Albany, Ga *****
ad2e9p@r.postjobfree.com
William Cosby
SKILLS
• Material handling • VoIP
• Blueprint Knowledge • Troubleshooting and Repair
• Equipment Installation • Water Treatment Systems
• Plumbing • Electrical Work
• Equipment Maintenance • Fiber Optic Installation
• Telecommunications • Electrical Installations
• OSHA Standards • Crew Leadership
• Forklift Operation • Low Voltage
• Telecommunications Wiring • Adaptability and Flexibility
• Maintenance
EXPERIENCE
CGL Companies, Albany GA Maintenance Technician
April 2021 - May 2023
• Improved equipment functionality by conducting regular maintenance checks and repairs.
• Successfully completed complex repair tasks within tight deadlines, minimizing disruptions to daily operations.
• Followed work orders and specifications for machine and equipment replacement, repair, or maintenance.
• Maintained restroom functionality by repairing leaking faucets, clogged toilets, and other equipment.
• Performed electrical and mechanical repairs of production equipment to minimize downtime.
• Rewired and replaced faulty electrical components in equipment.
• Continuously adhered to strict regulations as well as detailed instructions, guidelines and specifications.
• Collaborated with team members to complete larger repair projects efficiently.
• Operated varied hand and power tools to complete repairs. Sowega Power Station, Baconton GA Outside Plant Technician May 2020 - April 2021
• Increased network reliability by installing, maintaining, and repairing outside plant equipment.
• Reduced network downtime through preventive maintenance measures and swift response to emergency repairs.
• Improved water quality by conducting routine testing and analysis of samples.
• Improved gas turbine system efficiency by conducting thorough maintenance and inspections.
• Ensured safe working environment by adhering to safety protocols and guidelines during maintenance tasks.
• Conducted tests on gas turbine systems, analyzing results to verify proper functionality.
• Tested water and condensate to check safety and compliance with regulations.
• Maintained power plant compliance with industry safety and environmental standards.
• Performed routine preventative maintenance on power plant equipment.
• Diagnosed and resolved operational issues affecting power plant equipment function or performance.
• Completed daily inspections and tests on plant equipment and documented findings.
• Examined and adjusted valves, pumps and other equipment to verify proper functioning.
CCi Services, Albany GA Lead Cable Technician
May 2014 - September 2020
• Improved project efficiency by skillfully leading cable installation and repair projects, ensuring timely completion.
• Enhanced customer satisfaction by providing exceptional service during cable installations and troubleshooting issues.
• Managed a team of cable technicians to ensure high-quality work and adherence to safety standards.
• Performed thorough inspections of completed work to ensure compliance with client specifications and industry standards.
• Operated equipment, vehicles, and tools with optimal safety procedures to prevent injuries.
• Tested cables using tools such as volt-OHM meters, spectrum analyzers, and signal level meters.
• Performed troubleshooting of systems with techniques such as speed and ping tests.
• Confirmed compliance with all industry standards and regulations related to cabling and telecommunications.
• Planned layouts and ran cable into buildings and through walls, attics, and crawl spaces.
• Read blueprints and schematics to correctly place equipment.
• Trained junior technicians on proper installation techniques and troubleshooting procedures, ensuring consistent service quality across the team.
• Efficiently troubleshot fiber-optic connections resulting in quicker restoration of services following outages.
• Increased network reliability through meticulous fusion splicing, termination, and testing of fiber optic cables.
• Improved system performance by installing and maintaining low voltage cable systems.
• Demonstrated expertise in various types of low voltage cabling, including CAT5e, CAT6, fiber optic, and coaxial cables.
• Reviewed blueprints and project specifications ahead of time to fully understand all key details of the job.
• Streamlined the installation process using specialized tools designed for low voltage cabling tasks.
• Maintained a clean work environment during installations, minimizing disruption to client operations.
• Maximized cable efficiency by following best practices for cable routing, spacing, and termination techniques.
EDUCATION
Dougherty Comprehensive High School, Albany GA — High School Diploma
August 1994 - May 1998
SUMMARY
I offer 8+ years of Lead telecommunications expertise with proven history of hard work, dedication, and dependability. I have strong knowledge of hand and power tool operation and safety measures. I traveled to different cities and states, working on government and non government facilities. I have knowledge of different work categories and industries, from interpreting blueprints, doing electrical work, plumbing, all the way to home remodeling. I am very dedicated and driven with my work! I can greatly work with a team or alone. I go above and beyond to make sure my work is completed as well as correct.