ANDRES B. ESPELETA JR
Philippine Address: **** Almoro Cmpd. DelaPaz,
Binan City, Laguna
Mobile No: : +63-912*******
Email Address : *****************@*****.***
DICIPLINE: Electrician
EDUCATION:
University of Perpetual Help Laguna - Binan
Bachelor of Science in Electrical Engineering
Laguna, Philippines, 2008 (E.E.)
WORK POSITIONED:
Over Eleven (11) years of electrical working experience in Oil and Gas Industry, Buildings and Industrial Facilities in Kingdom of Saudi Arabia, Singapore.
Over Seven (7) years in local as a LINEMAN.
Site Superintendent Electrical Engineer
Site Electrical Engineer
Hand onn engineer (Electrician)
WORK EXPERIENCE:
COMPANY : SAUDI ARABIAN KENTZ / SNC LAVALIN
Site Electrical Engineer
Unconventional Gas- System B Project
Northern Arabia Unconventional Gas
June 2017 May 2020
SNC KENTZ / SNC LAVALIN System B Project - Turayf
SPF OHTL(WITH CONTRACTOR -ACC) from B4 Pad to Wellheads # 14,18, 9 & Mini Hub
(SPF) SATTELITE PROCESSING FACILITY
B-1 PAD, B-3 PAD, B-4 PAD
VALVE 16 STATION, VALVE 30 STATION, & VALVE 24 STATION
MINI- HUB, MAIN HUB
Inspect and surely the connection of ground for the E &I equipment and device,
Grounding rod installation, testing for the Aramco required prior for
Exothermic weld connection.
DELTA for Instrument grounding system.
Installation of Anode Cathode (Magnesium bag) and testing for the Aramco required prior for Exothermic weld connection.
Arrangement of Neutral Grounding for Transformers, NER, Generators, and Diesel Generator connected to Main Grid Ground.
Installation and connection of grounding for SIB bldg. (SUPPORT) like UPS with dry type Transformer, Battery charger, FACP panel, Lighting Panel, Telecom Room, Marshalling Cabinet room, for PDC bldg. (Power Distribution Center) such as SWGR, ATS, dry type transformer, Interposing Relay panel, DMC PANEL DDC Panel, FACP Panel, VCD TEST CABINET.
Materials take off / estimation for all electrical system.
Assure that all materials are available in site during installation stage, electrical or for instrument.
Proposed and make a RED LINE, T.Q, and FCN, as built as per site condition.
Primary and Secondary Cable ladder/ tray installation with bonding ground as per drawing details.
Cable pulling from - to designation assigned area.
Internal (IR- test) to ensure the cables past as per standard.
Dressing, identification, glanding and termination.
Transformers, Load Bank, NER, Safety shower with (heater and chiller),
Welding receptacle, maintenance receptacles, FACP, DDC, Power Panels, LCS as per details installation.
Erection of lighting pole for street light, area light, task light, stanchion light.
XFR(T) 301 & 302, ATS, SWGR LV side, MV side MCC, LOAD BANK,NER 1 & 2 TEG REGEN AREA, FUEL GAS, AIR COMPRESSOR, INHIBITOR, LUBE OIL TANK, LP GAS COMP.1,2&3, POTABLE WATER TANK, DIESEL TANK, SAFETY SHOWER LP & HP BULK SEPARATOR, LP INLETS,MANIFOLD AREA, MOV s,CCTV s Installation and for all power and controls cable laying and termination with ferrules as per connection.
Assist the Pre-Commissioning team for final Torque, Rack out Rack in for the breakers, Solo motor Run, Illumination test, IR test.
Heat tracing cable installation and termination.
Installation and termination of switch rack.
Solar panel installation and termination.
Installation of standalone lighting pole with SOLAR and Batteries.
Assist Pre Com team
WELLHEADS # 3, 4, 4A, 17 (B-1) WH # 52(B-2),WH # 46(B-2) ALL B-3 WELLHEADS
WH #I,2,62,13,36 from B1 WH #46 from B2 & WH # 24( B3) all have SOLAR SYSTEM
Installed and check the equipment like E & I skid, Methanol injection skid, Annualizer skid, Modular skid, lighting layout, eye wash, CCTV, transformer, MDP.
Installed cable ladder as per IFC drawings.
Monitoring Create work schedule for the smooth work flow in site.
Prioritization and arrangement for all materials that needed for the system.
Lead the team to follow the correct installation details for any system.
Collect and prepare all necessary documents for RFI.
Materials take off.
Manpower distribution, scheduling of work.
Received and check all electrical equipment conformances with purchase orders, specification requirements. Ensure that all equipment / cables are handled in accordance in Quality procedures and store in safe place with cover.
Proposed and make a RED LINE, T.Q, FCN, as built as per site condition.
Coordinate with the different services motivating team members to maximize quality.
Heat tracing installation and connection.
Preparation & installation of SOLAR SYSTEM like PB panels and PB robots cleaner, PP-output & input (AC&DC), MTS, transformer and LCP.
Prepare RFI.
(ISF)INDUSTRIAL SURFACE FACILITY (WAREHOUSE, WELL SERVICE
BLDG.DINING & RADIO SHOP)
Review all specification and details in accordance with the standard for the project.
Assure that all materials are available in site during installation stage, electrical or for instrument.
Monitoring Create work schedule for the smooth work flow in site.
Prioritization and arrangement for all materials that needed for the system.
Lead the team to follow the correct installation details for any system.
Collect and prepare all necessary documents for RFI.
Manage site coordination in any conflict to other services.
Materials take off / estimation for all electrical system.
Manpower distribution, scheduling of work.
Received and check all electrical equipment conformances with purchase orders, specification requirements. Ensure that all equipment / cables are handled in accordance in Quality procedures and store in safe place with cover.
Proposed and make a RED LINE, T.Q, as built as per site condition.
Coordinate with the different services motivating team members to maximize quality.
Maintain standard of safety and comply with the company health safety requirements. Promote job site safety, encourage safe work practice and rectifies jobsite hazards immediately.
Assign supervisor, foreman for the quality and quantity of progress.
Monitor and inspect the site as per drawing such as conduit in lighting fire alarm telecom, for all installation of electrical equipment.
Monitor and inspect the duct bank for MV, LV, and COMMUNICATION.
Prepare RFI.
Company : FAWZI SALEH AL NAJRANI GROUP
Site Electrical Engineer
COGENERATION PLANT (230 Kv), Rastanura
ARAMCO Interconnection Facilities
May 2015 May 2016
FUTAI ARABIA / FAWZI AL-NAJRANI - Rastanura
Received and check all electrical equipment conformances with purchase order specification requirements. Ensure that all equipment / cables are handled in accordance with Quality procedures and store in safe place with cover.
Arranged all permit receivers for all activities with the issuer regarding update of the projects.
Proposed and make a RED LINE / T.Q as per site condition.
Installation for all duct banks, such as trench (sand levelling) pipe sleeves until concrete pouring, mandrel prior to cables pulling (1000mm2)
Supervised for JACKET TESTING for 1000mm2 cables.
Supervised for cables pulling with fiber optic.
Installation of lighting pole, SF6, bushing, insulators, and CCTV s, surge arresters.
Supervised for GANTRY assembled and installation.
Supervised and advised the contractor (EPC) for electrical activities.
Installation of Dry type transformer, relay panel in control room of SS #80
Supervised the cald weld activities.
Coordination for the Third Party in NEW COGEN under by Samsung Company.
Company : FAWZI SALEH AL NAJRANI GROUP
Project: 1. COLLEGE OF ART AND SCIENCE
2. SECONDARY SCHOOL (BOYS AND GIRLS) 3. MAINTENANCE WORKSHOP
4. ALKHARJ UNIVERSITY (RIYADH, KSA)
Position : Technical Dept. / Superintendent Site Electrical Engineer
Duration : July, 2013- April, 2015
Company : FAWZI SALEH AL NAJRANI GROUP
Project : SAMCO / SAAC, Acrylic Acid Complex
TASNEE / Al- Jubal, Kingdom of Saudi Arabia
Contractor : SAMSUNG ENGINEERING
Position : Electrical Engineer
Duration : April 28, 2013- June 30, 2013
Company : FAWZI SALEH AL NAJRANI GROUP
Project : JUBAIL EXPORT REFINERY PROJECT 2B
ACID GAS TREATMENT (SATORP)
Contractor : DAELIM INDUSTRIAL CO.LTD.
Position : Electrical Engineer
Duration : Dec.22, 2012 to April 20, 2013
Company : FAWZI SALEH AL NAJRANI GROUP
Project : BI-10-262 / BI-10-545-Replace 480V
Switchgear and 2.4 kV Substation 2/2A
(ARAMCO GOSP SAPANIYAH)
Contractor : ISAM KABBANI and PARTNERS CO.
Position : EXECUTION ELECTRICAL ENGINEER
Duration : Dec.27, 2011 to Dec.20,2012
1.FOR BI-00262 PROJECT
2.FOR BI-00545 PROJECT
SAUDI ARAMCO ID # 8990823
Company : SAUDI ROCK LTD. (RIYADH K.S.A.)
Project : Replacement of Control Panel and Communication Panel
(for 12 No. of Generators)
Turbine- Power Plant-5 (SEC)
Contractor : ABB Automation (RIYADH)
Position : Electrical Supervisor
Duration : Oct.2009 to May 2010, Oct.2010 to Feb.2011
Company : SAUDI ROCK LTD.(RIYADH K.S.A.)
Project : Extension for LVAC Room, Replacement of (2)
Auxiliary Transformer in CPS1 SEC-SOA,
JIZAN (EM-05597)
Contractor : ABB Service Contractor (RIYADH)
Position : Electrical Engineer
Duration : JUNE 6, 2010 up to Oct. 02, 2010
Company : SAUDI ROCK LTD.(RIYADH K.S.A.)
Project : 380/115kV Maaden RazAZwar w/ GIS
Contractor : ABB Contracting (RIYADH)
Position : Electrical Engineer
Duration : JULY,2009 up to Oct. 02, 2009
Company : SAUDI ROCK LTD.(RIYADH K.S.A.)
Project : Dismantling & Relocation of Powder Painting
Line Machine @ 2nd Building
Contractor : ABB Factory - Exit 16, RIYADH
Position : Electrical Supervisor
Duration : MAY, 2009 up to JULY 02, 2009
Company : SAUDI ROCK LTD.(RIYADH K.S.A.)
Project : Upgrading of Panels SEC-Substation-Riyadh
Contractor : ABB Contracting -RIYADH
Position : Electrical Supervisor
Duration : Feb. up to May, 2009
Company : SAUDI ROCK LTD.(RIYADH K.S.A.)
Project : Quality Control Department
Contractor : ABB Factory -Exit 16 -RIYADH
Position : Electrical Engineer
Duration : Dec.2008- Jan.30, 2009
Company : QUANTUM AUTOMATION PTE. LTD. SINGAPORE
Project : Building Construction- CITY SQUARE MALL
Contractor : QUANTUM AUTOMATION PTE. LTD.
SINGAPORE
Position : Electrical Engineer
Duration : January to July, 2008
Project : MERALCO, PHILIPPINES
Contractor/Company : Challenger Contracting Business Corporation
Philippines
Position : LINEMAN / AUDITOR
Duration : June 2001 Up to July, 2007
Project : Mandarin Hotel (Building Maintenance)
Contractor/Company : LAO Group Company - MACAU
Position : Maintenance / Electrician
Duration : Sept.1998 Up to August, 2000
LICENSURE & EXAMINATION
ORGANIC AGRICULTURE PRODUCTION ( NC II)
National Certificate (NC II) Electrical Installation & Maintenance II
Electrical Wiring and Design System ( COC)
Consumer Electronics Mechanic (COC)
SEMINARS AND TRAINING ATTENDED
BASIC FIRST AID AND CPR (TURAYF K.S.A)
WORK PERMIT RECEIVER (ARAMCO CERTIFIED)
ELECTRICAL HAZARD RECOGNITION (ARAMCO CERTIFIED)
SOC CONSTRUCTION (SINGAPORE)
PRINCIPLE OF LEADERSHIP AND PROJECT ESTIMATE &COSTING IIEE&NLC LAGUNA
POWER TRANSMISSION & DISTRIBUTIONSYSTEM,TRENDS IN ENERGY METERING IN & OUT OF ENGINEERING CAREER ---8th Annual National Student Convention, UST,Espana,Manila
ORGANIC AGRICULTURAL PRODUCTION NCII -- (TESDA) JZGMSAT
JUNE 28-AUGUST 9,2022
RAISE ORGANIC CHICKEN
PRODUCE ORGANIC FERTILIZERS
PRODUCE ORGANIC CONCOCTIONS AND EXTRACTS
RAISE ORGANIC HOGS
RAISE ORGANIC SMALL RUMINANTS
Operated like ROTAVATOR,GRASS CUTTER,MANUAL SPRYER, ETC.
A TEAM LEADER
Can easily adapt in any changes in work place or in even in co-worker
Have strong sense of responsibilities and hardworking
EDUCATIONAL BACKGROUND
TERTIARY
June, 2003-March, 2008 UNIVERSITY OF PERPETUAL HELP LAGUNA
Sto. Niño, Biňan, Laguna, Philippines
Bachelor of Science in Electrical Engineering
SHORT COURSES:
JUNE 28 – AUG.9,2022 (TESDA) Jacobo Z. Gonzales Memorial School of Arts and
Trade - San Antonio, Binan City,Laguna
ORGANIC AGRICULTURE PRODUCTION NCII
APRIL - JUNE (2005) (TESDA) TECHNICAL EDUCATION SKILLS DEVELOPMENT
AUTHORITY-- Elvinda Village, Sn.Pedro, Laguna
Electrical Wiring and System Design
APRIL JUNE (2006) (TESDA) TECHNICAL EDUCATION SKILLS DEVELOPMENT
AUTHORITY --Elvinda Village, Sn.Pedro, Laguna
Consumer Electronics Mechanic
SECONDARY
1986/ 1987 LAKE SHORE EDUCATIONAL INSTITUTION
Canlalay, Biňan, Laguna
PRIMARY
1980-1981 DELAPAZ ELEMENTARY SCHOOL
DelaPaz,Biňan, Laguna
PERSONAL INFORMATION:
Name : Andres Jr. Borja Espeleta
Birth Date : Feb. 04, 1967
Birth Place : Biñan, Laguna
Height : 6 0
Weight : 220lbs.
Father s Name : Andres A. Espeleta Sr.
Mother s Name : Francisca Borja Espeleta
Civil Status : Married
Religion : Catholic
Nationality : Filipino
CHARACTER REFERENCES
Name
Occupation
Contact Nos.
Hon. Herminio Boy Perez
Former Town Mayor (BINAN)
Jimmy Lim
PM (SINGAPORE) Quantum Automation Pte Ltd
Engr.Marlon Dela Merced
PP5 (SEC) Operation Coordinator A - KSA
Engr. Crisanto Brillantes
Electrical Engineer-- SAMSUNG ENGG.
Engr. PETER JAMES
Electrical Engineer - PMT SRACO(RASTANURA)
LAITH ALDABBAS
SITE MANAGER SA KENTZ / SNC-LAVALIN
PAUL BRIAN TRACEY
E & I SPRT SA KENT / SNC -LAVALIN
MS. ELNORA M. HART
OAP NC II TESDA / INSTRUCTOR
I hereby declare that the above information is true and correct to the best of my knowledge and beliefs.
ANDRES BORJA ESPELETA JR.
Signature