CURRICULAM VITAE

Post Applied for Mechanical Piping Engineer

Mohammad Ijharul haque E-Mail- ad2dzb@r.postjobfree.com

Mobile: No +91-910******* / +91-900******* S - Skype -Haque.izharul1

Personal Summary

Name as Passport: HAQUE IJHARUL MOHAMMAD

Date of Birth: 27/September/1982 Place of Birth: Siwan, Bihar, India Marital Status: Married Passport Number: M 7242770 Place of Issue: Patna (ECNR) Date of Issue: 09. 03. 2015 Date of Expiry: 08. 03. 2025

Permanent Address:

Village- Bhada

Po- Sirisiyan, PS- Jamo Bazar, Distt- Siwan

Bihar, India, Pin- 841413

Carrier Objectives:

To find a challenging position to meet my competencies, skills, education and over 13.1 years of experience in the Field of Oil & Gas, L.D.P.E Or O.S.B.L and Refinery Petrochemical Project Or power Plants related with (Pressure Vassal, Heat Exchanger, Drum,Colum,Cold Box, Storage Tank, Surface Condenser, Shell, Air )etc. Equipment& packages piping.Hydro testing. Pipe Fabrication. Erection.Firefighting Steam blowing &Aqua lazing Chemical Cleaning Jobs Seeking a challenging and growth oriented carrier where I can utilize my skills and knowledge with the Opportunity for professional growth and to excel by contributing towards the achievement of organizational goals with Highest Quality Standards and to be a long lasting member of an organization where growth, prospects are unlimited And individuality is recognized by the team member's work. As a professional, to seek a challenging career in growth Development and to exploit my inherent skills and capabilities

QUALIFICATION:

B. Tech in Mechanical Engineering (2005)

Intermediate from BSEB Bihar (1999)

Key Skills : in MS Excel, MS Word & Power Point.Sap Ides etc.

INDUSTRIAL TRAININGD

Bharat Wagon Egg Ltd (BWEL), Mug in B Tech

Undergone Six weeks training on fabrication & assembly of goods wagon

Special Safety Training Courses Attend in Oil & Gas Industry

Safety Education

H2S Awareness and Education Procedure

Permit to work Training

Safety Supervisor

Fire Extinguisher

Basic Life Support

Gas Testing & Confined Spec

Breathing apparatus

Work at height

INDUSTRIAL VISIT

Special Industrial visit ESCO STEEL PLANT, BARANPUR

Skills & Strength:

Excellent Communication Skill.Prepare bill of quantity materials & manpower requirement. Deep experience.in project construction & Inspection. Having ample knowledge international codes of standard.

Familiar with ASTM, ASME, API, ANSI, TEMA, ISO, NFPA, NACE & AWS with GRP / GRE codes of standards and specification.Inspection of piping fabrication, erection and welding as well as material inspection and related all facilities.Efficient Management and Leadership abilityExpertise with latest tools and techniques

1. Company: QATAR PETROCHEMICAL COPANY (QAPCO)

Position: Piping & Static Equipment Engineer

Project: QAPCOMesaieed

Period of Services: 03/03/2021 to 18/08/2022

Location: Qatar Mesaieed

Preparation of 48 No TIE-IN, Steam line, Dry Gas Flare line, Nitrogen Gas line, Fuel Gas line, Crude Helium line, Liquefied Natural Gas line, Plant Air, Instrument Air, Utility water line, Potable water, with existing line Including materials preparation marked in the Drawing P&ID and ISO Drawing GA Drawing and submit to the Client for final approval for Engineering Department and LNG Operation Department.

And design documents in accordance with a Static Equipment (Pressure Vessels, Shell .Air Cooler. Heat Exchanger, Drum, Colum, Cold Box, and Storage Tanks) for Refineries, Petrochemicals plants, tubing, pump package Erection Maintenance Repair & Replacement, Internal Installation of Demister Mist Your, Even Flow etc.Review of the final issue of PID’s from point of view of commissioning and start-up, issuing of PID’s modification according with project standards and regulations, Responsible for providing required quality Mechanical Static / Piping engineering support and expertise through all stages of the project;

2. Company: B&W ENERGY SERVICES.

Position: Technical Advisor Piping

Period of Services: 16.02.2020 to 13.02.2021

Project: KIPiC Al Zour Refinery

Location: AL-zour Refinery

Air blowing, steam blowing, Aqua lazing, Oil flushing, chemical leaning (LP, MP, HP), system cleaning & water flushing,Reinstatement (Install orifice plate, flow element, strainer, filter, interlock installation) Leak test LP & HP tightness test of system, using with Air, N2, He.Firefighting (deluge system) flushing, service, and functional test.LP leak test of system using with Air, Service & functional test of utilities, System dries out.

Air freeing, Fuel gas line up and Lube oil flushing.Static equipment such as vessel, column, Heat exchanger, Furnace, internal cleaning & inspection, and final box up.Final PID confirmation, Pre-Commissioning check sheet & Company punch closing.

3. Company: FLOUR CORPORETION LTD.

Position: Craft Supervisor Piping

Period of Services: 16.11.2017 to 31/10/2019

Project: KNPC Clean Fuels MAB 2

Location: Ahmadi / Mina Abdullah

Lead individual gangs and can take decisions independently. And monitoringResponsible for Steam tracing line for erection & testing.Responsible for works is in accordance with project schedule and erection sequencing.Responsible for line checking Pretesting and reinstatement of Post testing for According to Project Specification.Responsible for maintaining safety in the site according to the HSE policy of the company.Coordinate with vendor, contractor, and another related department.Proficient in reading of ISO, PID, GAD, Piping layout, Instrument hook up, Vendor and equipment detail Drawing.Co-ordinates sub-contractors involved in the assembly stages ensures compliance with safety procedures and quality standards. searches for the most efficient technical solutions provides quantitative data for producing the progress Reports preparation of equipment layouts, piping GA’s and piping erection and fabrication isometrics strong Responsible for shutdown works like pre-shutdown, shutdown and post-shutdown works.

4. Company: SAIPEM (SAUDI ARABIR)

Position: Piping supervisor

Period of Services: 18.06.2016 to 11.11.2016

Project: Petro Rabigh 2

Location: Rabigh Saudi Arabia

Responsible for all Piping fabrication and Erection Hydro testing and line checking test package preparation and inspection with the Client.Responsible for works is in accordance with project schedule and erection sequencing.Supervised Piping works, Spool erection and all further activities related to piping/ supporting including test pack clearance, hydro testing, Punch items clearance pre-commissioning and assistance for commissioningInspection of piping fabrication, erection and welding as well as material inspection and related all facilities. Etc.

5. Company: MADINA GROUP WLL.

Position: Piping supervisor

Period of Services: 16.11.2015 to 29.02.2016

Project: Oryx G T L Technip

Location: Raslafan Qatar

Responsible for all piping fabrication, erection and welding as well as material inspection and related all facilities.Be responsible for all Infield pipeline laying, well-pad station piping, equipment erection, & construction work for the Mechanical job involves pre-fabrication, installation, testing and pre-commissioning of piping.Modification of piping according to revised isometric and inspectionHydro testing inspection, Punch listing erected line & clearance.Tie-in connection on fuel Gas service lineCompletion of line, do the activities of pigging. Organization / Distribution of staff and Manpower’s.

6. Company: PETRON ENGINEERING CO. Ltd.

Position: Executive Engineer Piping

Period of Services 28.06.2014 to 05.09.2015

Project: OSBL PTA

Location: Mangalore Bhajpe

Responsible for ensuring erection and welding are done as per project specifications.

Responsible for following all FDC and Site instruction also.Coordinating with planning department to analyze project data and highlight areas of concern.Prepare daily reports and various accomplishment reports.Coordinating with various contractors and Vendors for the successful completion of the project.Prepare work schedules of all related activities to ensure smooth operation of the task/project.

7. Company: DESCON ENGINEERING CO. Ltd.

Position: Piping supervisor

Period of Services: 22.01.2013 to 12 12 2013

Project: Borough -3, PO& LDPE Projects

Location: Ruwais

Coordinate with vendor, contractor, and another related department.Proficient in reading of ISO, PID, GAD, Piping layout, Instrument hook up, Vendor and equipment detail Drawing.Co-ordinates sub-contractors involved in the assembly stages ensures compliance with safety procedures and quality standards.searches for the most efficient technical solutions provides quantitative data for producing the progress Reports preparation of equipment layouts, piping GA’s and piping erection and fabrication isometrics strong Responsible for shutdown works like pre-shutdown, shutdown and post-shutdown works.Lead individual gangs and can take decisions independently. And monitoringResponsible for Steam tracing line for erection & testing.Responsible for works is in accordance with project schedule and erection sequencing.Responsible for line checking Pretesting and reinstatement of Post testing for According to Project Specification.Responsible for maintaining safety in the site according to the HSE policy of the company.

8. Company: Consolidated Contractors International Company WLL.

Position: Piping supervisor

Period of Services: 25.10.2010 to 20.10.2012

Project: Gas Field Development Project

Location: Southern Yolo ten Gas Field Development Project

Prepare technical report, lists of outstanding items on a punch list submits it for construction to carry out the required test.Monitors the hydro testing (hydro and pneumatic) and handle reports on the completion of tests and to supervise line cleaning after hydro test. Responsible for the examination of systems to ensure completeness, punch lists preparation, and readiness for hydro tests activities 5 Interfaces with equipment, &piping,. Etc.

9. Company: BONNATI SAUDI ARABIA

Position: Mechanical Piping supervisor

Project: Gas Project Jubal Abu Ali Shoiba power plant Sabyapakej2

Period of Services 13.06.2006 to 28.04.2010

Location: Jubal Saudi Arabia.

I am controlling a team having strength and Responsible for the complete piping activities in Underground and above ground area.Management and co-ordination of site resources. Test pack, punch list, material co-ordination and design related modification work request. Ensure that activities assigned are implemented within agreed time scale.To generate daily and weekly reports for progress monitoring.Coordinate with other discipline for timely completion of job. Responsible for prefabrication of Piping spools, various pipe supports at shop and erection of spools as per isometric at fields. Material controlling of all related fields. Marking of Piping spools & field joints in isometric drawings. Checking the piping isometric drawings with P&ID and GA for approving the drawings for. Construction. Co-ordinate with Quality department for NDT activities for spools clearance.Hydrostatic / pneumatic pressure testing of piping spools and system testing. Carried out hydrostatic pressure testing of high-pressure line.

GRE.GRP. RTR Exp.Certificate by Saudi Aramco Bond Strand Company Ltd. 2007 to 2009

Language Known: English, Urdu, Hindi & Arabic

Nationality: India

Driving License: Holding Indian Driving License

(11.05 Years of Gulf Experience)

Job Description:Duties & Responsibility

Experience is related to (Pressure Vessels, Heat Exchanger, Drum, Colum, Cold Box, and Storage Tanks. Surface Condenser, Shell,Pump & Turbine) etc. Erection. Installation. Assemble. Maintenance. Repair & replacement, High pressure cleaning. Internal Installation. Of all Internal Devices like,Demister Mist Your, Even Flow Filter etc... & drawings. Review and approve subcontractor and supplier documentation Revises including quality plans, inspection and test plans,Review of the final issue of PID’s from point of view of commissioning and start-up, issuing of PID’s modification according with project standards and regulations, Responsible for providing required quality Mechanical Static / Piping & Structure engineering support and expertise through all stages of the projects, Experience is related to Pipe fabrication & (Spooling) Pipe Support fabrication, erection and all further activities. related to piping/ supporting or RTR GRP GRV piping GRE Piping AG UG work and Erection of spools/piping and supports as per piping Isometric & Piping general arrangement/ Standard Prepare work schedules of all related activities to ensure smooth operation of the task/project.Lead individual gangs and can take decisions independently. And monitoring. Responsible for Steam tracing line for erection & testing.Responsible for works is in accordance with project schedule and erection sequencing.Responsible for line checking Pretesting and reinstatement of Post testing for According to Project Specification.Responsible for maintaining safety in the site according to the HSE policy of the company.Responsible for shutdown works like pre-shutdown, shutdown and post-shutdown works.Responsible for ensuring erection and welding are done as per project specifications.Responsible for following all FDC and Site instruction also.Coordinating with planning department to analyze project data and highlight areas of concern.Test activity to ensure all deficiencies are identified and punch lists are prepared. When the systems are to be tested, ensures the systems limits are identified, that necessary test.Equipment is in place and reviews completion of punch list items to ensure hydro tests may proceed.Review and approve subcontractor and supplier documentation including quality plans, inspection and test plans, Manufacturing. Welding procedures, inspections and test procedures and manufacturing records Coordinates and monitors the hydro tests and reports on the completion of hydro tests.Demonstrate a professional work ethic and actively participate as a member of the Discipline Work face Planning Team. Interfaces with the Discipline Planning Teams to understand the construction schedule.Assesses the impact of inefficiencies on the successful completion of planned activities and adjust the plan as required. The project requires asbestos abatement, waste removal, and demolition of numerous. Buildings and associated above ground piping and ancillary equipment. As identified in the contract documents and drawings, the Site is comprised of above grade buildings,Prepare daily reports and various accomplishment reports.Coordinating with various contractors and Vendors for the successful completion of the project.Standards are living documents that are consistently reviewed and updated. This ensures that they keep pace with advancements in technology, Reflect the current state of industry practice, promote public safety, and are relevant in accordance with regulatory and market needs.Activity to ensure all deficiencies are identified and Standards, API ASME ANSI & TEMAVerify and review technical Mechanical Static / Piping documents, & drawings. Review and approve subcontractor and supplier documentation Revises including quality plans, inspection and test plans,Approved standards and to meet Operations, Maintenance, AssetIntegrity and HSE requirements. Ensure scope preparation completeness review with hands on experience in operation and maintenance of rotating and non-rotating equipment, various pumps and compressors, reliability and availability of equipment, APMS (Asset Performance Management System), mechanical and piping modifications, utilities etc.Plan and coordinate between Operations, Maintenance, Asset Integrity, Process and Operational Safety, Fire Engineering and ICT teams to ensure project requirements are met and aligned and provide continuous project assurance. Identifies potential hazards during engineering activities (as applicable) such as Document Review,Design Safety Review workshop, HAZID, ENVID, HAZOP, QRA, FERA, etc., participates in technical meetings, commissioning activities, SAT, Plant pre-start up safety audits, performance tests raises punch lists and provide support to operations and maintenance teams in various stages of project activities. Coordinate with Project execution department, engineering, operations and maintenance teams during projects’ FEED and EPIC stages to align operations, maintenance, and Asset Integrity and HSE requirements. Coordinate with all relevant stakeholders to resolve technical issues, punch lists and warranty issues during pre-commissioning and commissioning stages until the projects are successfully commissioned and handed over. Support lead engineer or his supervisor and ensure that all applicable environmental, process and safety technical policies, standards are fully integrated and implemented.Provide necessary support during any incident analysis, failure investigations etc. Ensure SIMOPS. Various project interfaces so that shutdown activities are properly planned for effective execution Support development of Qatari teams.Preparation of scope and the responsibilities for pre-commissioning and commissioning activities, Pipe fabrication & (Spooling) Pipe Support fabrication, erection and all further activities, related to piping/ supporting or RTR GRP GRV piping GRE Piping AG UG work and certified from BONDSTRAND LTD. SAUDI ARAMCO 2007. To Erection of spools/piping and supports as per piping Isometric & Piping general arrangement/ Standard Specs,With our steam blowing, Equalizing, Chemical Cleaning, Removing & Reinstatement of Permanent spool For.Actand steam blow out services, we remove mill scale and construction debris from newly installed permanent steam systems,ensuring proper system functioning, extending the life of your equipment and providing you peace of mind Friendly, outgoing personality Keen to learn new skills and willing to work long hours, as required good Sense of humor able to work on own initiative Strength to achieve the assignment under pressure and resolve the provable smoothly and fully experience to work alone and evaluate finding in accordance with specification in consultation with client to interpret their requirement and adhere to their safe working procedure.Involved in the hydro testing.Reinstatement and pre commissioning activities Study of P & ID and isometric drawing Job allocation as per the work front availability.Accustomed with different permit systems to carry out the job in refineries and gas plants or also certified of P.T.W to study the Isometric drawing received from the clients and to identify the pipe lines and carry out the inspection work. Check flow direction arrows on valves; Verify that they are properly identified, and valves are installed in accordance with direction. Ensure that pipe supports, hangers and guides have been installed in accordance with the piping drawings and the pipe support details. Monitoring the QA/QC Documentation of the subcontractors and ensure that all the activities are incorporated to their system on daily basis and can be traced according to our requirements supervise and Inspection of cold and hot insulation, cladding on piping and equipment’s.Line check to verify the use of correct material fittings, valves, and supports, prior to hydro test and prepare punch list for incomplete works, check and closing after the work is done Prepare daily reports of work progress and man power utilization Prepare.Weekly basis. Is completed in accordance with prescribed information prior to pneumatic and hydro static pressure tests being carried out for all test packages.Prepare technical report, lists of outstanding items on a punch list submits it for construction to carry out the required test. Monitors the hydro testing (hydro and pneumatic) and handle reports on the completion of tests and to supervise line cleaning after hydro test.Responsible for the examination of systems to ensure completeness, punch lists preparation, andreadiness for hydro tests activities Interfaces with Equipment, piping, field engineer and other field superintendent before proceeding for hydro test,Project Manager and supervise the preparation of test activity to ensure all deficiencies are identified and punch lists are prepared.When the systems are to be tested, ensures the systems limits are identified, that necessary test equipment is in place and reviews completion of punch list items to ensure hydro tests may proceed.Review and approve subcontractor and supplier documentation including quality plans, inspection and test plans, Manufacturing / welding procedures, inspections and test procedures and manufacturing records Coordinates and monitors the hydro tests and reports on the completion of hydro tests.Demonstrate a professional work ethic and actively participate as a member of the Discipline Work face Planning Team. Interfaces with the Discipline Planning Teams to understand the construction schedule. Assesses the impact of inefficiencies on the successful completion of planned activities and adjust the plan as required. The identified in the contract documents and drawings, the Site is comprised of above grade buildings, a 315-foot smokestack, a water tower,approximately metal silos, cooling towers, numerous above ground storage tanks, and additional ancillary piping, conduit and equipment. The primary work areas and a description of work activities for each of the areas are provided in Section Proper utilization of manpower and equipment avoid idle time. Ascertains that Safety for Welding, Testing and Related Activities are being implemented monitor Fin-fan coolers assembly, erection, leveling, alignment and belt tensioning activities responsible for the assembling of all equipment in the project Inspection of all types of static equipment, Alignment & Internal in Tank erection responsible for field work monitoring and preparation of look ahead schedules for manpower and material Assistant sub-contractor on finding of fronts and solving sub-contractorSmall issues on the spot Coordinate daily meeting with the site supervisors and giving them tasks as per schedule. Check all piping jobs carried out according to code specification and client requirement to define the organization chart and necessary resources for pee-commissioning and commissioning activitiesIdentification of systems and sub-systems by marking up of PFD’s and PID’s – system definition,to assist construction departments by defining of priority systems according with overall construction and per-commissioning & commissioning planning and schedule.Participate in construct ability analyses in order to meet project schedulepreparation of operating manuals in cooperation with the Process Department, Process Licensors and Vendors,preparation of per-commissioning, commissioning and start-up execution plan; development of planning and scheduling of per-commissioning and commissioning plan for entire projects and integration with Client planning for commissioning and start-up ability to work well in team environment Supervises fabrication yard erection activities (fit up, welding and lifting) Supervises.Fabrication yard installation operations (piping installation, E.I.T.) Co-ordinates and interfaces between fabrication/installation and per-fabrication activities.Good knowledge of industry codes and standards TEMA codes (ASME/ GRE/GRP/GRVFamiliarity with relevant manufacturing processes and relevant industry codes such as ASME Sec VIII Div. 1 &2, ASME Sec I, TEMA, API 660, API 661, API 530, API 537, NFPA, NACE, ASTM, API 534 etc.)

Declaration:

I hereby declare that the information furnished above is true to the best of my knowledge

Place : ( Mohammad Ijharul Haque )



Contact this candidate