Post Job Free

Resume

Sign in

Engineer Electrical Associate

Location:
Islamabad, Islamabad Capital Territory, Pakistan
Salary:
150000
Posted:
January 22, 2024

Contact this candidate

Resume:

MIRZA ALLAH DITTA

Electrical Engineer Career ** Years of

experience

CONTACT

Address:

HOUSE NO G-161 LEFT BANK MANGLA

WAPDA COLONEY MANGLA DAM 10200

Phone: +923*********

WhatsApp+923*********

Email:

ad20n2@r.postjobfree.com

EDUCATION

Degree Name

Associate Engineering Electrical

Level Attained Diploma

Session MAR 1996

Institute

Govt. College of Technology Karachi

Pakistan

Address

Karachi Pakistan

Degree Name Metric

Level Attained

Matriculation - O Levels

Session 1991

Institute

Govt High School

Address

Mangle Dam Pakistan

OBJECTIVE

A dedicated and enthusiastic individual with a logical and analytical mind. Successfully completed various engineering assignments of design, erection, and commissioning. Enjoys being part of a successful and productive team and thrives in highly pressurized and challenging work.

CAREER SUMMARY

I have had many years of experience managing the Electrical installation of HV Switchgear

/ MV Motor Control Centre and LV instrumentation Construction and, Maintenance, Projects. Monitor daily weekly /Monthly progress Generate daily /weekly/Monthly Activity Reports Project Specifications Attend Daily Meetings and Coordinate with other Disciplines. Installation of high and low voltage power, controls, MCC, motor starters and plant electrical distribution system cables routing, support system, laying, gladding and termination, heat tracing, punch listing, testing, and inspection. Pre-commissioning of electrical items such as: power and control cables, cable trays, wiring, lighting, motors, relay/ limit switches, switchgear, control panels, Coordination with the Site Manager/the persons in charge of disciplines and inspectors QC for the inspections and the tests.

To ensure that work is completed according to the plans and estimate of the Project. Control and followed performance of the subcontractors with the requirements quality.

To ensure that work is completed safely. To ensure that work is completed inside the deadlines and of the budget, without generating the additional costs. WORK EXPERIENCE

Kohistan Enclave Wah Cantt

Kohistan Builders& Developers Rawalpindi Cantt

Project Engineer Electrical Maintenance In charge

(MEP Department)

01-10-2022 to Till Now

Development Works of 11kV Underground Distribution System (RMU and Transformers) Development Works of LT Feeder (Distribution Boxes) Development Works of Street Light Supervising all subcontractor work to ensure compliance with client’s requirements Ensuring project completion while keeping in view the financial constraints and within due time Overall supervision of Underground Electrical transmission and distribution system, including cable termination, internal and external electrification, HT and LT side termination worked in the Operation and maintenance department for all types of Complaints Maintaining all standards for safety and quality control of the current project.

Coca-Cola Beverages Pakistan Ltd

Trade Tact’s International (Pvt) Ltd

Project Engineer Electrical 02-01-2022 to18-8-2022 Syrup Room &CIP Room Installation TMCI

Attending Internal Meetings with Sr. Project Manager and department Heads, for Technical, Progress & and safety issues.

Review and Approval of Materials, Shop Drawings, Project Planning, and Weekly and Monthly Progress Reports.

Monitoring the overall progress of the Project and sending progress reports to the H.O. for their review & and reference.

Fabrication & and installation of Mesh Tray, Cable Laying Power/Control Instruments. Cable Termination Power, Control instruments. Air pipe Laying and termination.

Instruments Installation. Control valve, pressure transmitter. Level transmitter. Temperature sensor.

Commissioning Syrup Room & Cip Room with TMCI Team. PROJECTS&JOB EXPERIENCE

17Years Electrical Installation Testing

Commissioning & Maintenance

Thermal Power Plant (365x2 MW)

Ghazi Brotha Hydro Power Project

1450 MW

Steam turbine power plant

Saudi Arabia (65x2 MW)

Diesel Generator power plant (124 MW)

Oil Refinery PARCO

Royal Embassy Building construction

Ghani Flot Glass

Nestle Milk pack Ltd

KING ABDULLAH TEACHING

HOSPITAL

U.S.A CONSULATE EMERGENCY P O

D HOUSING PROJECT

COLGATE- PALMOLIVE (PAKISTAN) LTD

Detergent powder Plant

Sunder Industrial Estate Lahore Pakistan

SYSTEM INSTALLERS (PVT) LTD Project Engineer Electrical 18-12-2020 to 30-12-2021

In-charge for overseeing all Electrical works on the site. Review consultant’s design and specification

Solar panel 375w 32pices, H6TPV Combiner,192v/100A Solar Controller, TF15kwsolar Inviter, 200AH Battery 24 no’s,

Prepare shop drawing & material submittals for consultant’s approval. Verify the accuracy of shop drawings and their compliance to the specification, consultant’s design and existing local authority standard. Ensure the Electrical work carried out is as per approved shop drawing and within the time frame and progress of the construction program. Ensure that the installation, inspection and testing of all the Electrical equipment, fittings and work implemented meets the specification and the consultant requirements Supervise and approve construction activities and inspection of materials and drawings. Monitoring of daily work progress, quality of work as per specifications” and maintain Progress Report.

Ladder /Perforate cable Tray Fabrication and Installation. Installation lineament &coupling Main & MCC Panels. Cable Laying Power and control and Instruments, Cab Termination. Building Electrification.InstallationTransformer3000KVA Installation HT panel.HT cable Laying and Termination. Installation Fire alarm System Installation.

MS/PVC conduit pipe Installation.

NESTLE MILK PAK LTD SKPF PAKISTAN

SYSTEM INSTALLER (PVT) LTD Project Engineer E&A

31/09/2016 to 17-12-2020

.

Plan and estimate electrical jobs. Advice coordinator and assistant Nestle person of technical problems concerned with installation, modification and repair of electrical assignments.

Ensure that works is completed according to plans and specifications for the project. Ensure that work is completed within time and on budget, without incurring additional costs.

Plan for material requirement as per our requirement, Discus with the client & Architect to Executive the work, run the site as per client schedule, As a Quality Controller, planning for Executive the work. Supervise Installation V W line E2 Packing Hall including Mesh installation, Cable Laing power, and control instrument& cable termination panel installation. Installation AHU Hygiene Sinteco 3star & 2star .Installation CCTV System Supervise NCC project E1&E2 Packing Hall. &3rd dry mix Project E2 PROJECT

EMERGENCY P O D HOUSING PROJECT U.S.A CONSULATE PESHAWAR PAKISTAN

CLIENT

U.S.A CONSULATE

CONSULTANTS

ARKEL international Constriction Services

ECHO West International Electrical Site Engineer

01/9/2014 to 30/06/2016

Installation HP panel & MDP

Fire Alarm System

TSS System

Cable Laying& cable Termination

Lighting System

Lightning Protection System

PERSONAL INFORMATION

Passport No

AC7493693

Date of Expiry

24 AUG 2024

Main Nationality

Pakistan

Marital Status

Married

Languages

English Read, write and speak fluently

Primary Language

Urdu

Driving License

KSA Expiry 2020

Work Locations

Pakistan

Are you willing to move or relocate?

Yes - I will travel internationally

Availability

Start Immediately?

Available Now

Generator 1000KVA Installation

Fire Pump Installation

Conduit Fabrication & Installation EMT,RGS

Heat tracing system Installation

PROJECT

KING ABDULLAH TEACHING HOSPITAL MANSEHRA (K, P.K)

CLIENT

EARTHQUAKE RECONSTRUCTION &REHABILTATION AUTHORITY (ERRA) CONSULTANTS

PAKISTAN ENVIROMENTAL PLANNING&ARCHTECTURAL CONSULTANTSLTS. (PEPAC) ECHO West International Electrical Site Engineer

10/10/2011 to 30-08-2014

Attending Technical and Progress Meetings & having Correspond with Client and Contractors for site related issues.

Attending Internal Meetings with Sr. Project Manager & Department Heads, for Technical, Progress & safety issues.

Review and Approval of Materials, Shop Drawings, Project Planning, Weekly and Monthly Progress Reports.

Approval of Specialized Sub-Contractors & Suppliers & having meeting with them, for any technical clarification.

Applying and developing Tailored Technical Solutions to the Client and attending Meeting with the Client and Quantity Surveyor, for any modifications or Value Engineering & instructing the Contractor to prepare new B.O.Q.

Further, review & approval of Materials & Drawings, as per modifications & instructing the Contractors to proceed.

Inspecting the Materials, those are delivered at Site, for Country of Origin, Quality & Specification requirements.

Interfacing & coordinating with Electrical Engineers, along with multi-disciplinary team (Structural, Civil, Architectural, Mechanical, Plumbing) & taking care of all system, procedures & safety issues, during various stages.

Review and Approval of the Monthly Invoice, Method Statements, Testing & Commissioning Formats and Reports.

Monitoring the overall progress of the Project and sending progress reports to the H.O. for their review & reference.

JUBA Power Plant KSA

Al-Toukhi Company Electrical Site Engineer

20/9/2008 to 04/08/2011

GT11/12. 2/60MW Kingdom of Saudi Arabia

Installation Testing Commissioning

Wadi AL-Dowser power plant as electrical site Engineer. Responsible for the Construction &commissioning & start up for the:-Gas Turbine generator (2*6o M.W) from G.E USA.

Installation & interface and Commissioning of, GALC, GNAC, GCB, limit Amp and EX2100 Model “7EA” for Gas Turbine Generator (GTG) as Manufactured of General Electric (GE), USA along with required Auxiliaries for safe and continuous operation of the power plant. Closed Cooling Water System. Auxiliary Transformer from WESCOSA (13.8kv/ 4.16 KV & 13.8kv/480v).Switch gear 13.8 KV & 4.16 KV & 480 v from Schneider Company.

High voltage transformer 13.8kv / 132kv from GANZ Hungary. Extension 132 KV GIS in S/S No 8780 (Juba) from KONCAR Croatia. Extension 33kv switch gear from PACS USA.Crude Oil system Crude oil Forwarding pump skid (west fallia)Distillate Forwarding pump skid (west fallia) Fuel Management Installation of 500kV and 132kV GIS Switchgears

Installation of equipments, Panels and cables.. Termination, testing and pre commissioning of control, AC, DC, and local Panels.

Installation of conventional grids and 11 KV feeders. Erecting of Transformer up AREA OF SPECIALIZATION

Project Management/Site Project

Engineer /Electrical Engineer Building

Construction, Electrical Testing

commissioning Supervisor. Electrical

Maintenance.

INDUSTRY TYPE

Power generation, Oil Refinery,

Building Construction, Glass

Industry. Food Industry,

COMPUTER SKILL

Word, Excel, Access, Internet and

Email

to 250 MV installation and testing of lighting, Power, Fire Fighting and earthling system of Building and Plants. Installation and testing of control, power and HV cables.

Nestle Milk pack Ltd SKPF

System Installer Company Electrical Site Engineer

03/7/2006 To18/9/2008

Supervise, direct and control the activities of assigned personnel in the Electrical Construction.

Perform Supervisory functions at the unit level as established by Management.

Review Electrical Project package drawings / Designs before progress meetings, provide technical advice and recommend modifications as necessary.

Supervise construction and commissioning activities at the site, Participate in checking detailed drawings and other documentation.

Supervise and approve construction activities and inspection of materials and drawings. Monitoring of daily work progress, quality of work as per specifications” and maintain Progress Report. Yogurt plant project Electrical & instrument installation testing and pre commissioning complete plant

Supervise Maintenance Activity UHT, Tetra Hall, PLE, Utility Area, NDC, Cereal Plant Argon plant & Warehouse.

KNPC Kuwait Project

Kuwait Control Company (KCC) QA/QC inspector Electrical 13/9/2005To 22/06/2006

Responsible for project operational safety requirement. QA/QC documentation and review contractor installation procedures. Implement & enforce all company policies, procedures and practices. Planning construction electrical and Instrumentation schedule.

Monitor construction activities and progress. Witness and monitor electrical and Instrumentation equipment testing. Responsible for test packages documentation from pre-commissioning to final hand over to client.

Manage the Electrical Contactors daily construction activities, schedule and progress.QA/QC documentation and specification and verify contractor procedures.

Generate Field Change Request (FCR), Field Purchase Request (FPR) and Request for Information (RFI). Inspect and approve Electrical Installation on site. Witness and verify Continuity Merger, HI-POT and component testing for medium voltage & Low voltage equipment. Inspection of Connection and Installation switch gear and MCC panel.

Ghani Flot Glass (Pvt) ltd

System Installer Company Electrical Site Engineer

12/1/2005To08/09/2005

Supervision of Switchgear and Switchboards Installation including cable pulling Glanding and termination Coordinate with Engineering Regarding Drawings and as built drawing Supervise continuity check and Maggear check of cables spools and Inspection of cable Trays and supports.

Battery charge and Discharge Test Earth loop impedance Testing Power up24v control circuit and function test the switchgear power up LV switchgear via Tempers power Generate and perform Load TestinDie-Electric Test and Hi – Potential Test of MV Transformers-pot of High voltage power cables and Maggering of Low voltage power cables and control cables Bus Duct Test of Bus bar Connection.

Royal Embassy Saudi Arabia

ECHO West International Electrical Site Engineer

25 /1/2003 To10/01 /2005

Supervision of Switchgear and Switchboards Installation including cable pulling Gladding and termination Coordinate with Engineering Regarding Drawings and as built drawing Supervise continuity check and Maggear check of cables spools and Inspection of cable Trays and supports.

Lighting System Complete Building. Fire Alarm System. Lightning Protection System. Public Address System.

Telephone System. Close Circuit TV System. Inter Net System. Earthling System. Cable Tray Installation and Cable lying. Medium voltage Substation 13.8kv /480 v Installation and Commissioning Installation Substation Transformer WESCOSA 13.8KV/480VInstallation U P S System Ghazi Brotha Hydro Power Project 1450 MW

Flowtronix (Pvt) Ltd Electrical Site Engineer

23/03/2001 to 20/01/2003

With Toshiba Mitsubishi Japan

.

Supervising Installation NGR and Hipot Testing 21kv, Assembly of stator 290MW at site before Installation bus bar Hipot Test 33kv and Hipot Testing Stator 57kv.

Installation Excitation System, Installation VTS Panel and Hipot Test22kv, Assembly of Rotor at site and Heightens test of rotor and Assembly of Pole and Voltage Drupe Test.

Firefighting System Installation Turbine Site, Installation Panel And Cable Termite Installation Cable Trays, vibration system Installation Check & review as-built drawing & O&M manual Design & Review of various electrical drawings and documents for construction/ modification .• Develop and prepare single line, Relaying and metering diagrams, lightening layouts, Anoud Power Generation LTD

Flowtronix Pvt Ltd

Generator 5.96MWx4 Sets Electrical Site Engineer

29 /8/2000 to 16 /08/ 2001

Supervised, installation MV Substation, LV Substation, Transformer.

Cable Tray fabrication & Installation.

Cable Laying HV, MV, LV, Control, Instrument& Cable termite.

Earthling System & lightening protection System Installation.

Firefighting system Installation.

Lighting System Installation.

Mid Country Refinery PARCO

Descon Engineering (Pvt) Ltd Electrical Supervisor 06/8/ 1999 to 24/4/2000

Supervising Installation, Testing and Commissioning of Switch Gears, MCC, Control Stations, Marshalling Cabinets, Transformers, Bus-Ducts, etc.

Supervising the works for, Testing, Commissioning and trial operation for the entire Plant. Monitoring installation, inspection and test of both: Impressed Current C.P. System, Earthling System. Fire and Alarm systems, Close Circuit Television and control systems, SCADA system.

Installation of supports, cable trays, conduits etc. Cable laying through trays, ducts and conduits, Glanding termination works. Commissioning work on Generators, Transformers, Motors and the Work includes Construction oil Refinery, Presentation of completed work for Third Party inspection. Updating and Maintaining records for progress monitoring. Implementing Company Policy for maintaining High level of HSE Standards.

Monitoring the Works done by Sub-Contractors and Maintaining Quality and Progress. Daily Planning and Execution of Electrical. Installation Testing and commissioning of Switchgears, Transformers, Motor Control Stations. A.E.S Lal Pir Thermal Power Plant (2x365MW

Descon Engineering (Pvt) Ltd Electrical Lead Man

04/6/1997 to 14/2/1998

Supervising Installation, Testing and Commissioning of Switch Gears, MCC, Control Stations, Marshalling Cabinets, Transformers, Bus-Ducts, etc.

Fire systems, Close Circuit Television and control systems, SCADA system and controls using PLC and genius/ profile-bus/ optical fiber systems.

Installation of supports, cable trays, conduits etc. Cable laying through trays, ducts and conduits, Gladding and termination works.

Commissioning work on Generators, Transformers, and Motors and their controllers/starters, switchgears, testing and calibration of breakers, setting of protection devices, like over current, under voltage relays, UPS system and battery charging equipments, lighting systems.



Contact this candidate