FIGURACION, MOISES DOMINGUEZ
Address; *** F. MJ Cuenco, Brgy. Tinago, Cebu City,6000
Email Address: ad295f@r.postjobfree.com, phone No.: 096******** APPLIED POSITION: ELECTRICIAN
PERSONAL DATA:
Date of Birth : August 28, 1960
Place of Birth : Cebu City
Citizenship : Filipino
Civil Status : Single
Height : 5’7”
Weight : 140 lbs.
Sex : Male
EDUCATIONAL BACKGROUND:
MARCH 1985
BACHELOR OF SCIENCE IN ELECTRICAL ENGINEERING, UNIVERSITY OF THE VISAYAS DIONISIO JAKOSALEM ST., CEBU CITY 6000
1976-1980
SECONDARY EDUCATION, UNIVERSITY OF THE VISAYAS
DIONISIO JAKOSALEM ST., CEBU CITY 6000
1970-1976
PRIMARY EDUCATION, TEJERO ELEMENTARY SCHOOL
MJ CUENCO, BRGY. TEJERO, 6015 PARIAN, CEBU CITY
TRAINING AND SEMINARS
HILTI Qualified Operator M4O Gas Detection Training HILTI Corp. Albian Sands
August 2008 June 23, 2008
Arial Work Platform Fall Protection
CICT CICT
July 8, 2006
Basic Safety Training Construction Safety Training System Far East Maritime Foundation Inc. CLAC
January 24, 2005-February 1, 2005 April 3, 2006
Basic Life Support First Aid Training Standard
Philippine Red Cross Philippine Red Cross
May 9-10, 2011 May 11,14, 2011
LEADMAN ELECTRICIAN/WORKING FOREMAN SJV Sales and Construction Company 987 JULIO DIAZ ST., CEBU CITY
FEBRUARY 2021
Read and interpret an auxiliary drawing
Estimates materials and equipment device cable that are specified in the drawing
Progress reporting in daily and weekly activities and materials, cable, device, and manpower
Make a chart for accomplishment of every system in Auxiliary in every floor in the building
Cables, device are requested by our daily activities functional testing device and equipment of the system such as public address, LAN, Telephone, Cable TV, LAN Intercom and other . ELECTICAL FOREMAN GIGATECH INC.
DUHA ST., PARAÑAQUE CITY
SEPTEMBER 2019 T – DECEMBER 2020
Read and interpret an auxiliary drawing
Estimates materials and equipment device cable that are specified in the drawing
Progress reporting in daily and weekly activities and materials, cable, device, and manpower
Make a chart for accomplishment of every system in Auxiliary in every floor in the building
Cables, device are requested by our daily activities functional testing device and equipment of the system such as public address, LAN, Telephone, Cable TV, LAN Intercom and other . ELECTICAL FOREMAN, NET PACIFIC INC.
LIGASPI ST., MAKATI CITY
OCTOBER 2018 – JULY 2019
Read and interpret an auxiliary drawing
Estimates materials and equipment device cable that are specified in the drawing
Progress reporting in daily and weekly activities and materials, cable, device, and manpower
Make a chart for accomplishment of every system in Auxiliary in every floor in the building
Cables, device are requested by our daily activities functional testing device and equipment of the system such as public address, LAN, Telephone, Cable TV, LAN Intercom and other . TECHNICAL SALES REPRESENTATIVE, ASIA MARK CONSTRUCTION AND SALES CORP. PASONG TAMO ST., MAKATI CITY
JANUARY 2014 – AUGUST 2018
Read and interpret an auxiliary drawing
Estimates materials and equipment device cable that are specified in the drawing
Progress reporting in daily and weekly activities and materials, cable, device, and manpower
Make a chart for accomplishment of every system in Auxiliary in every floor in the building
Cables, device are requested by our daily activities functional testing device and equipment of the system such as public address, LAN, Telephone, Cable TV, LAN Intercom and other .
Project proposal for equipment labor, material in the proposal. ELECTRICAL/ACTING QUALITY ASSURANCE, LEDCOR PROJECTS LONG LAKE PROJECT/ABIAN SAND
APRIL 2006 – JUNE 2009
Promote and familiarize all the product that I want to offer to our coming clients
Get all the details of inquire tools, machine equipment and others before I have to offer our product that I must promote or equivalent, or specified
Make a product demonstration so that the client see how it works
Give them warranty time if they buy the product that sell.
Collect time if we success.
SLEF-EMPLOYED, ELECTRICAL SUBCONTRACTOR
NOVEMBER 2003 – 2005
Subcontractor for residential houses, and commercial establishment for electrical installation, repair, troubleshooting.
Read the electrical blueprints or make a drawing and compute the load in branches and main supply for feeder so you can get the ratings with Philippine standards for cable, fuse, breaker materials etc.
Installation of the raceway, monitoring of equipment, panels, device, fixtures etc. falling cables, wire that is specified in the drawing.
Layout the auxiliary installation for cable, telephone, LAN, and others
Testing cable wires and equipment lightning fixtures before installing or start to work, make as build plan before turning over the work.
ELECTRICAL (E/I), ABB LUMMUS GLOBAL OVERSEAS CORP. SAN NICOLAS, ARUBA
OCTOBER 1999- JANUARY 2002
Mounting electrical transformer, bus duct switch gear and other accessories for installation
Layout cable raceway like cable tray, RSC pipe and PVC pipe
Cable falling of power and instrument cable.
Terminate cable terminals on switch gear distribution panel, junction box and instrument testing
Loop checking and testing or electrical layout instrument and troubleshoot failure in the circuit
Assist the vendor for their work to their installed product
Functional testing commission for operation and start-up operation on the installed electrical instrument installation.
ELECTRICIAN, (E/I) MCCONNEL DOWEL
AL KHOLLAR LL95L KINGDOM OF SAUI ARABIA
FEBRUARY 1999 – SEPTEMBER 1999
Layout cable raceway like cable tray, cable duct, RSC/EMT pipe
Installed instrument stanchion, junction box, marshaling panel and control panel
Terminated control and power cable instrument, junction box and amrshall panel and switch gear
Layout and mounting switch gear, control panel, power, and lightning panel
Installed marshall panel, junction box, instrument transmitter, controller recorded etc.
Loop checking and insulation testing on cable layout in field and MCC substation
Function testing and start-up on MCC switch gear and AHU
Layout for piping airline and tubing or instruction such as control valve transmitter, recorder, transducer etc.
Terminate cable in instrument and junction box to Marshall Cabinet SEPT. 1997-JAN.1999 – NAIA II PROJECT, PASAY -LEADMAN JUL. 2003 – OCT. 2004-SANK VO SEIKE PROJECT SUBIC -ELECTRICIAN A OCT. 2001-JAN. 2002 – NIDEE PROJECT, LAGUNA -ELECTRICIAN A LEADMAN/ACTING ELECTRICAL FOREMAN, KINDEN PHILS. CORPORATION ST. LEGASPI VILLAGE, MAKATI CITY
Layout IMC conduit pipe
Install cable tray ladder type
Layout auxiliary system such as telephone line. Heat smoke detector, and paging system
prepare materials used to our daily work
translate electrical plan into real installation
layout auxiliary system, telephone, fire alarm system
Distribute man power to our daily activity
Lightning layout and install fixture, lightning panel with automatic control
Cable palling on Feeder and Distribution lime auxiliary cable
Termination on switch gear, power, and lightning panels
Startup commissioning for installed electrical machine and equipment MAY 1997-AUG. 1997 ABB-NAGA
JAN. 1994-SEPT. 1994 PSPC-BATANGAS
MAR. 1993-JUL. 1993 FLOUR DANIEL BATANGAS
INDUSTRIAL ELECTRICIAN (E/I) EEI CORPORATION
ST. LEGASPI VILLAGE, MAKATI
Mounting substation accessories such as capacitor, resistor, current transformer, cut out, insulator transmission etc.
Cable falling from control panel to electrical devices.
Loop checking cable and insulation testing of cable
Termination of cable in control panel, power panel electrical device
Start-up and functional testing of the installed electrical device
Assist vendor for the work of testing RLC. Torque on terminal contract.
Transformer Irrection of Mother transmission Tower Power line. LEADMAN/ACTING ELECTRICAL FOREMAN, KINDEN PHILS. CORPORATION 917 JUL O DIAZ ST., GUADALUPE, CEBU CITY, 6000
FEBRUARY 2021-UP TO PRESENT
Layout IMC conduit pipe
Install cable tray ladder type
Layout auxiliary system such as telephone line. Heat smoke detector, and paging system
prepare materials used to our daily work
translate electrical plan into real installation
layout auxiliary system, telephone, fire alarm system
Distribute man power to our daily activity
Lightning layout and install fixture, lightning panel with automatic control
Cable palling on Feeder and Distribution lime auxiliary cable
Termination on switch gear, power, and lightning panels
Startup commissioning for installed electrical machine and equipment