Post Job Free

Resume

Sign in

Abu Dhabi Quality Engineer

Location:
Mansehra, Khyber Pakhtunkhwa, Pakistan
Salary:
25000
Posted:
January 31, 2024

Contact this candidate

Resume:

Curriculum vita Muhammad Khalid QAQC Manager (ISO 9001-2015, CMQ)

Contact Address: Abu Dhabi UAE Phone: +971********* Email: ad284e@r.postjobfree.com LinkedIn: https://www.linkedin.com/in/muhamma d khalid 8318b415/ Smarmy Key Headlines:

Professional Civil Engineer having more than 30 years of experience in the hard core fields of “Civil Engineering in construction supervision and quality control”. Handled projects with competent cross functional skills and ensured timely deliverables. Well versed with Project specifications, Quality Management systems, and their implementation in the projects; HSE Regulations. The distinction of having multinational experience in projects for internal roads (Flexible & Rigid pavement), highways, bridges, underground Parking structures, Infrastructure projects Industrial and Residential buildings, power plants, sewerage networking, sewerage trunk lines, pumping stations, STP, Irrigations, and portable water reservoirs, Sea Water Intakes, storage Silos, Industrial warehouses, railways line and structures, street lighting, NDRC/HDD, Security fencing, Guard rails, Sewer, Strom, Portable water, Irrigation, Telecom, Power, Gas, Pipelines Helipads, Hard and soft Landscape, Ports related Infrastructures.

Education:

Civil Engineering 1992 KPK Pakistan

Certifications:

IMS (ISO.9001 2015 QMS, 45001 2018 OHS MS and 14001 2015 EMS) 2019, 2017 & 2016

ISO 9001 2015 QMS Lead Auditor Certified by IRCA 2016

CMQ Certified Quality Manager course from 3Fold Education UAE 2014

MEDIC first aid basic with CPR/AED 2010

Firefighting and fire awareness 2010

Workshops and Seminars:

2018: MUSANADA Quality and HSE Awareness Forum (By PMCD)

2013: Completed 2 days’ workshop on EFQM European Foundation for Quality Management UAE

2012: Completed 2 days’ workshop on PMP from 3Fold education UAE

2012: Completed 2 days’ workshop on Quality Tools from 3Fold education

2009: Working at Height Training, SLWP EMAL, Abu Dhabi, UAE

2009: Confined Space Training, SLWP EMAL, Abu Dhabi, UAE

2008: QMS Awareness & Implementation, Emirates Consultants, Dubai

2006: HSE Induction, Safety Technical Services Parsons UAE Client approvals:

Etihad Rail Project on Etihad rail package 2 B as QAQC Manager

MUSANADA for Infra and str Project as Sr. QAQC Engineer for AUH/Alain

ADNOC infrastructure in Ruwais Housing project As Sr. QAQC Engineer

Emirates Aluminum EMAL (Phase I) As QAQC Supervisor Civil

ADM Abu Dhabi Municipality as Sr Structure Inspector (Sheikh Zayed Mosque)

ADM Abu Dhabi Municipality as Civil Inspector (Road Section),

ADSSC (SPC) Sewerage Project committee As Civil Inspector,

RTA Road and Transport Authority Dubai, As Civil Inspector,

DM Dubai Municipality as Civil Inspector, (Road and Drainage Section)

AADM Al Ain Municipality as Civil Inspector, (Drainage section Skills, Highlights/ Competencies

Quality Control, Quality Assurance, Collaboration, Compliance, Innovation, Technical support, Communication Skills, Decision Making, Teamwork, Work Standards, Motivation, Reliability, Problem Solving, Adaptability, Planning, and Organizing, MS Office, Documentation.

Computer Skills

Windows & Office tools, ACONEX, and ADVANCED EXCEL Languages:

English, Arabic, Urdu

Curriculum vita Muhammad Khalid QAQC Manager (ISO 9001-2015, CMQ) Contact Address: Abu Dhabi UAE Phone: +971********* Email: ad284e@r.postjobfree.com LinkedIn: https://www.linkedin.com/in/muhamma d khalid 8318b415/ Employment History:

(1st April 2023 to Date): - QAQC Manager -GTGC-RMB (JV) Abu Dhabi Project: Construction of Roads and Infrastructure works at MBZ Zone C SCOPE: Construction of Internal roads and Infrastructure works in MBZ zone “C” (C, C2, C3, C4) Abu Dhabi” includes the Construction of internal Road Roads, Earthworks, Underground Utilities & Paving Tiles, Concrete Works, Storm Water Drainage System, Water Works, Irrigation Works Including Raw water pumping station, Sewerage Works, Traffic sings & Markings, Street Lighting Works and Telephone Works Etc.

(September 2021 to March 2023): - QAQC Manager -Ghantoot China Rail (JV) Abu Dhabi Project: Etihad rail Package-2b (223KM Track line with structures & utilities) SCOPE: The scope of the project includes approximately 240Km Railway Line double track, Bridge structures (Under and over Bridges) Utility culverts, underpasses, MSE walls, retaining walls, earthworks from railway formation to sub ballast level, permanent and temporary highway, access, and maintenance road works, surface and subsoil drainage including detention ponds, culverts, pipes, trenches, open channel drains, embankment erosion protection, highways, and access roads. Structures will include railway under bridges, over bridges, pipe, and other utility crossings, permanent and temporary utility protection, environmental culverts, camel bridges and culverts, noise barriers, fencing Etc.

(September 2020 to Sep 2021): - QAQC Manager (Team Leader)- Ghantoot Group Abu Dhabi Project: Construction of 3 marine Bridges and roads for Extending Sheikh Zayed Bin Sultan Street at Umm Lafina Island to connect Al Reem Island Contract-1 SCOPE: Construction of 3 numbers of bridges over the navigational (Marine Bridges) channels and 3x3 carriageways mainly bridges, including pre Piling works pre cast girders, Deck Slab, Abetments, Deck slab Waterproofing, and other related activities, and roads with associated utilities, Including Storm Drainage, Streetlighting network, Security Fence, MSE wall, sea Wall and revetment, VMS Gantries, road crossing, and future ducts, chambers, and manholes, HDD Horizontal Direct Drilling, Derigging work Etc. RESPONSIBILITIES:

Develop and maintain the Project Quality Plan, and responsible for the implementation of QMS requirements and ensuring compliance.

Support the Project Director/Manager on day-to-day QAQC matters and preparation of QAQC reports.

Manage the submission of QAQC Procedures and other documentation for consultant approval.

Responsible for creating, executing, and implementing the project QA/QC Plan; managing the QA/QC team and monitoring the site quality, documentation of the process in accordance with contract specifications, documents deviations from the contracts, and providing plans to rectify contract deviations.

Manage and oversee project quality to ensure compliance with codes, standards, regulations, specifications, and QMS requirements, and manage the development and implementation of the QMS for planning, inspection, documentation, and construction activities.

Monitor the progress and effectiveness of the project quality management system and recommend improvements when required.

Develop and review of the Project Quality program documentation manuals, work process, and reporting of quality records management of quality documents.

Prepare and issue audit reports noting system non-conformances (NCRs) and verifying effective corrective/ preventive actions.

Deliver audit assessment findings to the management and evaluate the need for any corrective/ preventative action.

Assess the subcontractor’s capabilities to meet the quality requirements of the project as required.

Verify contractor quality requirements are specified to vendors and contractor documentation submittals.

Responsible for the performance of all inspections and testing activities as defined by the contract.

Assures that the obligations of the contract for testing and record keeping are adhered to control calibrated measuring and test equipment used on the project.

Maintain the project quality records for the construction phases and quality audit plans.,

Establish and manage a field document control system for construction drawings, specifications, test and inspection reports, vendor data, and as-built drawings.

Perform evaluations of sub-contractors’ facilities to determine their capabilities in meeting the quality requirements.

Liaison with municipality authorities and other relevant organizations. Curriculum vita Muhammad Khalid QAQC Manager (ISO 9001-2015, CMQ) Contact Address: Abu Dhabi UAE Phone: +971********* Email: ad284e@r.postjobfree.com LinkedIn: https://www.linkedin.com/in/muhamma d khalid 8318b415/

Conduct periodic Quality Program training for site supervisory personnel.

Monitor all quality-related activities on the project.

(March 2020 to Sep 2020): - Sr. QAQC Engineer (Ghantoot Transport and General Contracting) Project: Etihad Rail Project-C0304 Package 2B (Utility Works) SCOPE: Construction of Underground Utilities including Protection and termination, Relocation, New proposed pipeline installation, Road and railway Crossing ducts, construction of utilities manholes and chambers, waterproofing protection of structure, service roads, etc. related to the Scope of Etihad Rail Project.

(June 2018 to March 2020): -: Sr. QAQC Engineer (Ghantoot Transport and General Contracting) Project: - Construction of Internal roads and Infrastructure works in Al Shawamekh Area for Sectors (12,7), AUH

SCOPE: Construction of Internal roads and Infrastructure works in Al Shawamekh Area for Sectors (12,7), Abu Dhabi” includes the Construction of internal Earthwork, Roads & Paving, Concrete Works, Storm Water Drainage System, Water Works, Irrigation Works, Sewerage Works, Traffic sings & Markings, Street Lighting Works and Telephone Works, NDRC Etc.

Project: - Construction of Al Aryum Interchange on Mafraq Ghweifat (E11) Abu Dhabi Contract NO. PD/CA/BPS/AT/R508/P147-2014-DOT/17/146 SCOPE: Construction of Al Aryum interchange including all earthwork, Road works: Rip rap, Protection, and relocation of existing utilities, storm drainage pipelines, chambers manholes spillway, RC, Concrete barrier, Crush cushion, Corrugated beam barrier, Road signs, Gantry, Street light works. Project: - Construction, completion, and remedy of Defects of Zayed City Water Supply Main (PD/CA/BPS/Sy/R372/P126-2013/18/023).

SCOPE: Construction of a water supply main to supply Zayed City. The proposed water pipeline will run eastward along the Abu Dhabi Sweihan road in parallel with the existing DN900 ADDC pipeline. The ultimate supply will be from the existing DN1600 Transco main along with Abu Dhabi Dubai Highway (Shati Al Raha) from Unit III, the proposed DN1600 Transco main from Unit III and Unit IV, and twin DN900main between Umm Al Nar and Unit IV pumping stations

(March 2015 to Jun2018): - Sr. QA/QC Engineer - Ghantoot Transport and General Contracting Project: - Ruwais Housing Complex Expansion Phase IV construction of infra work Package1 Project 7010C9.

SCOPE: Construction of Roads networks including Asphaltic and concrete paver toping roads and parking, Sewer network including 2 pumping stations, Drainage, including 3 evaporation ponds, Potable water network including 3 numbers of water reservoirs and water pumping station, Irrigation network Chilled water network, SNG networks and SNG Plant, 11Kv network and Sub Station, street lighting networks, sewer, stormwater, Potable water, Irrigation, Manhole and Chambers, Heard and soft Landscaping, construction of cycle track And construction. RESPONSIBILITIES:

I was involved in the project from the start of the excitation to handing over to authorities including Musanada, ADM, ADSSC, ADDC, Etisalat, Du, ADMCC, ADNOC, GESCO, Dolphen, and Transco.

Responsible for ensuring that Company Quality Management policy, plans, and procedures are implemented effectively and are suitable for the purposes and use for which they are intended.

Establish a Project Quality audit program & schedule and perform the Project Quality Audit within the project organization. Performing the Lead role of executing the Project with regard to QA/QC and Contract requirements.

Drafting, preparing, and reviewing Method Statements, Quality Control Procedures, Inspection Test plans, and Checklist., prepare and submit monthly weekly QA/QC Report as required.

Having an active role in ITR (Inspection Request request) process.

Assigning responsibilities to concerned QA/QC Engineers/Inspectors and other staff, guiding and directing Site Engineers with regards to every day’s business.

Remain in close coordination with the Construction Manager regarding the preparation of Critical Method Statements and raising of Inspection Test Requests. Curriculum vita Muhammad Khalid QAQC Manager (ISO 9001-2015, CMQ) Contact Address: Abu Dhabi UAE Phone: +971********* Email: ad284e@r.postjobfree.com LinkedIn: https://www.linkedin.com/in/muhamma d khalid 8318b415/

Preparing procedures as required by the Company as per project requirements.

Enforcing the compliance of the requirements through drafting a memorandum and show cause notice.

Assigning material co-coordinators for the submission and approval of Suppliers/Sub Contractor Prequalification Documents (PQD) and Material Approval Requests (MAR) as per client and project specification requirements.

Ensuring timely submission of the Material Verification/inspection Requests (MVR/MIR).

Having a holistic view over the Independent Testing Laboratory (ITL) to facilitate and operate the testing business needs of the project with client consent.

Attending and drafting all Weekly QA/QC progress meetings, coordinating with all key personnel of the Project with regards to the aspects of Quality and their contribution, and facilitating all 1st Party, 2nd Party, and 3rd Party Audits of the Project.

Proposing corrective action for approval and upon approval endorsing the closure of NCR. Making observations audit of various phases of the project comprehensively to ensure the level of compliance to Project Requirements and identify any gaps, Coordinating with the engineering department regarding shop drawing approvals.

Responsible to archive Quality Documents and records as Organization Process Assets for handing over and future reference.

Assist in Implement Project Quality Plans and Procedures, ensuring IMS requirements and monitoring its implementation. Conduct Regular Formal/Informal Surveillance at the site.

Liaise with the Consultant/Client in the closing of any raised non conformance activities and identify their preventive and corrective action.

Set up the inspection system framework and ensure all activities are being inspected. Set up the project logs and system for recording all the performed testing.

Ensure that all the QA/QC records are in place and traceability of documents is feasible.

Prepare and conduct an internal training program prior to the start of any activity.

Follow Up with Subcontractors and suppliers. Follow Up Outdoor Testing and inspection of short lead items jointly with a consultant. Attending weekly, and monthly QAQC Progress meetings, and preparation of reports. Monitoring site construction activities.

(June 2010 to March 2015): - QA/QC Engineer Al Jaber Group Projects: -

1. Al Jaber Asphalt and Concrete Plant. 10th March 2013 to 30th March 2015) SCOPE: Production of Asphalt, concrete, and Pre Casting for Al Jaber Project and private client, 2. Khalifa Port (KPIZ) (1st Dec 2011 to 10th March 2013) SCOPE: Construction of bridges, quay wall, roads, heavy vehicle parking, sewer, Stormwater, potable water, 11 and 33Kv network including the construction of Sewerage pumping station, sewerage treatment plant electric 11kv substations, helipad and process, and non process buildings. 3. Development of Al Falah Community) (24th June 2010 to 30 Nov 2011) SCOPE: Construction of roads, parking, sewer, Stormwater, potable water, Irrigation, 11kv network including the construction of 11kv substations, sewerage Pumping station, and Irrigation water storage reservoirs. RESPONSIBILITIES:

On the Asphalt and concrete Plant, I was involved in the Production of Asphalt, Concrete, and Pre Cast Concrete Production for the following Projects:

1 Etihad Railway Phase 1. (Casting of MSE walls, concrete barriers, and manholes/chambers) 2 Habshan Maqta Taweela gas pipeline project (Casting of chambers, protection slabs, barriers Etc.) 3 Dulling of road Ghayati to Madinat Zayed Road.

4 Khalifa Port and Industrial Zone KPIZ.

5 Mafraq Gwaifat Border Highway.

6 Mohammad Bin Zayed City Phase 1 & 2.

Curriculum vita Muhammad Khalid QAQC Manager (ISO 9001-2015, CMQ) Contact Address: Abu Dhabi UAE Phone: +971********* Email: ad284e@r.postjobfree.com LinkedIn: https://www.linkedin.com/in/muhamma d khalid 8318b415/

Created, managed, organized, and direct all Quality Assurance activities for type and production documentation programs. Played a key role in the creation of a proficient and efficient system for ensuring the quality of the product.

Helped other departments to create compliance information packages. Documented various tests performed on manufactured products.

Preparation, Submitting, and follow up of Technical/Material submittals, Prequalification documents. Preparation of operation and maintenance documents (O & M).

Preparation of handing over documents and submitting and following up.

Coordination with JV and PMC for different issues and documentation. NCR, QAN, CAPA Etc management from concept to completion and follow up with PMC, Consultants, and construction.

Providing QA/QC input to project management on quality related subjects and others if necessary. Develop/update/project documents & inspection reports & records.

Follow up with contractor & third party for timely submission of test reports/inspection records. Reports are reviewed for compliance and completeness. Flawlessness in the reports is noted and followed up for corrective measures.

(Dec 2008 to June 2010): - QA/QC Supervisor Worley Parsons SNC JV Project: Construction of Smelter Complex and POWER PLANT of 33Mgw for EMAL SCOPE: Construction of aluminum smelter complex including Smelter complex, 33Mgw power plant with 6 turbines, 11 and 33KvA substations, process and non process Buildings, Seawater intakes, Water, sewer, Gas, and stormwater networking, Construction of storage silos, conveyer belt from the sea loading station to silos and smelter and road networking inside of the complex.

RESPONSIBILITIES:

Carried out QAQC inspection functions as assigned by the Project QAQC Manager.

Carried out process audits for contract manufacturers to check out the quality and stability of the manufactured product.

Review of project documents (Method Statement, ITP, s, Material/Technical Submittals, O&M product datasheet, etc.)

Management of Plant Lab for material testing and product testing within the time frame.

RFI (Request for Inspection) management from concept to completion.

Follow up with the third party for laboratory testing, the flow of test reports & review of test reports.

Planning & executing audits on sub contractor / third party activities. And follow up to close out audit findings/ noncompliance.

Monitor construction activities during the process & final stage, ensuring compliance with project specification, design drawing & MS Deviations from the specification are to be rectified immediately or reported to the design department.

Providing QA/QC input to project management on quality related subjects and others if necessary.

Develop/update/project documents & inspection reports & records. Follow up with contractor & third party for timely submission of test reports/inspection records.

(Oct 2005 to Dec 2008): - Inspector Civil Work/Structure work. Parsons International Projects: -

1. Sheikh Zayed Masque phase 2 Contract No 45B & 45D- Parking Structure and external landscaping, heard scaping decorative works

2. Trip project No C 987/1/1 Breakwater Developments Marina Village Road and parking 3. Trip project No 237/R Interchange bridge at Ruwais industrial intersection. 4. R882/2 Improvement of Al Safooh area road network and 2 bridges on Dubai creek. 5. R924/3 Beautification of Jumeirah Road Dubai

Curriculum vita Muhammad Khalid QAQC Manager (ISO 9001-2015, CMQ) Contact Address: Abu Dhabi UAE Phone: +971********* Email: ad284e@r.postjobfree.com LinkedIn: https://www.linkedin.com/in/muhamma d khalid 8318b415/ SCOPE: Construction of roads and parking, Bridges, underground Parking Structures, helipads, Sewer, drainage, water, irrigation, telephone, networking, and hard and soft landscape. RESPONSIBILITIES:

Carried out all types of inspection for construction activities as assigned by the Resident Engineer. Communicated with the Material division and exterior vendors for inspection and approval. Carried out process audits for contract manufacturers to check out that the product is as per project specifications and client requirements.

(Jul 2004 to Oct 2005): - Inspector Civil Work Dr. Ahmed Abdul Warith-Al Thurath JV Project: DS 115 Development of Qassis and Mohasinia Dubai SCOPE: Construction of sewerage, stormwater, irrigation, and potable water networking. RESPONSIBILITIES:

Carried out inspection for construction activities as assigned by the RE. Carried out process audits for contract manufacturers to check out the quality and stability of the manufactured product.

(Dec 2000 to Jul 2004): - Inspector Civil Work Montgomery Watson Hirza (MWH) Projects:

1. ADDC Project No 716 Al Shawamekh (Sewer network). 2. ADDC Project No 720 Al Haliya (Sewer network)

3. ADDC Project No 722 Al Haliya (Sewer network)

4. ADDC Project No 724 Al Haliya (Sewer network).

SCOPE: Construction of sewerage networking, sewerage pumping stations, NDRC for the road crossing, and NDM for sewer trunk line.

RESPONSIBILITIES:

Carried out all types of inspection for construction activities as assigned by the Resident Engineer.

Communicated with the Material division and exterior vendors for inspection and approval. Created complex product designs in mechanical systems.

Carried out process audits for contract manufacturers to check out the quality and stability of the manufactured product. Developed and carried out engineering alteration orders for presented actions.

Carried out inspection for construction activities as assigned by the Resident Engineer. Communicated with purchasing subdivision and exterior vendors to source apparatus and assemblies.

Carried out process audits for contract manufacturers to check out the quality and stability of the manufactured product. Developed and carried out engineering alteration orders for presented actions.

(Dec 1999 to Dec 2000): - Site Engineer Al Jaber Group Abu Dhabi 1. Drainage and sewerage networking, and Potable water network (Sector Road Project Baniyas) 2. Khalifa city ‘’B’’ Mafraq Project # KH 944.

SCOPE: Construction of sewerage, stormwater, irrigation, and potable water networking RESPONSIBILITIES:

On the above Projects, I was responsible for vendor joint inspection with client and consultant, I Was also responsible for arranging inspection with the consultant and getting approvals of completed work. I was responsible for independently handling the assigned work of my area from setting out to the handing over of the project, preparation of shop drawings, and method statement for civil works.

(July 1993 to Dec 1999): - Site/Project Engineer Qavi Engineering (Pvt) Ltd Projects: -

1. ICI Port Qasim Karachi Pakistan (Steel Structure Industrial Building.) 2. SKB SmithKline Beachem Ltd Pharmaceutical Karachi (Steel Structural industries.) 3. Pakistan Motorways Islamabad Lahore Section Guard rail and Fencing Project. 4. Best way Cement Hattar Industrial Area Pakistan. 5. Pepsi Cola International HIT Pakistan.

6. Coronet Foods English Biscuit Factory HIT Pakistan. 7. Pine matches Factory HIT Pakistan.

8. TRY Pack Film LTD HIT Pakistan.

9. Air Force House Scams Chaklala Rawalpindi Pakistan. Curriculum vita Muhammad Khalid QAQC Manager (ISO 9001-2015, CMQ) Contact Address: Abu Dhabi UAE Phone: +971********* Email: ad284e@r.postjobfree.com LinkedIn: https://www.linkedin.com/in/muhamma d khalid 8318b415/ 10. Dane Foods Ltd Hit Pakistan.

SCOPE: Construction of Industrial including RCC frame structure and Steel Frame Pre Engineering Building, Construction of Residential buildings, villas, swimming poles, and helicopter hangers. RESPONSIBILITIES:

Successfully implemented project cost control procedures and project monitoring to ensure quality construction and safety.

Established and implemented work schedules and adjusted them to meet project deadlines.

Ensured all site personnel used quality workmanship in accordance with plans and client needs.

Adjusted work schedules as needed to meet all project deadlines. Read blueprints and plans and communicate them to workers.

Assigned to a newly acquired subsidiary as a senior engineer to provide project management, engineering, and safety support.

Authorized and procured construction materials and was responsible for preparing daily progress reports on the attainment of materials to the Project Manager.

Managed and submitted end of month payment invoices to head office. Monitored sub contractors in the completion of daily operations to ensure project progress and optimal performance.

Adopted material optimization techniques. Encouraged construction site staff to reduce the wastage of materials on the field by explaining cost benefits. Oversaw equipment servicing to avoid malfunction and increase the efficiency of the equipment.

References: Will be provided if required



Contact this candidate