Post Job Free

Resume

Sign in

Electrical Engineering Machine Operator

Location:
Castro, Lecce, 73030, Italy
Salary:
as much as you can even under bonus condition
Posted:
January 02, 2024

Contact this candidate

Resume:

CURRICULUM VITAE OF

NAME Renzo

SURNAME Galvagni DATE OF BIRTH 13 May 1945

PLACE OF BIRTH Fortezza/ Franzensfesten Sudtirol Italy ADDRESS Via M.Manieri 11 zip73100 Lecce Italy

Mail addresses ad2d3x@r.postjobfree.com OR galvagnirenzo@gmai

Telephon numbers and country code +39-351******* OR+39-347******* WATSAPP +393*********

EDUCATION Highschool for electrical engineering

Place Trento Italy

period 1960 to1965

score 70/100 study of electrical windings for AC and DC motors and generators, electrical installation design, lathe machine operation, brazing,oxiactylne welding

training 1 revolver lathe machine operator at SCHATT GMBH factory producing water valves size up to 3’’brass or bronze made

place Nuremberg Germany

period summer 1963 3months

training 2 Kugel Muller rolling bearing manufacturer in hardening department section

place Nuremberg Germany

period summer 1964 2.5 months

University

University of Padova

period November 1965 to February 1972

score 99/110 bachelor in electrical engineering

industrial engineering chartered march 1972

instrument controls training Kent Tieghi ABB 1976 for

3 weeks process tubing connection. Control valves sizing

FOXBORO 1976 for 3 weeks controller calibration

Army duty June 1973August 1974 alpine ranger corp. as assault gun machine MG operator senior corporal

WORK EXCURSUS ESPERIENCE

September 1974 October 1975 at Klockner Moeller actually EATON contactors, main breakers, thermal relays, total insulation boards manufacturer

Bonn Germany as technical clerk in international technical office responsible of products compliance with national standards for Italy and Swiss taking care of boards quotation and design for tenders

January 1975 November1977 construction supervisor for erection of new factory for high purity silicon ingots poly and monocrystal for electronic components, rectifiers, thrusters, electronic chips in Merano Italy now owned by MEMC Monsanto

Process with clorosylane distillation,hydrogen production from water electrolyze reactors for above products thrusters controlled via temperature control signal

november1977 December1979 Technical Manager in the Switchgear factory of Stezzano Bergamo Italy (in charged of production of first Magrini Galileo400kV SF6 bus duct for GIS

as technical manager in Stezzano factory where Mcc, and medium voltage switchgear and bus ducts were manufactured, the production process was done with steelplastes cutting, bending punching, I was taking care of tools maintenance, and manufacturing as well organization of new production lines as SF6 aluminum bus ducts for SF6 GIS

Process for aluminum alloy sheets thickness 7 mm

Cutting with stamp transfer, rolling,bewelling,MIG welding X raying, repairing, hydro testing, brushing, transferring to assembly factory

Times for all operations was checked and controlled and recorded to define production cycles

Maintenance was granted for major equipment as

Wiedemann automatic punching machine

Copper bar plastification, silver plating for copper and tin plating for aluminium was done as well all panels, Mcc and switchgear painting, water effluent treatment was also done, high frequency 72V and compressed air distribution was availablefor hand tools manufacturing cost- control times was my section duty

January1979 June 1979 technical clerk at Sotret Milano taking care of construction supervision, commissioning and design in electro instrument section, project

CO2 fermentation recovery plant in the Peroni Brewery of Napoli recovery, compression and liquefaction of CO2 for food uses with related standards

Other project for heat recovery- freezing compressors was operated with thermal engines and exhaust heat recovery for heating process at food factories, Herl safety valves testing at Aachen TUV with Italian ANCC inspectors in order to get valves qualification for Italian market

December 1979 September1982 in Kenchela Algeria as supervisor promoted to construction manager with Petrochemical International instrument Construction company (Milano) electrical .instrument and mechanical workslike UG piping for FF system6’’-trench piping for chloride acid 2’’, compressed air 3’’,water tank erection 2000 cm, substation erection 30/6kV

30/6 kV Transformer 4 kA,6kV incoming board, UG cabling,earthing grid construction and commissioning with

Current injection Main contractor Snamprogetti,client Sonitex, I was due to care of Algerian employment rules for local personnel and site purchase for construction material as well temporary importation duties for construction equipment

1979December-1982August P.I.I.Co. Milan Italy

Deputy and Construction Manager

Kenchela ALGERIA for SNAMPROGETTI/SONITEX all utilities for a

Textile factory (1500 employees) (mech. electrical inst.erection)

1982May-September construction manager in Albi Italy client E.N.E.L. hydropower plant (construction only) 25 MW 130 kV substation connection to OHTL line in mountain region

1982 October 1983 August Stah and Mereksen ALGERIA desert region of Amenas for FLUOR TEXAS/SONATRACH E/I works for 2 gas re-injection stations consortium with Bentini and Peirany erection of conduit ADPE,tubing for all instrumentation erection works



Contact this candidate