Ray Copes Jr (Bubba)
Tempe Az *5283
ad28qc@r.postjobfree.com
Summary of Qualifications
I have been responsible for a variety of survey projects. I have twelve (12+) years of experience in Survey Engineering, Hydrographic, Topographic, Boundary, Right-of-way Acquisitions, Geodetic Control, Pipeline and Construction Surveys. These surveys have been performed for the States, Counties, Municipalities, Commercial Properties, Private Properties and in the Oil & Gas Industry (Onshore & Offshore).
Professional Experience
Whiteley Infra
Survey Party Chief (2/23 - 5/23)
Asbuilt Mainline and Tieins
JN Services
Lead Survey Party Chief (11/21-12/22)
Boundry Survey
Preliminary Survey
TRC
Survey Party Chief (9/21-11/21)
Preliminary survey
LW Survey
Survey Party Chief Bemidji MN (10/20-3/21)
Initial staking for of ROW wetlands water bodys as well as profile waterbodys as we came to them.
Refesh and Ddelineate wetlands for soil separation
Weld mapping and joint mapping then moved once all construction kicked off
Lowering in Mainline crew shot mainline as it was lowered in using the module
LW Survey
Survey Partychief Glendive MT (4/19-11/19)
arestake staking of ROW
Sttaked boundary Shot Tie-Ins restake C/L when called sent out to
assist crews.
Audubon Field Solutions
Survey Supervisor, Rocksprings, TX (10/18-2/19)
Supervised the preliminary survey & construction staking of a 30 inch pipeline for Phillips 66
Report daily/weekly progress to Phillips 66 construction manager in field office
Oversee 7 field crews to ensure that the contractor’s daily needs are met
D3 Survey and Mapping
Survey Supervisor, Pecos, TX (11/17-10/18)
Supervised the survey of an as built over the Alpine Midstream Gathering System
Report daily/weekly progress to construction manager in field office
Oversee 7 field crews to ensure that the contractor’s daily needs are met
D3 Survey and Mapping
May 2016 – October 2017
Party Chief DAPL
Construction Staking on 3 spreads of DAPL project
Worked with clearing crew assisting with outer limits
Shot mainline as pipe was lowered into the ditch
Woodgroup/Mustang
September 2015 – May 2016
Party Chief, Long Star Express
Construction Staking, locating existing lines, marked pipeline crossings and overhead power lines
Worked as a tie-in and bore crew
Golden Field Services
September 2014 – July 2015
Party Chief, PEX II
Was the project lead on re-staking for the clearing crews
Worked as a tie-in crew, bore crew, and main line
Also staked out and collected the data for all completed valve sites.
LW Survey
May 2013 – September 2014
Party Chief, DCP
Was the project lead on re-staking for the clearing crews
Worked as a tie-in crew, bore crew, and main line
Also staked out and collected the data for all completed valve sites.
Gullet & Associates 2011 - 2013
Instrument Operator
Worked on various different aspects of pipeline. Including routing, valve replacement, anomaly dig up, and preliminary survey
Wellsco, Inc. 2007 - 2008
Instrument Operator
Worked on various different aspects
Education
Oak Grove High School
High School Diploma
Professional Development & Training
TWIC
Basic Plus
First aid and CPR
Several safety council badges
Field Equipment/Software Experience
Trimble R10, Trimble R8 GNSS system, Trimble TSC3, TSC2 data collectors, Trimble TSC3 Total Station, Microsoft Office.