Engineer IJAZ UR REHMAN (Professional Engineer)
M.Sc. (Geotechnical/Civil Engineering,
Iqra National Univ: Hayat Abad, Peshawar)
B.Sc. (Civil Engg:, Univ: of Engg: & Tech:, Peshawar). Address: Mohallah: Doctor Abad, Village: Darbar, P.O: Chakdara, Malakand Univ: road, Distt: Dir (Lower), Khyber Pakhtunkhwa, Pakistan.
Mobile No: & WhatsApp 0092 346-***-**** & Email: ad25t6@r.postjobfree.com PERSONAL DATA:
Father’s Name: Prof. Abdul Rahman, Date of Birth: 06-04-1979, Religion: Islam, C.N.I.C No: 15000-1877261-3, Passport No: BM1512612, PEC Registration No: Civil/ 23854, Registered with Saudi Engg: Council also, Saudi Arab Railways Employee # 1542, Certified CAB ride pass for inspection/maintenance of track/sand cleaning management & Protection officer/Personal track safety & health trainings/certifications from Saudi Arab Railways, Driving license: Saudi Arabia & Islamabad, Marital status: Married. COMPUTER SKILLS: Auto Cad 2000, SAP 2000, Microsoft Office (Word, Excel, Power Point & outlook), Windows, Internet & ERP (Oracle self-service human resources). LANGUAGES: Pashto, Urdu, English and Arabic.
Driving License: Earned valid driving license from Islamabad & Saudi Arabia. Distinctions: Keeping in my hard work & Performance Evaluation report (91%) for the year 2017, 2018 & 2019, Saudi Arab Railways rewarded me with one basic pay as bonus. CGPA (3.69/4, 86%) in MSc Geotechnical Engg:/Civil Engg:, MSc Thesis & Research Paper publication. 8 years regular service/permanent posting in Pakistan Railways from 2008 to 2016, due to hard work and spotless service record, I got promotion from Assistant Executive Engineer (BPS17) to Executive Engineer(BPS18) in Pakistan Railways within 4 years.
2
Academic /Professional Qualifications:
Exams Passed
Year of
passing
M.O/T.M
& %age
Div/Grad
e
CGPA Distinction Institution
S.S.C.(Science) 1996
671/850
79%
1
st
/ A -- Science
GHS, Chakdara
Dir(L),B.I.S.E.
Swat/Malakand.
F. Sc.(Pre- Engg:) 1998
767/1100
70%
1
st
/ B --
Entry/Pre-Test Marks
%age=94
Islamia College Peshawar
B.Sc.(Civil Engg:)
1
st
year 1999
630/1100
57%
2nd --
Final year
Project(Design of self-
supported tower in SAP
& Auto Cad 2000)
Marks %age=93
Univ: of Engg: & Tech:
Peshawar.
2
nd
year 2000
753/1300
58%
2nd --
3
rd
year 2001
759/1200
63%
1
st
--
4
th
year 2002
844/1250
67.5%
1
st
--
Degree
earned
Oct 22,
2003
61% 1
st
--
M.Sc.
(Geotechnical
Engineering)(Civil
Engg:)
1
st
Semester
Fall 2012 -- 1
st
/A & B+ 3.67/4.0
CGPA=3.69/4.0
Iqra National University,
Hayat Abad, Phase II,
Peshawar, KPK Pakistan,
2
nd
Semester
Spring
2013
-- 1st / A & B+ 3.67/4.0
3rd
Semester
Fall,
2013
-- 1
st
/A & B+ 3.75/4.0
M.Sc. Thesis Title
“Identification & Characterization
of Expansive soil near Railway
station Kohat, KPK, Pakistan
2017
691/800
86%
1
st
/ A
3.69/4.0,
Degree
Earned
2017
Geo: Tech: &
Mineralogical Lab.
testing of soil samples
& Research Paper
Publication
MCE, Raisal Pur, KPK,
Geosciences Laboratories,
Islamabad & Basha
Research
corporation(BRCORP)
B.A.
(Islamic studies, English &
Law)
2001 58% 2nd / B
Degree
Earned
25/09/2001
Private
The University of
Peshawar.
Note: Transcripts/degrees/certificates/credentials of above qualifications and professional experiences certificates will be provided as and when required.
3
PROFESSIONAL EXPERIENCE:
Total 18 years experience in Railways track construction/Maintenance, Buildings, roads and bridge construction. 1) Presently working as Senior Resident Engineer(SRE) with National Engineering Solutions & Consultant (NESCON), since August 2020(till date) on Construction of FC, HQ(South), 4 Stories Buildings(30 Nos) at D.I. Khan (Chahikan), Mir Ali & Neeli Kach Projects.
Responsibilities/Duties:
Inspection & Supervision of all Structural Components as per Drawings & specifications, Concrete Pouring Supervision, to ensure quantity & quality of all structural materials & laboratory Testing. 2) Earned 3+ Years experience as Section supervisor/Manager Saudi Arab Railway(SAR) from 11-March-2017 to 20-june-2020, continuous welded track (Km200 to Km515, total 315Kms (20 Nos, 4 Stories Officers Residential Blocks Construction, 6 Stations Building & 44 turnouts (Points & Crossing)), Hateefa, Hafar Al-Batin. Responsibilities/Duties:
Layout, Reinforcement, Form work Checking/inspection of all Structural Components as per Drawings/SAR standards
& Concrete Pouring Supervision.
Protection officer/Personal Safety(Health & Safety) training & Certification to ensure workers, tools & machinery safe working. Valid card Pass to Cab ride/foot plate in loco or engines/VMT of entire track & Buildings inspection. Got certified training from New ways training Solutions (Network Rail, England) for Multi Stories Buildings construction
& Management and Oracle self service Humane Resources(ERP). To update HQ Riyadh/high ups regarding daily & monthly progress reports via E-mails.
It was a challenging & tough job but due to good performance evaluation & hard work, I succeed to renew my contract for 3 years. My family suffered for three years at Pakistan, so I decided not to renew my contract with SAR. 3) Worked as Divisional Engineer/XEN, Peshawar (BPS18) in Pakistan Railways, 23/05/2012 to 05/03/2017(4 years (Notification # 940-E/5-12-XIV, APO-V, P.R. HQ office Lahore) Responsibilities/Duties: Inspection, maintenance & Construction of service as well as residential buildings (class III & class IV Quaters) at Peshawar, Nowshehra & Raisal pur. To work as a Human Resource Manager and deal with all kind of establishment matters of all staff. Welfare and Overall control on supervisory staff as well as workers. To keep closed contact with high ups & update them of the progress as well as requirements. To prepare replies of audit, inspection notes, specific reports, draft paras and audit paras. Concrete Mix Design and Laboratory testing.. 4) Worked as Assistant Executive Engineer (BPS17) in Pakistan Railways at Attock city from 06/02/2009 to 22/05/2012(3 years)(No.940-E/7/I-IX(APO-V), 940-E/5/2-X(APO-V). Responsibilities/Duties: Inspection, maintenance & Construction of service as well as residential buildings (class III
& class IV Quaters) at Attack City, Jand & Kohat city. Responsible for establishment/Personal matters of Class III and Class IV Staff. To prepare replies of audit, inspection notes, specific reports, draft paras and audit paras. Date of Permanent Appointment as Assistant executive Engineer in Pakistan Railways through FPSC=14/06/2008(NO.265-E/36-IV (APO-VI).
4
5) Worked as Assistant Executive Engineer (client) in EEAP (Earthquake Emergency Assistance Project) & SERRA (State Earthquake Reconstruction and Rehabilitation Authority) from July 2007 to June 2008 Project: Reconstruction of multi stories Govt. Hospitals, Colleges & Schools Buildings at Rawalakot, Azad Kashmir. Duties: Layout, Reinforcement, Form work Checking/inspection of all Structural Components as per Drawings/ standards & Concrete Pouring Supervision.
Participated in Orientation Workshop about Light Weight Steel Structure in AJK, from Sep 01 to Sep 30, 2007 organized by Socio Engg: Consultants – SEC Islamabad, Earthquake Emergency Assistance Project. 6) Worked as Site Engineer with Al-Harbi Trading & Contracting Co. (K.S.A) from Feb 2005 to Mar 2007(2years) Project: Construction of 100Bed, 3- stories, Hospital Building in Al-Wajh, Tabuk, KSA. Construction of 136Kms road (Al-Wajh to Duba, 106 pipe culverts, 86 box culverts & 10 bridges). Duties and Responsibilities
Supervision & Checking Reinforcement, Formwork and Concreting of all building/box culverts & bridge components, Preparation & Programming of Interim Payment Certificate (Monthly Bills) in Microsoft Excel and to maintain the office record of above works. Earthwork, sub grade, base course, BBC, WBC layers inspection/supervision & laboratory testing.
7) Worked as Site inspector with Development Management Consultants (Pakistan) from Feb 2004 to Feb 2005(1year). Project: Construction of 7 Spans Bridge on River Panjkora (Pile Foundation) and Approach roads
(Khazana By pass) at Timergara, Dir(L).
Duties and Responsibilities
Inspection of Reinforcement & form work of all bridge components & Pre stress Girders. Supervision of all bridge concrete works, Inspection & Testing of Embankment, Sub grade, Sub base, B.B.C & W.B.C. layers of Approach Roads & to maintain complete office record of approach roads & bridge. 8) Successfully complete 5 Km design survey of Chukiatan – Barawal road, Dir (upper), KPK, Pakistan, for Frontier Highway Authority, from 10/08/2004 to 30/08/2004, including Calculation of traverse data (Co-ordinates and Elevation) of Catch Points and Center line, Plotting of N.G.L, P.G.L and detail X Sections by Auto Cad & Excel Programming, Calculate Earth Work and Structural Quantities. 9) Worked as Site inspector with Contractor Amir Muqam and Company from Aug 2003 to Feb 2004. Project: Widening and reconstruction of Timergara, Dir Road (25Km). Duties and Responsibilities
Inspection/ Supervision of Retaining walls, inspection/Testing of Reinforcement/Form works & concreting of culverts. Inspection & Testing of Embankment, Sub grade, Sub base, B.B.C & W.B.C. 10) Successfully complete a course of field surveying held by Civil Engineering Department, U.E.T, Peshawar, from 04/08/2002 to 25/08/2002 at Balakot, Abbotabad by securing 79% marks. 5