Post Job Free

Resume

Sign in

Journeyman Electrician Safety Training

Location:
Cebu City, Philippines
Posted:
February 01, 2024

Contact this candidate

Resume:

FIGURACION, MOISES DOMINGUEZ

Address; *** F. MJ Cuenco, Brgy. Tinago, Cebu City,6000

Email Address: ad295f@r.postjobfree.com, phone No.: 096******** APPLIED POSITION: ELECTRICIAN

PERSONAL DATA:

Date of Birth : August 28, 1960

Place of Birth : Cebu City

Citizenship : Filipino

Civil Status : Single

Height : 5’7”

Weight : 140 lbs.

Sex : Male

EDUCATIONAL BACKGROUND:

MARCH 1985

BACHELOR OF SCIENCE IN ELECTRICAL ENGINEERING, UNIVERSITY OF THE VISAYAS DIONISIO JAKOSALEM ST., CEBU CITY 6000

1976-1980

SECONDARY EDUCATION, UNIVERSITY OF THE VISAYAS

DIONISIO JAKOSALEM ST., CEBU CITY 6000

1970-1976

PRIMARY EDUCATION, TEJERO ELEMENTARY SCHOOL

MJ CUENCO, BRGY. TEJERO, 6015 PARIAN, CEBU CITY

TRAINING AND SEMINARS

HILTI Qualified Operator M4O Gas Detection Training HILTI Corp. Albian Sands

August 2008 June 23, 2008

Arial Work Platform Fall Protection

CICT CICT

July 8, 2006

Basic Safety Training Construction Safety Training System Far East Maritime Foundation Inc. CLAC

January 24, 2005-February 1, 2005 April 3, 2006

Basic Life Support First Aid Training Standard

Philippine Red Cross Philippine Red Cross

May 9-10, 2011 May 11,14, 2011

LEADMAN ELECTRICIAN/WORKING FOREMAN SJV Sales and Construction Company 987 JULIO DIAZ ST., CEBU CITY

FEBRUARY 2021

Read and interpret an auxiliary drawing

Estimates materials and equipment device cable that are specified in the drawing

Progress reporting in daily and weekly activities and materials, cable, device, and manpower

Make a chart for accomplishment of every system in Auxiliary in every floor in the building

Cables, device are requested by our daily activities functional testing device and equipment of the system such as public address, LAN, Telephone, Cable TV, LAN Intercom and other . ELECTICAL FOREMAN GIGATECH INC.

DUHA ST., PARAÑAQUE CITY

SEPTEMBER 2019 T – DECEMBER 2020

Read and interpret an auxiliary drawing

Estimates materials and equipment device cable that are specified in the drawing

Progress reporting in daily and weekly activities and materials, cable, device, and manpower

Make a chart for accomplishment of every system in Auxiliary in every floor in the building

Cables, device are requested by our daily activities functional testing device and equipment of the system such as public address, LAN, Telephone, Cable TV, LAN Intercom and other . ELECTICAL FOREMAN, NET PACIFIC INC.

LIGASPI ST., MAKATI CITY

OCTOBER 2018 – JULY 2019

Read and interpret an auxiliary drawing

Estimates materials and equipment device cable that are specified in the drawing

Progress reporting in daily and weekly activities and materials, cable, device, and manpower

Make a chart for accomplishment of every system in Auxiliary in every floor in the building

Cables, device are requested by our daily activities functional testing device and equipment of the system such as public address, LAN, Telephone, Cable TV, LAN Intercom and other . TECHNICAL SALES REPRESENTATIVE, ASIA MARK CONSTRUCTION AND SALES CORP. PASONG TAMO ST., MAKATI CITY

JANUARY 2014 – AUGUST 2018

Read and interpret an auxiliary drawing

Estimates materials and equipment device cable that are specified in the drawing

Progress reporting in daily and weekly activities and materials, cable, device, and manpower

Make a chart for accomplishment of every system in Auxiliary in every floor in the building

Cables, device are requested by our daily activities functional testing device and equipment of the system such as public address, LAN, Telephone, Cable TV, LAN Intercom and other .

Project proposal for equipment labor, material in the proposal. ELECTRICAL/ACTING QUALITY ASSURANCE, LEDCOR PROJECTS LONG LAKE PROJECT/ABIAN SAND

APRIL 2006 – JUNE 2009

Promote and familiarize all the product that I want to offer to our coming clients

Get all the details of inquire tools, machine equipment and others before I have to offer our product that I must promote or equivalent, or specified

Make a product demonstration so that the client see how it works

Give them warranty time if they buy the product that sell.

Collect time if we success.

SLEF-EMPLOYED, ELECTRICAL SUBCONTRACTOR

NOVEMBER 2003 – 2005

Subcontractor for residential houses, and commercial establishment for electrical installation, repair, troubleshooting.

Read the electrical blueprints or make a drawing and compute the load in branches and main supply for feeder so you can get the ratings with Philippine standards for cable, fuse, breaker materials etc.

Installation of the raceway, monitoring of equipment, panels, device, fixtures etc. falling cables, wire that is specified in the drawing.

Layout the auxiliary installation for cable, telephone, LAN, and others

Testing cable wires and equipment lightning fixtures before installing or start to work, make as build plan before turning over the work.

ELECTRICAL (E/I), ABB LUMMUS GLOBAL OVERSEAS CORP. SAN NICOLAS, ARUBA

OCTOBER 1999- JANUARY 2002

Mounting electrical transformer, bus duct switch gear and other accessories for installation

Layout cable raceway like cable tray, RSC pipe and PVC pipe

Cable falling of power and instrument cable.

Terminate cable terminals on switch gear distribution panel, junction box and instrument testing

Loop checking and testing or electrical layout instrument and troubleshoot failure in the circuit

Assist the vendor for their work to their installed product

Functional testing commission for operation and start-up operation on the installed electrical instrument installation.

ELECTRICIAN, (E/I) MCCONNEL DOWEL

AL KHOLLAR LL95L KINGDOM OF SAUI ARABIA

FEBRUARY 1999 – SEPTEMBER 1999

Layout cable raceway like cable tray, cable duct, RSC/EMT pipe

Installed instrument stanchion, junction box, marshaling panel and control panel

Terminated control and power cable instrument, junction box and amrshall panel and switch gear

Layout and mounting switch gear, control panel, power, and lightning panel

Installed marshall panel, junction box, instrument transmitter, controller recorded etc.

Loop checking and insulation testing on cable layout in field and MCC substation

Function testing and start-up on MCC switch gear and AHU

Layout for piping airline and tubing or instruction such as control valve transmitter, recorder, transducer etc.

Terminate cable in instrument and junction box to Marshall Cabinet SEPT. 1997-JAN.1999 – NAIA II PROJECT, PASAY -LEADMAN JUL. 2003 – OCT. 2004-SANK VO SEIKE PROJECT SUBIC -ELECTRICIAN A OCT. 2001-JAN. 2002 – NIDEE PROJECT, LAGUNA -ELECTRICIAN A LEADMAN/ACTING ELECTRICAL FOREMAN, KINDEN PHILS. CORPORATION ST. LEGASPI VILLAGE, MAKATI CITY

Layout IMC conduit pipe

Install cable tray ladder type

Layout auxiliary system such as telephone line. Heat smoke detector, and paging system

prepare materials used to our daily work

translate electrical plan into real installation

layout auxiliary system, telephone, fire alarm system

Distribute man power to our daily activity

Lightning layout and install fixture, lightning panel with automatic control

Cable palling on Feeder and Distribution lime auxiliary cable

Termination on switch gear, power, and lightning panels

Startup commissioning for installed electrical machine and equipment MAY 1997-AUG. 1997 ABB-NAGA

JAN. 1994-SEPT. 1994 PSPC-BATANGAS

MAR. 1993-JUL. 1993 FLOUR DANIEL BATANGAS

INDUSTRIAL ELECTRICIAN (E/I) EEI CORPORATION

ST. LEGASPI VILLAGE, MAKATI

Mounting substation accessories such as capacitor, resistor, current transformer, cut out, insulator transmission etc.

Cable falling from control panel to electrical devices.

Loop checking cable and insulation testing of cable

Termination of cable in control panel, power panel electrical device

Start-up and functional testing of the installed electrical device

Assist vendor for the work of testing RLC. Torque on terminal contract.

Transformer Irrection of Mother transmission Tower Power line. LEADMAN/ACTING ELECTRICAL FOREMAN, KINDEN PHILS. CORPORATION 917 JUL O DIAZ ST., GUADALUPE, CEBU CITY, 6000

FEBRUARY 2021-UP TO PRESENT

Layout IMC conduit pipe

Install cable tray ladder type

Layout auxiliary system such as telephone line. Heat smoke detector, and paging system

prepare materials used to our daily work

translate electrical plan into real installation

layout auxiliary system, telephone, fire alarm system

Distribute man power to our daily activity

Lightning layout and install fixture, lightning panel with automatic control

Cable palling on Feeder and Distribution lime auxiliary cable

Termination on switch gear, power, and lightning panels

Startup commissioning for installed electrical machine and equipment



Contact this candidate