MUHAMMAD ASIF LATIF
(Shift Operation Engineer)
****.*********@*****.***
Cell: +92-303-*******
Address: Street No.2 Khursheed Town Khudian Khass
District Kasur Pakistan
CAREER SUMMARY
An accomplished professional with diversified experience of combined cycle power plant (gas turbine, steam turbine electrical scheme of plant & switch yard (132KV & 220KV) and Renewable Energy (Solar Energy). Perform routine operation, troubleshooting and root cause analysis of the following systems: Electrical Scheme of Plant (380V, 660V & 11KV), Switch yard (132KV and 220KV), Gas Turbine and Steam Turbine operation, Heat Recovery Steam Generators (Boilers), Three Coal Boilers of 25 Ton (Each). Experience Summary
Total 9.5 years work experience
PROFESSIONAL EXPERIENCE
Company: KOT ADDU POWER COMPANY LIMITED
Place: Kot Addu, Punjab.
Designation: Shift Operations Engineer
Duration: May 2015 – Continue
Job Responsibilities:
Operation experience at GE FRAME 9E Gas Turbine (MARK VIe) & Alstom Steam Turbine VEGA 209.10 and Siemens V94.2 Gas Turbine (SPPA-T3000).
Operational and maintenance experience of 25 Ton steam coal boilers to generate steam for LSFO heating
Coal handling & management for three coal boilers installed at KAPCO.
Operation and maintenance of 10 High pressure steam Boilers of 150t/hr steam generation capacity each.
To ensure safe, smooth and efficient operation of GT and ST as per OEM recommendations.
To ensure smooth operation of Black Start Diesel Generator in case of country wide Blackout.
Preparation of Safety documents for issuing work permit to maintenance teams.
Detailed knowledge and understanding of Safety PTW (Permit to work) and LOTO (Lockout/Tag-out) procedures for the equipment isolation and normalization on ECLIPSE Software and Risk Assessment prior to start the work.
To ensure the operation of all equipment in a manner that will achieve the optimum plant availability, reliability, and efficiency without compromising personnel and equipment safety by following HSE (health, safety and environment) procedure and by attending meetings of safety steering committee.
To attend regular Planning Meeting in order to discuss work progress, schedules, problems, interferences and priorities.
Planning reports for machine washing outages.
Maintaining the log sheet, performance sheet, fuel stock sheet and daily plant summary while monitoring plant parameters.
To prepare a shift report which provides sufficient data to ensure that operations are being accomplished within the specified limits, schedules and technical parameters.
Hazard Identification ad Risk Assessment while considering environmental aspects and relevant impacts.
To conduct and participate in emergency mock drills and Training of shift staff for emergency preparedness.
To effectively recover the auxiliary supplies of whole plant in case of any Minor or Major Blackout.
Root cause analysis for the identified non-conformances and to implement corrective action plans.
To conduct Minor, Medium and Major Overhauling while ensuring Operations integrity. Position Organization Duration
Shift Operation Engineer (Power) Kot Addu Power Company Limited (KAPCO) 1600 MW, Pakistan
May 2015 to Date
Technical Support Engineer Be Green Solar Power PVT. Ltd. Lahore Pakistan May 2014 to April 2015 Page 2
Takeover/Handover charge of the plant to my counter part of outgoing/ incoming shifts and inform abnormalities on the plant equipment.
Prepared and reviewed the safe operating procedures (SOPs), Plant Local Procedures (LPs), Plant Local Management Instructions (LMIs), Hazard Identification & Risk assessment (HIRA) and Environment Aspects.
To identify, establish and monitor IMS Objectives, Targets and Programs.
BOILERS:
Operation experience of 10 NO. OF High pressure Heat Recovery Steam Boilers of 150 ton steam each installed for steam generation for steam turbine to generate Electricity
Operation and maintenance experience of 03 no of coal boilers 25 Ton each
02 no. of RO plants installed at plant
Compressors of 10 bar installed for instrument and control air. KAPCO PROFILE:
Kot Addu Power Plant was built by the Pakistan Water and Power Development Authority in five phases between 1985 and 1996 at its present location Kot Addu District Muzaffargarh Punjab Pakistan. Total installed capacity of Kot Addu Power Plant is 1600MW with 10 no. of Gas turbines and 5 no. of Steam Turbines. There are 4 Gas Turbines of GE (General Electric Frame 9E), 4 Gas turbines of Siemen’s V-94.2 and 2 Gas turbines of FIAT Company: Be Green Solar Power (Pvt.) LTD
Designation: Sales and Technical Engineer
Duration: May 2014 – April 2015
Job Responsibilities:
Conducting The Survey of the SITE and Energy Audit before project installation.
Load Calculation of project site for Solar system installation with modern techniques in KVA, KW and Power Factor of installed load.
Measuring and manage the available area to install PV Module and cabling from PV module to DC to AC inverter
Design of the Project according to Survey Report (Inverter Size, No. of Batteries, Total No. of PV Panels etc.)
Installed 1KVA up to 100KVA solar projects at different places in Pakistan.
Design up to 500KVA solar project for clients.
Provide after sales service to clients.
Participate in different meetings with clients and OEM team.
Received training related to DC inverter from OEM to provide after sales service to clients.
Meet the company sales target provided during the year.
Actively participate in all activities to enhance company business. ACADEMIC QUALIFICATION
Matriculation- Sadiq Memorial High School Khudian Khass Kasur.
Intermediate- Govt College of Science Wahdat Road Lahore.
Engineering-BSc-Electrical Engineering (Power), University of Central Punjab Lahore. TRAININGS
One year training of gas turbine and steam turbine operation.
Strategic Time management training from Time Lenders.
Strategic Vision training from Time Lenders.
Hazard Identification & Risk Assessment Training from SBEPL.
Hazard Identification & Risk Assessment Training from PIQC institute of Quality.
Hazard Identification & Risk Assessment Training from INSPECTEST.
Heat Rate Improvements of Combined Cycle Power Plants
Safety from the system
Dissolved Air Flotation Plant to treat the effluent water
Authorized safety controller for switching of Electrical Scheme of plant
Safety Controller training in KAPCO.
Power system Protection training by PRESCON Engineering.
Basic First Aid Training from Pakistan Red Crescent.
Advance First Aid Training from Pakistan Red Crescent.
Safety Award on OH&S Services Appreciation in 2018.
Volunteer in service (VIS) in Children Hospital Lahore.
Member of Electronics & Telecommunication society in UCP.
Member of JZT (Jihad for zero thalassemia) society.