Post Job Free

Resume

Sign in

Development Project Power Plant

Location:
Quezon City, Philippines
Salary:
35000
Posted:
December 29, 2023

Contact this candidate

Resume:

NELSON C.FABON

Residential Address:

DUCALANG ST.POBLACION

KANANGA LEYTE,PHILIPPINES

Mobile No.+639*********

e-mail:ad2axj@r.postjobfree.com

POSITION DESIRED

PIPING FOREMAN

HIGHLIGHTS OF QUALIFICATION:

Twenty two (22) years experience in piping job. Cross country piping in Geothermal Power Plant, Petrochemical Plant, Smelting and Refining Plant, Steel Plant and also in oil refineries of Saudi Aram co. I work in Pearl GTL Gas To Liquid Project in RasLaffan Industrial City, Qatar by Kelog Brown and Root (KBR) Joint Venture of Japan Gas Company (JGC).I assigned in Kuwait for shutdown job at Shuaiba Refinery at Kuwait National Petroleum Company (KNPC) from February 23,2011 to May 4,2011. I work in 4th NGL Train Project owned by Gasco Joint venture of Petrofac and GS Engineering

& Construction up to May 6,2013.

I work in Petron Bataan Refinery RMP-2 Project atLamao, Limay Bataan from Sept.14 2013 up to August 25 2014.

I work in Hamriyah Free zone as a Site Supervisor at Dana Gas, Zora Gas Field Development Project up to August 9,2015.

I work in Satah Al Rasboot (SARB) Field Development Project-Package 4 EPC Work Zirku Island Abu Dhabi UAE. from July 17, 2016 up to July 21, 2018 For my previous experience, I work in Atlantic gulf and pacific company of manila inc.(AG&P) from July 15,2022 up to present in solid KILN 4 new cement line expansion project as Piping Foreman.

UP CLOSE

Date of Birth : November 15, 1971

Place of Birth : Calubian Leyte, Philippines

Age : 51 years old

Nationality : Filipino

Civil Status : Married

Dependent : 4

Height : 5'9"

Weight : 98 kg.

EDUCATIONAL ATTAINMENT

Degree/ Diploma School/ Country Period (from-to)

Bachelor of Secondary Education LSC Tacloban, City 1989-1993 Secondary School CNVS Calubian, Leyte 1984-1988

Elementary School CSCS Calubian, Leyte 1978-1984

WORKING EXPERIENCE

PIPING FOREMAN FROM JULY 15,2022 UP TO PRESENT

ATLANTIC GULF&PACIFIC COMPANY OF MANILA INC.

SOLID KILN 4 NEW CEMENT LINE EXPANPANSION PROJECT

TAGBAK SAN JOSE ANTIPOLO CITY

JOB SUMMARY

I assigned in fabrication of spools and pipe supports. and erection of spools and installation at the pipe rack and cable gallery to pump room. I work under the direct supervision of my immediate superior. I am responsible for planning, organizing and controlling the operation of my designated area to meet the productivity, quality and safety target.

JOB DUTIES

1.)Plan, organize and direct the activities of my team. 2.)Prepare a detailed 2-weeks look ahead schedule. 3.)Determine the manpower,equipment and tools,materials,and drawings needed to meet the 2-weeks schedule.

4.)Prioritize, allocate, monitor and expedite equipment, tools and manpower needed in my area and ensure availabilty of same at the point of use on time. 5.)Strictly enforce company rules & regulations, quality and safety policies. PIPING SUPERVISOR FROM FEB. 16,2019 UP TO JANUARY 20, 2021 PLUS CONSTRUCTION INDUSTRIES CORP.

FIRE PROTECTION PROJECT SM FOUR E-COM

BLOCK 22 BAYSHORE AVE. MOA COMPLEX PASAY CITY. PHILIPPINES JOB SUMMARY

I assigned in installation of main line to supply to feed main in every tower East, West and South tower, and installation of feed main to cross main and cross main to branch line. Installation of fire hose cabinet and conduct Hydro testing. Works under the direct supervision of my Project In-Charge. Responsible for planning organizing and controlling the operation of my area to meet the productivity quality and safety target. PIPING SUPERVISOR FROM JULY 17,2016 UP TO JULY 21, 2018 DAEAH ENGINEERING AND CONSTRUCTION.

SARB FIELD DEVELOPMENT PROJECT-PACKAGE 4 EPC WORK

ZIRKU ISLAND, ABU DHABI UAE

JOB SUMMARY

I assigned at fabrication, erection and installation of underground piping GRE / GRV. Works under the direct supervision of my immediate superior. Responsible for planning, organizing and controlling the operations of my unit to meet the productivity, quality and safety targets.

JOB DUTIES

1.)Plan,organize and direct the activities of my unit. 2.)Prepare a detailed 2-weeks look ahead schedule. 3.)Determine the manpower,equipment and tools,materials,and drawings needed to meet the 2-weeks schedule.

4.)Prioritize, allocate, monitor and expedite equipment, tools and manpower needed by his unit and ensure availabilty of same at the point of use on time. 5.)Evaluate productivity and work progress and take preventive and or corrective action.

6.)Coordinate with other groups on matters needed to ensure smooth interfacing of activities.

7.)Review and approve Daily Accomplishment Report submitted by GFM. 8.)Prepare project completion rating of his General Foreman. 9.)Strictly enforce company rules and regulations,quality and safety policies. SITE SUPERVISOR FROM SEPTEMBER 1,2014 UP TO AUGUST 9, 2015 EXTERRAN BELLELI ENERGY.

ZORA GAS FIELD DEVELOPMENT PROJECT

HAMRIYAH FREE ZONE,SHARJAH UAE

JOB SUMMARY

I assigned in installation and erection of pipe racks, vessels and fabrication of spools, and installation. Works under the direct supervision of my immediate superior. Responsible for planning, organizing and controlling the operations of my unit to meet the productivity, quality and safety targets. JOB DUTIES

1.)Plan,organize and direct the activities of my unit. 2.)Prepare a detailed 2-weeks look ahead schedule. 3.)Determine the manpower,equipment and tools,materials,and drawings needed to meet the 2-weeks schedule.

4.)Prioritize, allocate, monitor and expedite equipment, tools and manpower needed by his unit and ensure availabilty of same at the point of use on time. 5.)Evaluate productivity and work progress and take preventive and or corrective action.

6.)Coordinate with other groups on matters needed to ensure smooth interfacing of activities.

7.)Review and approve Daily Accomplishment Report submitted by GFM. 8.)Prepare project completion rating of his General Foreman. 9.)Strictly enforce company rules and regulations,quality and safety policies. PIPING SUPERVISOR FROM SEPTEMBER 14,2013 UP TO AUGUST 25,2014 YUHAN TECH PHILIPPINES INC.

PETRON BATAAN REFINERY RMP-2 PROJECT

LAMAO,LIMAY BATAAN

JOB SUMMARY

I assigned at fabrication shop for fabrication of spools. Works under the direct supervision of my immediate superior. Responsible for planning, organizing and controlling the operations of my unit to meet the productivity, quality and safety targets.

JOB DUTIES

1.)Plan,organize and direct the activities of my unit. 2.)Prepare a detailed 2-weeks look ahead schedule. 3.)Determine the manpower,equipment and tools,materials,and drawings needed to meet the 2-weeks schedule.

4.)Prioritize, allocate, monitor and expedite equipment, tools and manpower needed by his unit and ensure availabilty of same at the point of use on time. 5.)Evaluate productivity and work progress and take preventive and or corrective action.

6.)Coordinate with other groups on matters needed to ensure smooth interfacing of activities.

7.)Review and approve Daily Accomplishment Report submitted by GFM. 8.)Prepare project completion rating of his General Foreman. 9.)Strictly enforce company rules and regulations,quality and safety policies. 10.)Train subordinates.

PIPING SUPERVISOR FROM SEPTEMBER 29,2011 UP TO MAY 6,2013 SUNGCHANG ENGINEERING and CONSTRUCTION CO.LTD

GASCO RUWAIS 4TH NGL TRAIN PROJECT

RUWAIS,ABU DHABI

JOB SUMMARY

I assigned at fabrication erection and installations of spools and I assigned in QA/QC Department. Works under the direct supervision of my immediate superior. Responsible for planning, organizing and controlling the operations of my unit to meet the productivity, quality and safety targets. JOB DUTIES

1.)Plan,organize and direct the activities of my unit. 2.)Prepare a detailed 2-weeks look ahead schedule. 3.)Determine the manpower,equipment and tools,materials,and drawings needed to meet the 2-weeks schedule.

4.)Prioritize, allocate, monitor and expedite equipment, tools and manpower needed by his unit and ensure availabilty of same at the point of use on time. 5.)Evaluate productivity and work progress and take preventive and or corrective action.

6.)Coordinate with other groups on matters needed to ensure smooth interfacing of activities.

7.)Review and approve Daily Accomplishment Report submitted by GFM. 8.)Prepare project completion rating of his General Foreman. 9.)Strictly enforce company rules and regulations,quality and safety policies. 10.)Train subordinates.

Assigned in QA/QC Department as PIPING and WELDING INSPECTOR

● Fit-up visual inspection of pipe joints

● Weld visual inspection of pipe joints

● Witnessing of Liquid Penetrant Testing and Magnetic Particle Testing

● Witnessing for Hardness Testing

● Prepare documents of TEST PACKAGE in preparation for HYDRO TEST.

● Witnessing of Hydrostatic Testing.

● Witnessing of final bolt torquing.

● Witnessing of Reinstatement

PIPING FOREMAN JUNE 8, 2008 UP TO FEB.23,2011

CONSOLIDATED CONTRACTORS INT’L. COMPANY

PEARL GAS TO LIQUID PROJECT

RAS LAFFAN INDUSTRIAL CITY, QATAR

PIPING FOREMAN FEB.23,2011 UP TO MAY 04,2011 CONSOLIDATED CONTRACTORS COMPANY(KUWAIT)

SHUAIBA REFINERY

KUWAIT NATIONAL PETROLIUM COMPANY (KNPC)

JOB SUMMARY

I assigned at fabrication erection and installations of spools and I assigned in shutdown works in Kuwait. Works under the direct supervision of my immediate superior. Responsible for planning, organizing and controlling the operations of my unit to meet the productivity, quality and safety targets. JOB DUTIES

1.)Plan,organize and direct the activities of my unit. 2.)Prepare a detailed 2-weeks look ahead schedule. 3.)Determine the manpower,equipment and tools,materials,and drawings needed to meet the 2-weeks schedule.

4.)Prioritize, allocate, monitor and expedite equipment, tools and manpower needed by his unit and ensure availabilty of same at the point of use on time. 5.)Evaluate productivity and work progress and take preventive and or corrective action.

6.)Coordinate with other groups on matters needed to ensure smooth interfacing of activities.

7.)Review and approve Daily Accomplishment Report submitted by GFM. 8.)Prepare project completion rating of his General Foreman. 9.)Strictly enforce company rules and regulations,quality and safety policies. 10.)Train subordinates

PIPING FOREMAN SEPTEMBER 2003 UP TO FEBRUARY 2008

M.S.AL-SUWAIDI INDUSTRIAL SERVICES CO.LTD

JUBAIL INDUSTRIAL CITY K.S.A

FROM SEPT.2003 TO FEB.2008, I WORKED AS A PIPING FOREMAN IN ANY VARIOUS PROJECT OF AL-SUWAIDI COMPANY SUCH AS:

SUMITOMO CHEMICAL ENG’G CO. LTD(SCEC) NOV.2007 UP TO FEB.2008 RABIGH REFINING AND PETROCHEMICAL COMPANY

RABIGH K.S.A.

SAUDI ARABIAN OIL COMPANY OCT.2006 UP TO NOV.2007

SAUDI ARAMCO,JEDDAH REFINERY

JEDDAH KINGDOM OF SAUDI ARABIA

DIESEL HYDRO THREATER PROJECT JAN.2005 UP TO JULY 2006 SAUDI ARAMCO,YANBU REFINERY

YANBU AL-SINAIYAH K.S.A

SAMSUNG,PETROKEMYA No.3 BUTENE-1 PROJECT MARCH 2004 TO NOV 2004 JUBAIL INDUSTRIAL CITY K.S.A

SAUDI IRON STEEL COMPANY (HADDED) SEPT.2003 UP TO FEB.2004 SABIC SAUDI IRON &STEEL COMPANY

JUBAIL INDUSTRIAL CITY K.S.A

JOB SUMMARY:

Works under the direct supervision of my general foreman or supervisor. Responsible for execution, & control of the work activities of my assigned work area to attain target productivity, quality and safety. JOB DUTIES:

1.Implement plans & schedules as directed by immediate superior. 2.Provide his men with productivity & quality targets. 3.Provide specific work instruction & guidelines needed to carry out work assignment & meet targets.

4.Push & motivate his men to attain schedules & productivity targets. 5.Monitor & report daily work accomplishment & corresponding man-hour & equipment-hour utilized.

6.Evaluate work progress & take action to correct unfavorable deviation. 7.Explain &enforce company rules & regulations, quality & safety requirements. 8.Prepare project completion rating of men under him. 9.Train subordinates on the correct methods of doing their works. PIPING LEADMAN OCT.07,2002 UP TO JUNE 08,2003

TRIPLE J. CONTRACTOR

PHILIPPINE NATIONAL OIL COMPANY PROJECT

TONGONAN, KANANGA LEYTE PHILS.

DUTIES AND RESPONSIBILITIES

* Spool pre-fabrication at the area near in the working site at WELL PAD 312 SSA. Fabrication of Swift bend, flange to elbow that connect from wellhead to main pipeline.

* Fabrication of pipe support on shear keys, cross girder, pipe shoes, PSSP & PSGP type. Fabrication of Counter Weight Support stiffeners, base plate, flange plate & eye lug. Fabrication of CHRISTMAS TREE support including collar.

* Spool pre-fabrication of pipe to flange, pipe to elbow & pipe double ending and also lateral type.

ERECTION WORKS:

* Erection of fabricated spools & swiftbends from laydown area to WELLPAD 312 SSA to their final position & elevation.

*Erection of fabricated spools of 20”Ǿ & 10”Ǿ stainless steel pipeline at upper MAHIAO DISPOSAL SYSTEM to their final position & elevation.

* Erection of fitted spools of 24”Ǿ Re-Injection line cross country piping to the final position & elevation.

FINAL FIT-UP AND INSTALLATION:

* Final fit-up & installation of steam pipeline from WELL PAD 312 SSA to TP-30 G1-300-21 main pipeline.

* Installation of pipe supports such as shearkeys, cross girder, pipe shoes PSSP, PSGP types.Installation of Counter Weight Support base to the designated location.And also installation of Christmas Tree support to the wellhead.

* Final fit-up & installation of 20ӯ and 10ӯ stainless pipeline at upper Mahiao Condensate Disposal System. Joints fitted are trimmed elbow to pipe, pipe to flange, and pipe double ending. Drain pot is also included in the pipeline.

* Replacement and final fit-up of 24ӯ Re-injection line Cross Country piping from joint 1 to joint 58 of South Sambaloran R.I. line. Joints fitted are pipe double ending, elbow to pipe, pipe to flange and reducer to pipe.(LPD) is also installed in the pipeline.

PUNCHLISTING WORKS:

Final inspection at WELLPAD 312 SSA and replacement of all temporary bolts, nuts & gasket and the correct orientation of the handwheels and also the correct pipe support installed such as:pipe shoes, counter weight support christmas tree support as per drawing specification.Hydro testing or flushing is also needed before final acceptance.

PIPING LEADMAN MAY 05,2002 UP TO SEPT. 30, 2002

MERALCO INDUSTRIAL ENGINEERING SERVICES CORP.

PASAR TURN AROUND PROJECT

LEYTE INDUSTRIAL DEVELOPMENT ESTATE

ISABEL, LEYTE PHILIPPINES

DUTIES AND RESPONSIBILITIES:

FABRICATION WORKS:

Fabrication of blind flanges 60”Ø, 42”Ø and 30” diameter to be used in air leak testing.Fabrication of sulfuric acid pipeline, pipe to pipe double ending and pipe to elbow 42”Ø and 30”Ø.

DIMOLITION WORKS:

Cutting and removed top cover of HEAT EXCHANGER VESSEL at HE-J #61, 63, and 81.Cutting and removed welded man hole of the vessels.Cutting all damage pipe supports at Acid Plant package 3 and replace.Cutting out of window opening of the vessels, for man hole or passage purposes.

Backlash and worn-out all damage tubing inside HEAT EXCHANGER VESSELS 58, 61, and 81.

ERECTION WORKS:

Erection of 1 "Ø pipes to be replace of all damage pipes inside the heat exchanger vessel and retubing. Erection of top cover of the vessel and return to the normal position.And also erection of fabricated plate for replacement of the cutted window opening.

FINAL FIT-UP AND INSTALLATION:

Install and retubing of 1 "Ø pipes inside heat exchanger vessel. Declogging of all clogged-up tubing of the vessel. Final fit-up of the cover and fabricated plate of the window opening of the vessel and full welding. Install temporary blinds for air leak testing purpose. Removed all temporary blind after air leak testing and fit-up install the final blind flange.

PIPE FITTER 'A' SEPT. 25,1999 UP TO SEPT.24,2000

DAELIM SAUDI ARABIA CO.LTD

ARABIAN PETROCHEMICAL COMPANY

OLEFINS III PLANT

JUBAIL INDUSTRIAL CITY K.S.A

DUTIES AND RESPONSIBILITIES:

FABRICATION WORKS:

* Spool pre-fabrication at fabshop area and checking of materials base on bill of materials as per drawing specification .All materials and fittings needed in the drawing such as pipes, elbows, flanges, sockolets, weldolets will be withdraw.We assemble and fit-up that base on the isometric drawing.

* Spool pre-fabrication of hot blow down, low pressure steam,process condensate, quench water, dilution steam pipelines, joints fitted are:elbow to pipe, flange to pipe, pipe to pipe double ending including sockolets and weldolets.Pipe diameters are:24ӯ, 20ӯ, 14ӯ, 8ӯ, 6ӯ, and4ӯ standard in schedule.

HANDLING WORKS:

Hauling of fabricated spools from fabrication shop to field area at OLEFINS III piperack and segregation base to the nearest column and orientation. ERECTION WORKS:

Erection of fabricated spools at piperack that base on their elevation and orientation.Spools erected are:Quench Water pipeline, Low Pressure Steam Condensate, Hot Blow Down, Dilution Steam, Cooling Water Supply, Medium Pressure Steam Condensate, Process Condensate, & Low Pressure Steam.Diameter of pipelines are:20”Ø, 18”Ø, 14”Ø, 8”Ø, 6”Ø, 4”Ø, 2”Ø,and 1 Ø. FINAL FIT-UP AND INSTALLATION:

Final fit-up and installation to their designated pipeline position from ground level to above level elevation and orientation, including pipes support, pipe to pipe joints, pipe to fittings, fittings to fittings. Fabricated spool to nozzle of the vessel, bolting is also included in flange to flange joints, and also installation of gasket. Cutting, grinding, beveling, treaming of excess measurement of fabricated spools and random pipes.Total alignment, leveling, straightness set- up on center to center distance, arrangement in long run piping at pipe rack, prior for welding works.

PUNCHLISTING WORK:

Replacement of all temporary bolts, knots, and gasket after hydro testing.Final installation of valves to the correct description and orientation of hand wheels.Also included the correct pipe support installed, such as:pipe guide, U- bolt, miscillanous pipe support, pipe shoes and gusset support for small branches of pipeline.Removed all tack welds of the pipelines. PIPE FITTER 'A' AUGUST 24, UP TO JULY 15, 1999

PNOC ENERGY DEVELOPMENT CORP.

TONGONAN, KANANGA LEYTE, PHILIPPINES

DUTIES AND RESPONSIBILITIES:

FABRICATION WORKS:

* Spool pre-fabrication and checking of materials base on bill of materials as per drawing specification.

If all materials and fittings are available such as pipes, elbows, flanges, sockolets, weldolets, and others, we assemble that base on isometric drawing. Some particular diameters are: big bore and small bore with their designated thickness from 80, 60, 40 and also standard schedule. All pipelines are mostly carbon steel. Also fabrication of pipe shoes, PSSP and PSGP type, cross girder and shear keys.

HANDLING WORKS:

Hauling of fabricated spools, pipe shoes and girder from fabrication shop to field area and segrigation to their pipeline position, to well pad, to separator vessel and to yard area.

FINAL FIT-UP AND INSTALLATION:

*Final fit-up and installation of steam pipeline from well pad 503 (well 514D) 14ӯ schedule 80 joint # 1 to joint 21 including one (1) set of PTA (Pressure Tapping) two (2) sets of SPB (Sample Points) and one (1) set of LPD (Low Point Drain) 45 in position. Bolting is also needed in flange to flange joints

*Final fit-up and installation of steam pipeline from WELL PAD 503 (WELL PAD 515D) 12ӯ schedule 80 from joint 1 to joint 21 including one (1) set HPV (High Point Vent) two (2) sets SPB (Sample Points) one (1) set LPD (Low Point Drain).

*Final fit-up and installation of steam pipeline from separator of 501 to Re- Injection line to 502.Pipelines installed are:24ӯ, 20ӯ, 18ӯ, 16ӯ 14ӯ

*Final fit-up and installation of steam pipeline from steam header of 509 separator to main plant steam turbine and also installation of drain pots including steam trap.Pipe installed are:36ӯ, 30ӯ, 24ӯ, steam traps are 1ӯ and ү.

*Installation of pipe support such as:cross girder, pipe shoes, support head, christmas tree support and counter weight support that base to their position and location.Bolting is also included in flange to flange joints. PUNCHLISTING WORKS:

Replacement of all temporary bolts, knots and gasket.Final installation of valves to the correct orientation of hand wheels.Also including the correct pipe support installed such as:pipe shoes,vertical support, angle bar support.



Contact this candidate