*. Name:
Gutema Kebede Dufera
*. Position:
Surveyor
3. Name of Firm:
Classic Consulting Engineers
4. Date of Birth:
**** *********** : Ethiopian
5. Martial Status
Married
6. Address
- Telephone: +251**-***-****/091-***-**-** /09 2338 6532
7. Education:
-Advanced Diploma in Surveying from Nekemte Technical College, 2004.
-Fourth years Civil Engineering Student (Wollega University)
8. Membership of
Professional.Associations :
-Yes
9. Other Training:
Civil instrument Global Positioning System (GPS), Total Station (Data Recorder), Total Station with E.D.M and Digital leveling instrument.
Computer Skill:
-AutoCAD, Eagle point Road Design Software,
-Microsoft Office family.
10. Countries of
Work Experience Ethiopia
11. Language Ability:
Speaking Reading Writing
Amharic
Excellent Excellent Excellent
English Good Excellent Excellent
Oromic
Excellent Excellent Excellent
12. Employment Record:
June 02, 2019 – to date
Feb.07, 2012 – Oct.30, 2017
Senior Surveyor
Classic Consulting Engineers
Arjo Gudetu – Jirma – Soge Road Project
Senior Surveyor
YHUN Construction Plc
Herero – Aluma, Dodola – Wabe Burkitu, Dodola – Terura School Road Project.
June 26. 2009 – Dec. 5, 2011
July.2007. – April 15, 2009
Senior Surveyor
Yerer Engineering. Ltd
May tsebry - Dima Road Upgrading Project.
Chief Surveyor
Sinohydro Corporation
Assosa – Sherkole – Guba Road Project
Contract -1 Sherkole – Blue Niel (RR 50)
May.2006 - July 2007
Senior Surveyor
Beruh Consulting Engineering & Hydro geologist Plc.
(Alamata – Semera Road Design & Amibara Irrigation )
October 04 / 2004 – September 01/ 2006
Surveyor
Sinohydro Corporation
Nekemte - Meke Nadjo Upgrading Project
(Asphalt Concrete Road)
13. Detailed Tasks Assigned:
Works Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:
1. Project name May tsebry - Dima Road Upgrading Project.
Yerer Engineering. Ltd
.
Year: June 26. 2009 - Dec. 5, 2011
Location: Ethiopia
Client: Ethiopian Roads Authority
Main project features:
The project is 75.6 km length. The service is inclusive of establishment of control points for upgrading of existing gravel-surfaced road to asphalt
Positions held: Surveyor
Activities performed:
-Supervising and controlling surveying activates.
-Checking working drawings by using AutoCAD(Eagle point
-Data editing and processing
-Jointly working and following surveying activates with approved data by the engineer
Project name : Assosa – Sherkole – Guba Road Project
Contract -1 Sherkole – Blue Niel (gravel-surfaced road )
1.
Year: July.2007. – April 15, 2009
Location: Ethiopia
Client: Ethiopian Roads Authority
Main project features:
The project is 75 km length. New Alignment Design road
Positions held: Chief Surveyor
Activities performed:
Lead and coordinated the surveying crew.
-Established control points with GPS.
-Carried out cross section survey in order to establish DTM for designing new road.
-Identification and location of all beacons and benchmarks.
-Day to day checking of levels of pavement layers and structures .embankments, cut sections
Staked out slopes stakes for construction of sub grade, pavements such as sub base, crushed aggregate base, Asphalt courses in accordance with the approved construction cross section drawings.
Staked out centerline, lay out curves, major and minor drainage structures using Total Station according to the approved working drawings by the Engineer
-Completed data processing in AutoCAD and prepared for design
-Project name : Alamata – Semera Road Design
Year: May.2006 - July 2007
Location: Ethiopia
Client: Ethiopian Roads Authority
Main project features:
The project is 210 km length. New Alignment Design
Positions held: Senior Surveyor
Activities performed:
Lead and coordinated the surveying crew.
-Surveyed all the Topographic fetchers using Total Station surveying instrument.
-Established control points with GPS.
-Carried out cross section survey in order to establish DTM for designing new road.
-Identification and location of all beacons and benchmarks.
Completed data processing in AutoCAD and prepared for design
Project name : Nekemte - Meke Nadjo Upgrading Project
Year: October 04 / 2004 – September 01/ 2006
Location: Ethiopia
Client: Ethiopian Roads Authority
Main project features:
The service is inclusive of redesign& establishment of control points for upgrading of existing gravel-surfaced road.
Positions held: Surveyor
Activities performed:
-Identification and location of all beacons and benchmarks.
-Checking and verification of the setting out of the works by the Contractor.
-Day to day checking of levels of pavement layers and structures.
-Carrying out all necessary surveys for the calculation of the quantities of the completed works.
-Located, checked and staked out horizontal and vertical alignments.
-Checked grades, levels, road alignments (horizontal and vertical) in accordance with the approved plan profiles, construction cross section and shop drawings and reported all results against the specifications to the Assistant Resident Engineer with recommendations of approval/rejection/required action.
-Checking drawings, drawings of existing minor and major drainage structures, cross section templates and working drawings using Auto CAD.
Carried out topographic surveying for head works, irrigable lands, reservoirs and canals.
Prepared plans with appropriate standard scales and computed volume of earthwork.
Lay out head works including diversion weirs or dams (concrete masonry), canals, drop structures for construction purpose.
13. Certification:-
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes my self, my qualifications, and my experience. I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.
Date: