ANDRES B. ESPELETA JR

Philippine Address: **** Almoro Cmpd. DelaPaz,

Binan City, Laguna

Mobile No: : +63-912*******

Email Address : ad1utw@r.postjobfree.com

DICIPLINE: Electrician

EDUCATION:

University of Perpetual Help Laguna - Binan

Bachelor of Science in Electrical Engineering

Laguna, Philippines, 2008 (E.E.)

WORK POSITIONED:

Over Eleven (11) years of electrical working experience in Oil and Gas Industry, Buildings and Industrial Facilities in Kingdom of Saudi Arabia, Singapore.

Over Seven (7) years in local as a LINEMAN.

Site Superintendent Electrical Engineer

Site Electrical Engineer

Hand onn engineer (Electrician)

WORK EXPERIENCE:

COMPANY : SAUDI ARABIAN KENTZ / SNC LAVALIN

Site Electrical Engineer

Unconventional Gas- System B Project

Northern Arabia Unconventional Gas

June 2017 May 2020

SNC KENTZ / SNC LAVALIN System B Project - Turayf

SPF OHTL(WITH CONTRACTOR -ACC) from B4 Pad to Wellheads # 14,18, 9 & Mini Hub

(SPF) SATTELITE PROCESSING FACILITY

B-1 PAD, B-3 PAD, B-4 PAD

VALVE 16 STATION, VALVE 30 STATION, & VALVE 24 STATION

MINI- HUB, MAIN HUB

Inspect and surely the connection of ground for the E &I equipment and device,

Grounding rod installation, testing for the Aramco required prior for

Exothermic weld connection.

DELTA for Instrument grounding system.

Installation of Anode Cathode (Magnesium bag) and testing for the Aramco required prior for Exothermic weld connection.

Arrangement of Neutral Grounding for Transformers, NER, Generators, and Diesel Generator connected to Main Grid Ground.

Installation and connection of grounding for SIB bldg. (SUPPORT) like UPS with dry type Transformer, Battery charger, FACP panel, Lighting Panel, Telecom Room, Marshalling Cabinet room, for PDC bldg. (Power Distribution Center) such as SWGR, ATS, dry type transformer, Interposing Relay panel, DMC PANEL DDC Panel, FACP Panel, VCD TEST CABINET.

Materials take off / estimation for all electrical system.

Assure that all materials are available in site during installation stage, electrical or for instrument.

Proposed and make a RED LINE, T.Q, and FCN, as built as per site condition.

Primary and Secondary Cable ladder/ tray installation with bonding ground as per drawing details.

Cable pulling from - to designation assigned area.

Internal (IR- test) to ensure the cables past as per standard.

Dressing, identification, glanding and termination.

Transformers, Load Bank, NER, Safety shower with (heater and chiller),

Welding receptacle, maintenance receptacles, FACP, DDC, Power Panels, LCS as per details installation.

Erection of lighting pole for street light, area light, task light, stanchion light.

XFR(T) 301 & 302, ATS, SWGR LV side, MV side MCC, LOAD BANK,NER 1 & 2 TEG REGEN AREA, FUEL GAS, AIR COMPRESSOR, INHIBITOR, LUBE OIL TANK, LP GAS COMP.1,2&3, POTABLE WATER TANK, DIESEL TANK, SAFETY SHOWER LP & HP BULK SEPARATOR, LP INLETS,MANIFOLD AREA, MOV s,CCTV s Installation and for all power and controls cable laying and termination with ferrules as per connection.

Assist the Pre-Commissioning team for final Torque, Rack out Rack in for the breakers, Solo motor Run, Illumination test, IR test.

Heat tracing cable installation and termination.

Installation and termination of switch rack.

Solar panel installation and termination.

Installation of standalone lighting pole with SOLAR and Batteries.

Assist Pre Com team

WELLHEADS # 3, 4, 4A, 17 (B-1) WH # 52(B-2),WH # 46(B-2) ALL B-3 WELLHEADS

WH #I,2,62,13,36 from B1 WH #46 from B2 & WH # 24( B3) all have SOLAR SYSTEM

Installed and check the equipment like E & I skid, Methanol injection skid, Annualizer skid, Modular skid, lighting layout, eye wash, CCTV, transformer, MDP.

Installed cable ladder as per IFC drawings.

Monitoring Create work schedule for the smooth work flow in site.

Prioritization and arrangement for all materials that needed for the system.

Lead the team to follow the correct installation details for any system.

Collect and prepare all necessary documents for RFI.

Materials take off.

Manpower distribution, scheduling of work.

Received and check all electrical equipment conformances with purchase orders, specification requirements. Ensure that all equipment / cables are handled in accordance in Quality procedures and store in safe place with cover.

Proposed and make a RED LINE, T.Q, FCN, as built as per site condition.

Coordinate with the different services motivating team members to maximize quality.

Heat tracing installation and connection.

Preparation & installation of SOLAR SYSTEM like PB panels and PB robots cleaner, PP-output & input (AC&DC), MTS, transformer and LCP.

Prepare RFI.

(ISF)INDUSTRIAL SURFACE FACILITY (WAREHOUSE, WELL SERVICE

BLDG.DINING & RADIO SHOP)

Review all specification and details in accordance with the standard for the project.

Assure that all materials are available in site during installation stage, electrical or for instrument.

Monitoring Create work schedule for the smooth work flow in site.

Prioritization and arrangement for all materials that needed for the system.

Lead the team to follow the correct installation details for any system.

Collect and prepare all necessary documents for RFI.

Manage site coordination in any conflict to other services.

Materials take off / estimation for all electrical system.

Manpower distribution, scheduling of work.

Received and check all electrical equipment conformances with purchase orders, specification requirements. Ensure that all equipment / cables are handled in accordance in Quality procedures and store in safe place with cover.

Proposed and make a RED LINE, T.Q, as built as per site condition.

Coordinate with the different services motivating team members to maximize quality.

Maintain standard of safety and comply with the company health safety requirements. Promote job site safety, encourage safe work practice and rectifies jobsite hazards immediately.

Assign supervisor, foreman for the quality and quantity of progress.

Monitor and inspect the site as per drawing such as conduit in lighting fire alarm telecom, for all installation of electrical equipment.

Monitor and inspect the duct bank for MV, LV, and COMMUNICATION.

Prepare RFI.

Company : FAWZI SALEH AL NAJRANI GROUP

Site Electrical Engineer

COGENERATION PLANT (230 Kv), Rastanura

ARAMCO Interconnection Facilities

May 2015 May 2016

FUTAI ARABIA / FAWZI AL-NAJRANI - Rastanura

Received and check all electrical equipment conformances with purchase order specification requirements. Ensure that all equipment / cables are handled in accordance with Quality procedures and store in safe place with cover.

Arranged all permit receivers for all activities with the issuer regarding update of the projects.

Proposed and make a RED LINE / T.Q as per site condition.

Installation for all duct banks, such as trench (sand levelling) pipe sleeves until concrete pouring, mandrel prior to cables pulling (1000mm2)

Supervised for JACKET TESTING for 1000mm2 cables.

Supervised for cables pulling with fiber optic.

Installation of lighting pole, SF6, bushing, insulators, and CCTV s, surge arresters.

Supervised for GANTRY assembled and installation.

Supervised and advised the contractor (EPC) for electrical activities.

Installation of Dry type transformer, relay panel in control room of SS #80

Supervised the cald weld activities.

Coordination for the Third Party in NEW COGEN under by Samsung Company.

Company : FAWZI SALEH AL NAJRANI GROUP

Project: 1. COLLEGE OF ART AND SCIENCE

2. SECONDARY SCHOOL (BOYS AND GIRLS) 3. MAINTENANCE WORKSHOP

4. ALKHARJ UNIVERSITY (RIYADH, KSA)

Position : Technical Dept. / Superintendent Site Electrical Engineer

Duration : July, 2013- April, 2015

Company : FAWZI SALEH AL NAJRANI GROUP

Project : SAMCO / SAAC, Acrylic Acid Complex

TASNEE / Al- Jubal, Kingdom of Saudi Arabia

Contractor : SAMSUNG ENGINEERING

Position : Electrical Engineer

Duration : April 28, 2013- June 30, 2013

Company : FAWZI SALEH AL NAJRANI GROUP

Project : JUBAIL EXPORT REFINERY PROJECT 2B

ACID GAS TREATMENT (SATORP)

Contractor : DAELIM INDUSTRIAL CO.LTD.

Position : Electrical Engineer

Duration : Dec.22, 2012 to April 20, 2013

Company : FAWZI SALEH AL NAJRANI GROUP

Project : BI-10-262 / BI-10-545-Replace 480V

Switchgear and 2.4 kV Substation 2/2A

(ARAMCO GOSP SAPANIYAH)

Contractor : ISAM KABBANI and PARTNERS CO.

Position : EXECUTION ELECTRICAL ENGINEER

Duration : Dec.27, 2011 to Dec.20,2012

1.FOR BI-00262 PROJECT

2.FOR BI-00545 PROJECT

SAUDI ARAMCO ID # 8990823

Company : SAUDI ROCK LTD. (RIYADH K.S.A.)

Project : Replacement of Control Panel and Communication Panel

(for 12 No. of Generators)

Turbine- Power Plant-5 (SEC)

Contractor : ABB Automation (RIYADH)

Position : Electrical Supervisor

Duration : Oct.2009 to May 2010, Oct.2010 to Feb.2011

Company : SAUDI ROCK LTD.(RIYADH K.S.A.)

Project : Extension for LVAC Room, Replacement of (2)

Auxiliary Transformer in CPS1 SEC-SOA,

JIZAN (EM-05597)

Contractor : ABB Service Contractor (RIYADH)

Position : Electrical Engineer

Duration : JUNE 6, 2010 up to Oct. 02, 2010

Company : SAUDI ROCK LTD.(RIYADH K.S.A.)

Project : 380/115kV Maaden RazAZwar w/ GIS

Contractor : ABB Contracting (RIYADH)

Position : Electrical Engineer

Duration : JULY,2009 up to Oct. 02, 2009

Company : SAUDI ROCK LTD.(RIYADH K.S.A.)

Project : Dismantling & Relocation of Powder Painting

Line Machine @ 2nd Building

Contractor : ABB Factory - Exit 16, RIYADH

Position : Electrical Supervisor

Duration : MAY, 2009 up to JULY 02, 2009

Company : SAUDI ROCK LTD.(RIYADH K.S.A.)

Project : Upgrading of Panels SEC-Substation-Riyadh

Contractor : ABB Contracting -RIYADH

Position : Electrical Supervisor

Duration : Feb. up to May, 2009

Company : SAUDI ROCK LTD.(RIYADH K.S.A.)

Project : Quality Control Department

Contractor : ABB Factory -Exit 16 -RIYADH

Position : Electrical Engineer

Duration : Dec.2008- Jan.30, 2009

Company : QUANTUM AUTOMATION PTE. LTD. SINGAPORE

Project : Building Construction- CITY SQUARE MALL

Contractor : QUANTUM AUTOMATION PTE. LTD.

SINGAPORE

Position : Electrical Engineer

Duration : January to July, 2008

Project : MERALCO, PHILIPPINES

Contractor/Company : Challenger Contracting Business Corporation

Philippines

Position : LINEMAN / AUDITOR

Duration : June 2001 Up to July, 2007

Project : Mandarin Hotel (Building Maintenance)

Contractor/Company : LAO Group Company - MACAU

Position : Maintenance / Electrician

Duration : Sept.1998 Up to August, 2000

LICENSURE & EXAMINATION

ORGANIC AGRICULTURE PRODUCTION ( NC II)

National Certificate (NC II) Electrical Installation & Maintenance II

Electrical Wiring and Design System ( COC)

Consumer Electronics Mechanic (COC)

SEMINARS AND TRAINING ATTENDED

BASIC FIRST AID AND CPR (TURAYF K.S.A)

WORK PERMIT RECEIVER (ARAMCO CERTIFIED)

ELECTRICAL HAZARD RECOGNITION (ARAMCO CERTIFIED)

SOC CONSTRUCTION (SINGAPORE)

PRINCIPLE OF LEADERSHIP AND PROJECT ESTIMATE &COSTING IIEE&NLC LAGUNA

POWER TRANSMISSION & DISTRIBUTIONSYSTEM,TRENDS IN ENERGY METERING IN & OUT OF ENGINEERING CAREER ---8th Annual National Student Convention, UST,Espana,Manila

ORGANIC AGRICULTURAL PRODUCTION NCII -- (TESDA) JZGMSAT

JUNE 28-AUGUST 9,2022

RAISE ORGANIC CHICKEN

PRODUCE ORGANIC FERTILIZERS

PRODUCE ORGANIC CONCOCTIONS AND EXTRACTS

RAISE ORGANIC HOGS

RAISE ORGANIC SMALL RUMINANTS

Operated like ROTAVATOR,GRASS CUTTER,MANUAL SPRYER, ETC.

A TEAM LEADER

Can easily adapt in any changes in work place or in even in co-worker

Have strong sense of responsibilities and hardworking

EDUCATIONAL BACKGROUND

TERTIARY

June, 2003-March, 2008 UNIVERSITY OF PERPETUAL HELP LAGUNA

Sto. Niño, Biňan, Laguna, Philippines

Bachelor of Science in Electrical Engineering

SHORT COURSES:

JUNE 28 – AUG.9,2022 (TESDA) Jacobo Z. Gonzales Memorial School of Arts and

Trade - San Antonio, Binan City,Laguna

ORGANIC AGRICULTURE PRODUCTION NCII

APRIL - JUNE (2005) (TESDA) TECHNICAL EDUCATION SKILLS DEVELOPMENT

AUTHORITY-- Elvinda Village, Sn.Pedro, Laguna

Electrical Wiring and System Design

APRIL JUNE (2006) (TESDA) TECHNICAL EDUCATION SKILLS DEVELOPMENT

AUTHORITY --Elvinda Village, Sn.Pedro, Laguna

Consumer Electronics Mechanic

SECONDARY

1986/ 1987 LAKE SHORE EDUCATIONAL INSTITUTION

Canlalay, Biňan, Laguna

PRIMARY

1980-1981 DELAPAZ ELEMENTARY SCHOOL

DelaPaz,Biňan, Laguna

PERSONAL INFORMATION:

Name : Andres Jr. Borja Espeleta

Birth Date : Feb. 04, 1967

Birth Place : Biñan, Laguna

Height : 6 0

Weight : 220lbs.

Father s Name : Andres A. Espeleta Sr.

Mother s Name : Francisca Borja Espeleta

Civil Status : Married

Religion : Catholic

Nationality : Filipino

CHARACTER REFERENCES

Name

Occupation

Contact Nos.

Hon. Herminio Boy Perez

Former Town Mayor (BINAN)

091********

Jimmy Lim

PM (SINGAPORE) Quantum Automation Pte Ltd

+659*******

Engr.Marlon Dela Merced

PP5 (SEC) Operation Coordinator A - KSA

+966*********

Engr. Crisanto Brillantes

Electrical Engineer-- SAMSUNG ENGG.

+966*********

Engr. PETER JAMES

Electrical Engineer - PMT SRACO(RASTANURA)

050*******

LAITH ALDABBAS

SITE MANAGER SA KENTZ / SNC-LAVALIN

058*******

PAUL BRIAN TRACEY

E & I SPRT SA KENT / SNC -LAVALIN

055*******

MS. ELNORA M. HART

OAP NC II TESDA / INSTRUCTOR

092********

I hereby declare that the above information is true and correct to the best of my knowledge and beliefs.

ANDRES BORJA ESPELETA JR.

Signature