Post Job Free

Resume

Sign in

Project Manager Quality Control

Location:
Edmonton, AB, Canada
Posted:
January 02, 2024

Contact this candidate

Resume:

Srinivas Mindi

ad2dpr@r.postjobfree.com

780-***-****

Professional Highlights

• Maintenance plans using SAP, PM, Microsoft Project (MSP). Navisworks. smart construction for planning purposes on projects.

• Pipefitter with 13 years of maintenance and supervision experience in Canadian Oil Sands and various countries.

• Deadline-driven Execution Supervisor with 15+ years of expertise spanning construction management, maintenance management, turnaround planning, and team leadership.

• Proven track record working on large-scale projects spanning across the oil & gas and manufacturing sectors.

• Adept at work phase planning, material acquisition, vendor engagement, process mapping, and budget monitoring.

• Expertise in developing maintenance work packages, assessing construction work plans, overseeing project execution, and providing support to quality control and turnover phases.

• Excellent written and verbal communication skills gained through extensive Presentation and report writing.

• Strong safety mindset and highly motivated to achieve superior results with the highest safety standards.

• Most experience in erection and hydro testing and punch listing, etc. Academics

• First Level Supervisor Training

• Leadership for safety excellence,

• Supervising ground disturbance 201

• Estimating, Scheduling & Planning—ISPEC

• Steamfitter/Pipefitter-IP Red Seal

Professional Tickets:

First Aid / CPR, CSTS-09, H2S Alive, Fall Protection, EWP, Confined Space Entry & Monitor, OSSA–BSO, eGSO, Respiratory Fit Test, Gas Monitoring, OSSA–Safe Work Permit, Forklift & Zoom Boom Training, Rigging ticket, SOS tickets, TDG ticket. PROJECT PLANNER,

Fluor Constructors Canada Ltd. LNG PLANT, KITIMAT, BC. 11/2022 – PRESENT.

• Assist the Project Manager in the overall planning to ensure that the Project is constructed in a timely and cost-effective manner.

• Responsible to the development of Construction Work Packages (CWP), Field Installation Work Packages (FIWP), Hydro Test Packages, Pre-Commissioning and Commissioning Work Packages

• Monitor and update daily progress, verify cost codes on timesheets and generate Productivity Factor

(PF) Report and submit to the Project Manager

• Develop CWP Scope of Work (SOW) by walking down the area and identify the remaining site work for every discipline.

• Review and assign Engineering Documents, Vendor Documents, Standard and Specification Documents to work packages.

• Responsible for updating and revising work packages.

• Facilitate coordination with client, client engineers, subcontractors, change management, workface planning, scheduling, material deliveries/construction activities.

• Involvement in all project coordination and management activities and meetings.

• Assist and mentor other Planners in the Team

• Assist in completing turnover packages.

• Utilizes Smart Plant Review, My Content, ShareFile, Project Wise, Bluebeam, Adobe Software in developing work packages.

• Perform other administrative duties as required. T/A AND MAINTENANCE WORKFORCE PLANNER Quinn const., at Nova Chemical Joffrey, ab. 06/2021 – 02/2022

• Escalates risk related to strategy work orders that have been delayed for execution for a significant period.

• Provides the Supply Warehouse & Inventory Sub-function with relevant information related to changes to annual material quantity requirements based on the forward workload material requirements.

• Schedules work based on the prioritization of the task as determined by the Maintenance Execution sub-function in compliance with the 1SAP Work Management processes and reschedules work based on the associated risk, and feedback from the Execution subfunction.

• Builds and communicates accurate weekly work schedules reflecting all work management activities.

• Confirms agreement by the relevant stakeholders through signoff of the weekly work schedule.

• Identifies and creates corrective/non-strategy task lists for reoccurring work to support efficient and effective planning and safe work execution.

• Prepares fully specified job plan packages including job work scope, special tools required, special instructions required such as piping specifications, quality assurance plans, torquing requirements, and disassembly/assembly of equipment.

• Be proficient in the use of our company-supported Computer systems, such as SAP work order and parts ordering system.

Piping foreman / Nightshift Supervisor

GISBORNE, at Gold Mines at Bruce jack, BC. Oct 2020-April 2021

• Foreman up to 10 crews fabricating and installing small bore for Instrument air and water lines. As-built as per site conditions and make a red line drawing for those systems.

• Demo the old spools; install new big-bore lines from systems to systems.

• Hoisting and rigging the big-bore spools.

• Pump strains, high torque, and manual torque.

• Performed maintenance, uncovered defects,

• made amendments to increase productivity Proved my ability to take extra responsibility and complete tasks on time Hydro testing, pneumatic test for airlines. Piping foreman

TRADESMAN ENTERPRISE, at AWTF-S site with TECK/FLUOR at elk ford, BC. April 2020 to Sept 2020.

Assumed Foreman position and oversaw the installation, testing, and commissioning of a piping system that included pipe spools, valves, filters, PSVs, and alignment of pump spools. • Mitigated costs, enhanced efficiency and met target deadlines —assessed construction work packages, administered pre-engineered heavy and critical lifts of pipes & materials, and influenced RFIs and change management requests.

• Orchestrated daily work plans, distributed materials, coordinated resources, and steered modification of piping systems to meet quality standards.

• Managed hydro-testing and pneumatic testing processes and steered client walk down and submission of turnover documents.

Piping supervisor

GISBORNE, at ELKVIEW OPERATIONS Sparwood, BC. Jan 2020-April 2020

• Foreman up to 10 crews fabricating and installing small bore for Instrument airlines and water lines. As-built as per site conditions and make a red line drawing for those systems.

• Demo the old spools; install new big-bore lines from systems to systems.

• Hoisting and rigging the big-bore spools.

• Pump strains, high torque, and manual torque.

• Performed maintenance, uncovered defects,

• made amendments to increase productivity Proved my ability to take extra responsibility and complete tasks on time Hydro testing, pneumatic test for airlines.

.

Maintenance foreman/ supervisor -- AECOM, Kearl Lake Oil Sands, Fort McMurray Sep 2016 Oct 2019

• Foreman up to 10 crews installing, Stage, rig, fit-up for the weld.

• Removed and replaced spools in OPP, pumps, and vessels. • Pump strains, high torque, and manual torque.

• Performed maintenance, uncovered defects,

• Made amendments to increase productivity proved my ability to take extra responsibility and complete tasks on time Hydro testing, pneumatic tests for airlines. CNRL Horizon & Albian Sands—Maintenance & Shutdowns, Duration: 1-Year Scope: Tasked with overseeing plant-wide maintenance programs spanning across 7-business units.

• Reduced operational downtime and catapulted productivity—presided over preventive, corrective, and emergency maintenance programs for the repair, replacement, and reinstatement of piping systems, flanges, PSVs, structural support, valves, and filters.

• Orchestrated maintenance work packages that included execution procedures, blueprints, P&IDs, material requirements, and torque specifications.

• Supported with large-scale plant turnarounds—partnered with the turnaround management team to support the execution of maintenance repair requests across multi-business units.

• Assessed work package requirements, coordinated tasks, and confirmed lock-out and Tagout procedures.

• Led rigging and hoisting processes, administered piping system installation, testing, and commissioning.

Suncor Fort Hills—Large-scale Construction, Duration: 1–Year Scope: Assumed Foreman position and oversaw the installation, testing, and commissioning of a piping system that included pipe spools, valves, filters, PSVs, and alignment of pump spools. • Mitigated costs, enhanced efficiency, and met target deadlines —assessed construction work packages, administered pre-engineered heavy and critical lifts of pipes & materials, and influenced RFIs and change management requests.

• Orchestrated daily work plans, distributed materials, coordinated resources, and steered modification of piping systems to meet quality standards.

• Managed hydro-testing and pneumatic testing processes and steered client walk down and submission of turnover documents.

SHELL SCOTFORD–TESTING MANAGEMENT, DURATION: 14-MONTHS Scope: Spearheaded QA/QC processes for the reinstatement of piping systems at the Shell Scotford site.

• Ensured compliance with ASME and ABSA quality standards—liaised with the quality management team to oversee the meeting of quality standards and client specifications.

• Led site walk-downs, administered 3rd party vendors, administered deficiency list items procedures, and oversaw the execution of corrective actions. • Manage hydro and pneumatic testing processes and oversee QA documents’ compilation. Supervisor Maintenance-Pipefitting 10 Months. Ledcor, Fort McMurray.

• Established and defined key measures & targets to achieve desired business outcomes, driving the commitment to improved asset utilization via improved equipment reliability and effective operations personnel.

• Identified areas of opportunity and developed and initiated strategic projects to address areas of – reliability, process improvement, safety, and quality.

• Preserved the condition of the plant by monitoring due operational care and provided priorities and access to shift maintenance personnel.

• Developed the skills and capability of the members of the shift team.

• Promoted a department culture that allows members to feel engaged and included and strived for high performance.

• Troubleshoot the root cause of failure and suggested best engineering practices to avoid it in the future. • Accurately maintained confined space documentation and presented to safety officer for audit • Performed the Field level hazard assessment with the team lead and contributed positively to doing a job with superior results and proactive safety precautions. Comply with a permit to work and an isolation system.

ABOARD: -

NAVAL SBC – VISAKHAPATNAM, INDIA

PIPING SUPERVISOR / NITE SHIFT INCHARGE – 2005 – 2007. NATIONAL PERTROLEUM CONSTRUCTION- ABU DHABI

PIPING FOREMAN 1998 TO 2005.

ASRY SHIPYARD- BHARAIN,

PIPE FITTER – 1995 – 1997.



Contact this candidate