MIRZA ALLAH DITTA
Electrical Engineer Career ** Years of
experience
CONTACT
Address:
HOUSE NO G-161 LEFT BANK MANGLA
WAPDA COLONEY MANGLA DAM 10200
Phone: +923*********
WhatsApp+923*********
Email:
ad20n2@r.postjobfree.com
EDUCATION
Degree Name
Associate Engineering Electrical
Level Attained Diploma
Session MAR 1996
Institute
Govt. College of Technology Karachi
Pakistan
Address
Karachi Pakistan
Degree Name Metric
Level Attained
Matriculation - O Levels
Session 1991
Institute
Govt High School
Address
Mangle Dam Pakistan
OBJECTIVE
A dedicated and enthusiastic individual with a logical and analytical mind. Successfully completed various engineering assignments of design, erection, and commissioning. Enjoys being part of a successful and productive team and thrives in highly pressurized and challenging work.
CAREER SUMMARY
I have had many years of experience managing the Electrical installation of HV Switchgear
/ MV Motor Control Centre and LV instrumentation Construction and, Maintenance, Projects. Monitor daily weekly /Monthly progress Generate daily /weekly/Monthly Activity Reports Project Specifications Attend Daily Meetings and Coordinate with other Disciplines. Installation of high and low voltage power, controls, MCC, motor starters and plant electrical distribution system cables routing, support system, laying, gladding and termination, heat tracing, punch listing, testing, and inspection. Pre-commissioning of electrical items such as: power and control cables, cable trays, wiring, lighting, motors, relay/ limit switches, switchgear, control panels, Coordination with the Site Manager/the persons in charge of disciplines and inspectors QC for the inspections and the tests.
To ensure that work is completed according to the plans and estimate of the Project. Control and followed performance of the subcontractors with the requirements quality.
To ensure that work is completed safely. To ensure that work is completed inside the deadlines and of the budget, without generating the additional costs. WORK EXPERIENCE
Kohistan Enclave Wah Cantt
Kohistan Builders& Developers Rawalpindi Cantt
Project Engineer Electrical Maintenance In charge
(MEP Department)
01-10-2022 to Till Now
Development Works of 11kV Underground Distribution System (RMU and Transformers) Development Works of LT Feeder (Distribution Boxes) Development Works of Street Light Supervising all subcontractor work to ensure compliance with client’s requirements Ensuring project completion while keeping in view the financial constraints and within due time Overall supervision of Underground Electrical transmission and distribution system, including cable termination, internal and external electrification, HT and LT side termination worked in the Operation and maintenance department for all types of Complaints Maintaining all standards for safety and quality control of the current project.
Coca-Cola Beverages Pakistan Ltd
Trade Tact’s International (Pvt) Ltd
Project Engineer Electrical 02-01-2022 to18-8-2022 Syrup Room &CIP Room Installation TMCI
Attending Internal Meetings with Sr. Project Manager and department Heads, for Technical, Progress & and safety issues.
Review and Approval of Materials, Shop Drawings, Project Planning, and Weekly and Monthly Progress Reports.
Monitoring the overall progress of the Project and sending progress reports to the H.O. for their review & and reference.
Fabrication & and installation of Mesh Tray, Cable Laying Power/Control Instruments. Cable Termination Power, Control instruments. Air pipe Laying and termination.
Instruments Installation. Control valve, pressure transmitter. Level transmitter. Temperature sensor.
Commissioning Syrup Room & Cip Room with TMCI Team. PROJECTS&JOB EXPERIENCE
17Years Electrical Installation Testing
Commissioning & Maintenance
Thermal Power Plant (365x2 MW)
Ghazi Brotha Hydro Power Project
1450 MW
Steam turbine power plant
Saudi Arabia (65x2 MW)
Diesel Generator power plant (124 MW)
Oil Refinery PARCO
Royal Embassy Building construction
Ghani Flot Glass
Nestle Milk pack Ltd
KING ABDULLAH TEACHING
HOSPITAL
U.S.A CONSULATE EMERGENCY P O
D HOUSING PROJECT
COLGATE- PALMOLIVE (PAKISTAN) LTD
Detergent powder Plant
Sunder Industrial Estate Lahore Pakistan
SYSTEM INSTALLERS (PVT) LTD Project Engineer Electrical 18-12-2020 to 30-12-2021
In-charge for overseeing all Electrical works on the site. Review consultant’s design and specification
Solar panel 375w 32pices, H6TPV Combiner,192v/100A Solar Controller, TF15kwsolar Inviter, 200AH Battery 24 no’s,
Prepare shop drawing & material submittals for consultant’s approval. Verify the accuracy of shop drawings and their compliance to the specification, consultant’s design and existing local authority standard. Ensure the Electrical work carried out is as per approved shop drawing and within the time frame and progress of the construction program. Ensure that the installation, inspection and testing of all the Electrical equipment, fittings and work implemented meets the specification and the consultant requirements Supervise and approve construction activities and inspection of materials and drawings. Monitoring of daily work progress, quality of work as per specifications” and maintain Progress Report.
Ladder /Perforate cable Tray Fabrication and Installation. Installation lineament &coupling Main & MCC Panels. Cable Laying Power and control and Instruments, Cab Termination. Building Electrification.InstallationTransformer3000KVA Installation HT panel.HT cable Laying and Termination. Installation Fire alarm System Installation.
MS/PVC conduit pipe Installation.
NESTLE MILK PAK LTD SKPF PAKISTAN
SYSTEM INSTALLER (PVT) LTD Project Engineer E&A
31/09/2016 to 17-12-2020
.
Plan and estimate electrical jobs. Advice coordinator and assistant Nestle person of technical problems concerned with installation, modification and repair of electrical assignments.
Ensure that works is completed according to plans and specifications for the project. Ensure that work is completed within time and on budget, without incurring additional costs.
Plan for material requirement as per our requirement, Discus with the client & Architect to Executive the work, run the site as per client schedule, As a Quality Controller, planning for Executive the work. Supervise Installation V W line E2 Packing Hall including Mesh installation, Cable Laing power, and control instrument& cable termination panel installation. Installation AHU Hygiene Sinteco 3star & 2star .Installation CCTV System Supervise NCC project E1&E2 Packing Hall. &3rd dry mix Project E2 PROJECT
EMERGENCY P O D HOUSING PROJECT U.S.A CONSULATE PESHAWAR PAKISTAN
CLIENT
U.S.A CONSULATE
CONSULTANTS
ARKEL international Constriction Services
ECHO West International Electrical Site Engineer
01/9/2014 to 30/06/2016
Installation HP panel & MDP
Fire Alarm System
TSS System
Cable Laying& cable Termination
Lighting System
Lightning Protection System
PERSONAL INFORMATION
Passport No
AC7493693
Date of Expiry
24 AUG 2024
Main Nationality
Pakistan
Marital Status
Married
Languages
English Read, write and speak fluently
Primary Language
Urdu
Driving License
KSA Expiry 2020
Work Locations
Pakistan
Are you willing to move or relocate?
Yes - I will travel internationally
Availability
Start Immediately?
Available Now
Generator 1000KVA Installation
Fire Pump Installation
Conduit Fabrication & Installation EMT,RGS
Heat tracing system Installation
PROJECT
KING ABDULLAH TEACHING HOSPITAL MANSEHRA (K, P.K)
CLIENT
EARTHQUAKE RECONSTRUCTION &REHABILTATION AUTHORITY (ERRA) CONSULTANTS
PAKISTAN ENVIROMENTAL PLANNING&ARCHTECTURAL CONSULTANTSLTS. (PEPAC) ECHO West International Electrical Site Engineer
10/10/2011 to 30-08-2014
Attending Technical and Progress Meetings & having Correspond with Client and Contractors for site related issues.
Attending Internal Meetings with Sr. Project Manager & Department Heads, for Technical, Progress & safety issues.
Review and Approval of Materials, Shop Drawings, Project Planning, Weekly and Monthly Progress Reports.
Approval of Specialized Sub-Contractors & Suppliers & having meeting with them, for any technical clarification.
Applying and developing Tailored Technical Solutions to the Client and attending Meeting with the Client and Quantity Surveyor, for any modifications or Value Engineering & instructing the Contractor to prepare new B.O.Q.
Further, review & approval of Materials & Drawings, as per modifications & instructing the Contractors to proceed.
Inspecting the Materials, those are delivered at Site, for Country of Origin, Quality & Specification requirements.
Interfacing & coordinating with Electrical Engineers, along with multi-disciplinary team (Structural, Civil, Architectural, Mechanical, Plumbing) & taking care of all system, procedures & safety issues, during various stages.
Review and Approval of the Monthly Invoice, Method Statements, Testing & Commissioning Formats and Reports.
Monitoring the overall progress of the Project and sending progress reports to the H.O. for their review & reference.
JUBA Power Plant KSA
Al-Toukhi Company Electrical Site Engineer
20/9/2008 to 04/08/2011
GT11/12. 2/60MW Kingdom of Saudi Arabia
Installation Testing Commissioning
Wadi AL-Dowser power plant as electrical site Engineer. Responsible for the Construction &commissioning & start up for the:-Gas Turbine generator (2*6o M.W) from G.E USA.
Installation & interface and Commissioning of, GALC, GNAC, GCB, limit Amp and EX2100 Model “7EA” for Gas Turbine Generator (GTG) as Manufactured of General Electric (GE), USA along with required Auxiliaries for safe and continuous operation of the power plant. Closed Cooling Water System. Auxiliary Transformer from WESCOSA (13.8kv/ 4.16 KV & 13.8kv/480v).Switch gear 13.8 KV & 4.16 KV & 480 v from Schneider Company.
High voltage transformer 13.8kv / 132kv from GANZ Hungary. Extension 132 KV GIS in S/S No 8780 (Juba) from KONCAR Croatia. Extension 33kv switch gear from PACS USA.Crude Oil system Crude oil Forwarding pump skid (west fallia)Distillate Forwarding pump skid (west fallia) Fuel Management Installation of 500kV and 132kV GIS Switchgears
Installation of equipments, Panels and cables.. Termination, testing and pre commissioning of control, AC, DC, and local Panels.
Installation of conventional grids and 11 KV feeders. Erecting of Transformer up AREA OF SPECIALIZATION
Project Management/Site Project
Engineer /Electrical Engineer Building
Construction, Electrical Testing
commissioning Supervisor. Electrical
Maintenance.
INDUSTRY TYPE
Power generation, Oil Refinery,
Building Construction, Glass
Industry. Food Industry,
COMPUTER SKILL
Word, Excel, Access, Internet and
to 250 MV installation and testing of lighting, Power, Fire Fighting and earthling system of Building and Plants. Installation and testing of control, power and HV cables.
Nestle Milk pack Ltd SKPF
System Installer Company Electrical Site Engineer
03/7/2006 To18/9/2008
Supervise, direct and control the activities of assigned personnel in the Electrical Construction.
Perform Supervisory functions at the unit level as established by Management.
Review Electrical Project package drawings / Designs before progress meetings, provide technical advice and recommend modifications as necessary.
Supervise construction and commissioning activities at the site, Participate in checking detailed drawings and other documentation.
Supervise and approve construction activities and inspection of materials and drawings. Monitoring of daily work progress, quality of work as per specifications” and maintain Progress Report. Yogurt plant project Electrical & instrument installation testing and pre commissioning complete plant
Supervise Maintenance Activity UHT, Tetra Hall, PLE, Utility Area, NDC, Cereal Plant Argon plant & Warehouse.
KNPC Kuwait Project
Kuwait Control Company (KCC) QA/QC inspector Electrical 13/9/2005To 22/06/2006
Responsible for project operational safety requirement. QA/QC documentation and review contractor installation procedures. Implement & enforce all company policies, procedures and practices. Planning construction electrical and Instrumentation schedule.
Monitor construction activities and progress. Witness and monitor electrical and Instrumentation equipment testing. Responsible for test packages documentation from pre-commissioning to final hand over to client.
Manage the Electrical Contactors daily construction activities, schedule and progress.QA/QC documentation and specification and verify contractor procedures.
Generate Field Change Request (FCR), Field Purchase Request (FPR) and Request for Information (RFI). Inspect and approve Electrical Installation on site. Witness and verify Continuity Merger, HI-POT and component testing for medium voltage & Low voltage equipment. Inspection of Connection and Installation switch gear and MCC panel.
Ghani Flot Glass (Pvt) ltd
System Installer Company Electrical Site Engineer
12/1/2005To08/09/2005
Supervision of Switchgear and Switchboards Installation including cable pulling Glanding and termination Coordinate with Engineering Regarding Drawings and as built drawing Supervise continuity check and Maggear check of cables spools and Inspection of cable Trays and supports.
Battery charge and Discharge Test Earth loop impedance Testing Power up24v control circuit and function test the switchgear power up LV switchgear via Tempers power Generate and perform Load TestinDie-Electric Test and Hi – Potential Test of MV Transformers-pot of High voltage power cables and Maggering of Low voltage power cables and control cables Bus Duct Test of Bus bar Connection.
Royal Embassy Saudi Arabia
ECHO West International Electrical Site Engineer
25 /1/2003 To10/01 /2005
Supervision of Switchgear and Switchboards Installation including cable pulling Gladding and termination Coordinate with Engineering Regarding Drawings and as built drawing Supervise continuity check and Maggear check of cables spools and Inspection of cable Trays and supports.
Lighting System Complete Building. Fire Alarm System. Lightning Protection System. Public Address System.
Telephone System. Close Circuit TV System. Inter Net System. Earthling System. Cable Tray Installation and Cable lying. Medium voltage Substation 13.8kv /480 v Installation and Commissioning Installation Substation Transformer WESCOSA 13.8KV/480VInstallation U P S System Ghazi Brotha Hydro Power Project 1450 MW
Flowtronix (Pvt) Ltd Electrical Site Engineer
23/03/2001 to 20/01/2003
With Toshiba Mitsubishi Japan
.
Supervising Installation NGR and Hipot Testing 21kv, Assembly of stator 290MW at site before Installation bus bar Hipot Test 33kv and Hipot Testing Stator 57kv.
Installation Excitation System, Installation VTS Panel and Hipot Test22kv, Assembly of Rotor at site and Heightens test of rotor and Assembly of Pole and Voltage Drupe Test.
Firefighting System Installation Turbine Site, Installation Panel And Cable Termite Installation Cable Trays, vibration system Installation Check & review as-built drawing & O&M manual Design & Review of various electrical drawings and documents for construction/ modification .• Develop and prepare single line, Relaying and metering diagrams, lightening layouts, Anoud Power Generation LTD
Flowtronix Pvt Ltd
Generator 5.96MWx4 Sets Electrical Site Engineer
29 /8/2000 to 16 /08/ 2001
Supervised, installation MV Substation, LV Substation, Transformer.
Cable Tray fabrication & Installation.
Cable Laying HV, MV, LV, Control, Instrument& Cable termite.
Earthling System & lightening protection System Installation.
Firefighting system Installation.
Lighting System Installation.
Mid Country Refinery PARCO
Descon Engineering (Pvt) Ltd Electrical Supervisor 06/8/ 1999 to 24/4/2000
Supervising Installation, Testing and Commissioning of Switch Gears, MCC, Control Stations, Marshalling Cabinets, Transformers, Bus-Ducts, etc.
Supervising the works for, Testing, Commissioning and trial operation for the entire Plant. Monitoring installation, inspection and test of both: Impressed Current C.P. System, Earthling System. Fire and Alarm systems, Close Circuit Television and control systems, SCADA system.
Installation of supports, cable trays, conduits etc. Cable laying through trays, ducts and conduits, Glanding termination works. Commissioning work on Generators, Transformers, Motors and the Work includes Construction oil Refinery, Presentation of completed work for Third Party inspection. Updating and Maintaining records for progress monitoring. Implementing Company Policy for maintaining High level of HSE Standards.
Monitoring the Works done by Sub-Contractors and Maintaining Quality and Progress. Daily Planning and Execution of Electrical. Installation Testing and commissioning of Switchgears, Transformers, Motor Control Stations. A.E.S Lal Pir Thermal Power Plant (2x365MW
Descon Engineering (Pvt) Ltd Electrical Lead Man
04/6/1997 to 14/2/1998
Supervising Installation, Testing and Commissioning of Switch Gears, MCC, Control Stations, Marshalling Cabinets, Transformers, Bus-Ducts, etc.
Fire systems, Close Circuit Television and control systems, SCADA system and controls using PLC and genius/ profile-bus/ optical fiber systems.
Installation of supports, cable trays, conduits etc. Cable laying through trays, ducts and conduits, Gladding and termination works.
Commissioning work on Generators, Transformers, and Motors and their controllers/starters, switchgears, testing and calibration of breakers, setting of protection devices, like over current, under voltage relays, UPS system and battery charging equipments, lighting systems.