Performed:
Project coordination activities like Site drawing collecting & studying, Materials purchase & Payment follow-up, Material dispatch at site, Work allocation for Manpower, work follow up, Bill follow up.
Yard materials arrangement & DP yard marking, pole erection, materials LA, Disc, Pin Insulators, Her fuse, Earthing etc, Transformers Erection, Cable termination, NE, BE fixing etc.
Customer satisfaction at site quality, make of the materials as per customer requirement, Timing of work completion for customer requirement.
NOC :-Site document copy, authorization letter from customer, site drawing, site planning for all collecting from Customer and Hand over to as per TNEB Section office.
CEIG:-Copy of NOC, site planning, Electrical schematic drawing, Building plan, Authorization letter from the customer and hand over to CEIG office.
Expert’s contact information:
Email: ad2eii@r.postjobfree.com
Phone: 944-***-****
Certification
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience, and I am available, as and when necessary, to undertake the assignment in case of an award. I understand that any misstatement or misrepresentation described herein may lead to my disqualification or dismissal by DISCOM
K.S.Ramanathan
12th November 2023
Name of the Expert
Signature
Date
Sanjay Kokru
15th November 2023
Name of the Authorized Representative of the consultant
Signature
Date