AKPAN, PAUL JACKSON CV :
MY CONTACTS
Email: p, ad21as@r.postjobfree.com,ad21as@r.postjobfree.com,
1.UIG-PWT-Asset Integrity Management System (AIMS),Shell PetroleumDevelop. Comp. Nig. Ltd,
Warri, P.O.Box-230, Delta State - Nigeria.
2.47 idama Estate,Edjeba Warri Delta State Nigeria.
Telephone: +234********** / +234**********/ +234**********
OBJECTIVE:
To move and coordinate fully into a dynamic Company and facilitate, efficient service delivery to the companies, customers and other stakeholders as a Mechanical Facilities Statutory Maintenance Inspector, to drive the business through fast and efficient maintenance services
PERSONAL DETAILS
SURNAME: Akpan
OTHER NAMES: Paul Jackson
DATE OF BIRTH: October 10, 1983
AGE: 40
GENDER: Male
STATE OF ORIGIN: Akwa Ibom
Local Govt OF ORIGIN: Ika
COMPANY:
SPDC)-Shell Petroleum Development Company And Contracting Company with
JOB TITLE:
Senior Statutory Facility Inspector (February 2012 – 2023)
EDUCATION AND CERTIFICATS AND
CERTIFICATIONS
HND- Advance Technical Diploma Mechanical Engineering- (Plant Hydraulic and Pneumatic) - London -2008
ND-National Diploma – Akanu Ibiam Federal Polytechnic, Unwana Ebony State, Mechanical Engineering Technology- 2005
(WORK TRAINING AND COMPETENCY CERTIFICATION (Profile)
ASNT- LEVEL-11 - American Society for Non-destructive Testing [Ultrasonic (UT) (2010 updated till 2023)
MPT Level 11 - Magnetic Particle Testing Certificate (2010 updated till 2023)
LPT Level -11-Liquid Penetrant certificate --(2010 updated till 2023
LEADERSHIP TRAINING SKILLS AND COMPENTENCY WITH SHELL PETROLEUM
DEV. COMPYNY CERTIFICATES
PTW AND JHA Training in (SPDC)-Shell Petroleum Development Company Limited - -26th March 2023
Worksite Hazard management -SPDC Limited - - 2023
Safeguarding Information Training-SPDC Limited - -24 March, 2023
Designated First Aider (DFT) Training certificate – SPDC Limited - - 2023
Anti-bribery and corruption training certificate – SPDC Limited - -30th April, 2023
Respect in workplace certificate – SPDC Limited - -25 March, 2023 Industry Lifesaving
LEADERSHIP TRAINING SKILLS AND COMPENTENCY WITH SHELL PETROLEUM
DEV. COMPYNY CERTIFICATES
PTW AND JHA Training in (SPDC)-Shell Petroleum Development Company Limited - -26th March 2023
Worksite Hazard management -SPDC Limited - - 2023
Safeguarding Information Training-SPDC Limited - -24 March, 2023
Designated First Aider (DFT) Training certificate – SPDC Limited - - 2023
Anti-bribery and corruption training certificate – SPDC Limited - -30th April, 2023
Respect in workplace certificate – SPDC Limited - -25 March, 2023
Industry Lifesaving Rule certificate – SPDC Limited - -26 April 2023
Code of conduct awareness – SPDC Limited - -24 March 2023
Safeguarding information – SPDC Limited - - 2023
Gas Testing Certificate- Art in science. 23 August, (2023)
Basic Offshore Safety Induction and Emergency Training (BOSIET) certificate
PTW/JHA Training certificate—2ed April,26th February,2023
WORKING EXPERIENCE ON TANKS INSPECTION ROLES
5-Yearly petrol storage tank inspection
(Continuous Dehydration Tanks, Skimming Tanks, Crude Storage Tanks,
Diesel Tanks at 21.9m,17m, &12.5m height.
Carryout one monthly Tank inspection with complete
checklist (R1 to produce R2)
Carryout 3 monthly Tank Shell Inspection Using DFT
(dry film Thickness with ELcometer211) Roof plates
Carryout one monthly Tank inspection with complete checklist (R1 to produce R2)
Annular Ring (TA-LRUT angled & B-Scan UT)
Bottom Plates & Appurtenance (UT, MFL and Pit Gauge where applicable)
Roof Plates & Appurtenances
Roof Plates (Roof crown or compression bars)
Check Deluge/Foam piping in condition
Roof Shell plates/Courses (B-Scan UT)
Plates (Roof crown or compression bars)
Bottom Plates & Appurtenance (UT, MFL and Pit Gauge where applicable)
Annular plates
Check roof plates Paint coating /Corrosion condition.
Inspect all tanks nozzle flanges, bolts/Nuts.
Inspect manifold piping flanges and leaking.
Internal piping
Central Drum Section
Stilling well/ Guides
Shell plates Check the area of bottom enraff
Clean off the bottom weld and inspect for corrosion and thinning.
Inspect associated pipe supports bellows, and hangers.
Inspect Tank pad shoulder and bund for deterioration and washout.
Internal piping (reachable from floor and the remaining to be carried out using scaffold when the Contractor mobilizes to site and set up the scaffolds)
Carryout 5 yearly(60monthly) That is Large Surface inspection on Tank shell with mitigation.
Check condition of breather vent Mesh
TALRUT –Tank Annular Plate Long Range Test UT
Carryout Pontoon UT checks
Carryout valve check at the center Pontoon including Stiffener boxes
Reporting Of Tank jobs with Job execution Feedback form
Reporting Of Tank Jobs with computer SAB system and SAP notification In SHELL system
Use of UA/UC form to report other faults on Tanks appurtenances
Complete Reporting To management at any possible findings and solution to all
WORKINGEXPERIENCE ON PIPING ROLES
working on conventional UT and LRUT
Select, calibrate & operate equipment used in the non-destructive testing (NDT) Equipment available for use.
Interpret or evaluate test results in accordance with applicable standards.
Interpret the results of all methods of non-destructive testing (NDT) such as radiography, liquid penetrant, magnetic particle, and visual testing.
Monitor and report Quality Assurance and Quality Control aspects of required work scope package(s).
Control and ensure the accuracy of all project quality documentation related to projects
Work closely with departmental leader, production staff and Make recommendations for corrective actions, continually identifying areas of improvement.
Examine welds, and castings using non-destructive testing (NDT) techniques.
Prepare reports on non-destructive testing (NDT) dater sheets.
Conduct radiography and liquid penetrant tests to locate surface cracks Document non-destructive testing (NDT) methods, processes, or results.
Visually examine materials, structures, or components using tools and equipment for signs of corrosion.
Interpretation of Piping Engineering Drawings
Carryout Complete Corrosion inspection management systems (CIMS UT)
Ultrasonic Wall thickness Testing (UT) Inspection in FLOW STATIONS & TERMINALS
Process Piping Inspection
Utility piping Inspection
Top side inspection
Tank Inspection (IN-SERVICE INSPECTION and OUT OF SERVICE INSPECTION)
Bund-wall Inspection
Vent Stack inspection
Flare Stack Inspection
Structural Inspection
Civil/steel structure integrity inspection
Data Imputation and uploading
Inspecting pipelines for leaks, corrosion, cracks, or other defects that could lead to failure.
Documenting inspection results in writing or through photographs or video recordings
Documenting inspection results in writing or through photographs or video recordings
Performing tests to determine the chemical makeup of materials found in the pipes.
Inspecting the interior of pipes for damage such as dents pin hold or corrosion Recording data about the condition of the pipelines at the beginning and end of each shift
Inspecting equipment used to manufacture or store pipes such as pipe mills, pipe fabrication shops, and pipe yards.
Maintaining records of all inspections performed on the lines and equipment over their entire shift.
Reporting any problems, they find to supervisors so they can be addressed.
carryout data imputation that will be use for DATA EVALUATION and ANALYSIS which will be use know the ALARM STATE (normal alarm state, Warning state, Pure alarm state, and Critical state)
FOR VISUAL INSPECTION
ROLRS
FOR VISUAL INSPECTION
Check for label/tag with ID.
Checking deteriorating material
Checking blistering
Checking supporting point or fixtures
Checking for coating or painting failures or deterioration
Checking for area of scales
Checking for pitting and rust
Checking for corrosion between flanges
Check for flange bolt and nuts corrosions.
Check for physical damage or penetration.
Check for weather seal damages.
Check for building or instrument.
Check for missing jacket plugs or instrument.
Check spring hangers bottomed out.
Check for corrosion supports.
Check for leaking valves.
VALVE INSPECTION ROLES
Using Ultra-probe, and others Equipment
Test for close valves,
Test for Open valve
Check valve leakages.
Total number of valves available
Total number of valves tested (close position),
Total number of valves not tested (open position, Total number of valves passing
.Prepare the complete header that needs to be tested
. Ensure the Permission / Approval for shut down.
Preliminary visual inspection. Prepare the complete header that needs to be tested
4 Check the tightness of the bolts (body and flange
check for name plate
check for tag no on the valve.
check for any leaks from the flange.
8.check for any leaks at the valve handle
9.open the drain valve - downstream for ball vale or downstream for check valve
check for tag no on the valve.
.heck for any leaks from the flange
check for any leaks at the valve handle.
Check for body leaks.
check external coating.
check for any cracks on the valve check for any cracks- nuts and bolts
. check the valve actuation performance.
BUNDWALL INTEGRITY INSPECTION CHECKS:
Carryout gas test and continuous monitoring
Hold tool box talk/Re-energize 9 IOGP LSRs
Inspect Tank Bund area for oil contamination
Inspect Excess vegetative growth.
Inspect area of asphalt washout and excessive cracks
Inspect debris clogging the drain channels.
Check Bund drain channel outlet cleared and valve opened
Inspect bund drain valves
Inspect tank pad shoulder and for deterioration and washout
Inspect the area for build-up of trash, vegetation etc
check site for drainage away from the Tank
Bund wall containment ability,
walkway paint condition, walkway surface condition,
Flare bund wall condition,
Bush at the surroundings,
Flare stack condition,
Bund area having sand or any other material.
ACCOMMODATION TECHNICAL INTEGRITY
ROLES
- ACCOMMODATION TECHNICAL INTEGRITY INSPECTION
Check the surrounding environment of accommodation,
check on the drainage system, check on for cracks on the walls deformations
Concrete or metal structures,
check on flooring work,
check inspection chamber and septic tank,
inspect electrical fittings,
Inspect furniture and fixtures,
check painting works,
CORROSIO COUPON/CORROSION PROBE ROLES
CORROSIO COUPON / CORROSION PROBE
Corrosion probes are designed to be permanently installed within the system and provide continuous monitoring of corrosion rates.
1.Corrosion probes allow rapid detection and counter measures.
2.Corrosion coupons allow post exposure period visual identification of the metal surface.
3.Check if the probe is covered on the top of the Probe/coupon.
4.Check if the probe/coupon has any corrosion.
5.Check if the threat has entered well or out position.
LIGAMENT VALVE TEST ROLE
[I] LIGAMENT VALVE TEST-[INSPECTION]-
(i)Using Ultra-probe, and others Equipment
Test for close valves,
Test for Open valve
Check valve leakages.
Total number of valves available
Total number of valves tested (close position),
Total number of valves not tested (open position, Total number of valves passing
Type all the result of what you have capture as a report.
HELIPAD/HELIDECK INTEGRITY ROLES
HELIPAD/HELIDECK INTEGRITY INSPECTION CHECKS:
These are what we check for: Condition of landing path,
temporary landing helipad helideck,
surface condition, wind direction indicator condition
warning notice, firefighting equipment,
Corrosion on the metal surface.
fire extinguisher, entrance gate condition,
cage fence and fenders condition, lighting condition in the landing area,
drainage system condition, paint work condition on the helipad/helideck,
communication equipment
IMPLEMENTATION OF THE 12 LIFE SAVING RULES AND 3 HSE GOLDEN RULES
IMPLEMENTATION OF THE 12 LIFE SAVING RULES AND 3 HSE GOLDEN RULES
- Participate and Implement precaution in permit to work [P.T.W]
- Participate and Implement job hazard analysis [JHA]
- Conduct gas testing to verify work safety and work evacuation during work execution as gas tester certify candidate.
- Attend all schedule HSE meetings at site and in office.
- Raise non-compliance note to poor performance and also recommend recovery measure and closeout.
- Serve as a positive role model with respect to safety, protecting the environment, positive behaviors in the SPDC [Shell] Way.
- Promotes safety awareness and safe behaviors within the Process & Control Engineering work group through participation in programs.
Promote and ensure compliance with regulations and procedures.
Promote a culture through behavioral based safety and raise the standards of ‘Hazard Awareness
Ensure maintenance activities are conducted in accordance with procedures
NUMBERS OF STATIONS WORKED IN SHELL
NUMBERS OF STATIONS WORKED IN SHELL
1.FORCADOS TERMINAL
2.CRUDE LOADING PLAT FORM[CLP] (HIGH SEA)
3.AFREMO A & B (HIGH SEA)
4.ESTUARY FLOW STATION (HIGH SEA)
5.FORCADOS TERMINAL
6.UTOROGU FLOW STATION / GAS STATION
7.YOKRI FLOW STATION
8.NORTH BANK FLOW STATION
9.ERIEMU FLOW STATION
10.TUNU FLOW STATION
11.SOUTH BANK STATION
12.BENISEDE FLOW STATION
13.SAPELE FLOW STAT
PERSONAL CHARACTERS AND ROLES
PERSONAL CHARACTERS:
Discipline to the core.
Possess leadership character and qualities
Determination to duties as to achieve the aiming goals.
Dedicated to works.
I do not work to produce learning from incidence(LFI) in my operations but always
Learned from incidence-(LFI)s.
I do accept challenges as that will take me to next level
Flexible to accept corrections.
Willing to accept bad news if any for proper examination and corrections.
Provide leadership and develop the skills and competency of the all maintenance team
Ability to monitor the client’s Quality Control System Manual and document results of same.
Possess good oral and written communication skills.
Possess good analytical and problem-solving ability.
Possess computer skills necessary to communicate and transfer data electronically.
Be able to travel, as requested by the company.
HOBBIES: Football, Swimming Reading Of newspapers & Researching
Current Affairs, Social Activity, Organizing and Participation
REFEREES:
1.Engr. Robinson Iniobong, +234**********)
Team Lead, Mechanical Maintenance Workshop
Shell Petroleum Development Company Nigeria limited
2. Patient Egbe - ( +234**********)
Planner Scheduler-Supervisor, Forcados Terminal Shell Petroleum Dev. Company Nigeria Limited Warri. Delta State.
3 Engr. Patrick Nathan – Field Supervisor Mechanical FOT +234**********)