Post Job Free

Resume

Sign in

Maintenance Supervisor Project Engineer

Location:
San Vicente, Laguna, 4024, Philippines
Salary:
U$D-65 per day
Posted:
December 08, 2023

Contact this candidate

Resume:

FERNANDO G. RAMIREZ JR

** ******* **. ***** **** Subd. San Pedro Laguna

Contact # +639*********

E-mail add: ad1soj@r.postjobfree.com

ad1soj@r.postjobfree.com

PROFESSIONAL PROFILE:

Gained experience in the field of Construction Upgrade / Grass & Brown Root (LSPB /LSTK Project), Maintenance, Shut down work and Pre- Commissioning & Commissioning star-up. Gained skills in troubleshooting panel view for DCS pertaining to harmony network, block AIO and DIO relay module performs calibration of loop package and closed out punch items/Combined Instrument Loop Check (CILC), Installation Acceptance Testing (IAT), cause & effect gas testing. In various field of work industries Infrastructure and Utility & METERING SKID & HOT TAPING & tie-in Pipeline/ Petrochemical(Ma’Aaden/Tasnee/SABIC) & Oil & Gas Marine Terminal Project.

EMPLOYMENT RECORD:

NAME OF COMPANY AL – HOTY COMPANY

LOCATION 25th St. AL –KHOBAR, KSA P.O. BOX 31729

PROJECT SAUDI ARAMCO

POSITION Project Engineer E & I (Infrastructure /F&G)

INCLUSIVE DATE DEC. 30, 2010 to July 07, 2019

DUTIES AND RESPONSIBILITIES:

Lead and provide technical support for implementation of the Aramco projects, working as the consultant on Owners Engineering missions with specific focus on the site construction supervision of the Aramco project

Frequently evaluate and report design, procurement or construction process and forecasts.

Implement and monitor corrective actions.

Execute Quality control processes to resolve problems in construction cost –effectively.

Develop and establish project policies and procedures as part of improvement Initiative.

Review and participate in technical bid analysis.

Able to review and analyze project design and construction contractor deliverables.

Assisting in the expediting of vendor dat and drawings of procurement items as required.

Promote HSE compliance within the organization.

Witness the pre-commissioning, commissioning, start-up and acceptance test for the Aramco process equipment

Witness the performance test of the Aramco project Plant, verify whether the performance guarantees as per the EPC Contract are met

Witness the reliability run test of the Aramco project Plant and advise any major issues noticed in operation of the Aramco project key process equipment

Support the OE Construction Manager to verify the functional guarantees and completion of the Aramco project Plant are met

Review the punch list of the Aramco project equipment

Review the as-built documentation for the Aramco project equipment & Implement the HSE at all time at site.

NAME OF COMPANY VOLTAGE ELECTRICAL CONTRACTOR CORP.

LOCATION # 5 St. CATHERINE St. PERPETUAL VILLAGE,

TAGUIG METRO MANILA PHIL.

PROJECT O.B.O. - U.S. EMBASSY SEAFRONT (NOX-3)

POSITION PROJECT IN CHARGE

INCLUSIVE DATE MAY 11, 2009 to May 18, 2010

DUTIES AND RESPONSIBILITIES:

Reviews Scope of work, Technical Specifications and project drawings. Looks into all the safety and housekeeping requirement at site. Review and plans construction schedule and advise contractor, as and necessary. Checks manpower and equipment’s at site and advises contractor, as and necessary. Checks site logbook, and makes necessary entries for contractor’s attention and action. Checks the materials arrivals at site and verifies whether these are as per the approved project schedules and status reports. Analyst Progress reports and minutes of Bi- weekly / weekly progress meetings to and advises contractor, as and if necessary to avoid difficulties in the future and maintains project schedule. Reviews coordination requirements with proponent and other Contractors and departments. Ensures that all construction drawings are updated, according to site modifications, changes regularly. Reviews project submittals in consultation with the Superintendent. Prepares own punch lists for each activity and advises the other contractor for necessary corrective actions. Verifies Inspection Requests and coordinates with the Inspection Organization. Verifies need for work permit, I’s, in specific work items as per US –Embassy Policy. Communicates and coordinates with the Project Manager or Superintendent

NAME OF COMPANY CHIYODA & TECHNIP JV.

LOCATION P.O. BOX 23965 DOHA QATAR CTJV-QCS

PROJECT QATARGAS – 2, 3 & 4, QGX / QCS PROJECT

POSITION INSTRUMENTATION SUPERVISOR

INCLUSIVE DATE DECEMBER 30, 2007 to JANUARY 26, 2009

DUTIES AND RESPONSIBILITIES:

Supervision of project instrumentation construction works which includes installation, inspection and testing. Assist to carry out instrument calibration trouble shooting and loop checks. Ensure that contractors comply with all aspects of the Worksite HSE Plan and policy; site regulation, permit to work and client requirements. Even safety studies such HAZOP & SIL. Maintain daily supervisory surveillance checks and records ensuring that contractor’s management and supervision are providing safe working conditions and permitting procedures, all required competent personnel, protective equipment, adequate supervision and manpower, with reliable, well maintained equipment to execute the contracted works as per contract schedule and targets. Ensure the instrument works complied with project specification, company procedures method statements, quality assurance and control documents. Ensure proper change control by issuing Field Instructions for all changes, reviewing Technical Queries to ensure responses are appropriate and practical, reviewing Advanced Revision notices prior to issue to contractors to ensure correct use of construction resources.

NAME OF COMPANY U.T.S. KENTZ Co. Ltd. U.A.E. L.L.C.

LOCATION P.O. BOX 34826 ABU DHABI U.A.E.

PROJECT HABSHAN -3 Bechtel & Gasco

POSITION E & I SUPERVISOR

INCLUSIVE DATE November 5, 2006 to November 10, 2007

DUTIES AND RESPONSIBILITIES:

Manage of DRN, NCR & hook- up drawing the I.E.S. &Substation and pipe rack the routing of cable tray & ladder and other instrument. Also handling 33kv to 11kv to 415Vrouting of bus duct transformer to switch gear. Also handle the alignment of support of panel & install the N.E.R; grounding and scheduling of work of manpower. Manage dressing cable termination of instrument cable and install junction box. Design and estimating the materials for fabricating of electrical supports and plate. Modification of works for final inspection.

NAME OF COMPANY TYCO FIRE & SECURITY Est. U.A.E. L.L.C.

LOCATION P.O. BOX 3333 ABU DHABI U.A.E.

PROJECT GASCO HABSHAN & BAB Plant

POSITION F&G Maintenance

INCLUSIVE DATE December 7, 2004 to June 22, 2006

DUTIES AND RESPONSIBILITIES:

To perform preventive maintenance and calibration & troubleshooting testing of all fire & gas and protection system. Conducts component defect investigation, examination, test and defect related investigations. Prepare draft Investigative reports of finding and recommend corrective or enforcement action. Also calibration and setting the low & high pressure switch of deluge system. Re-range the setting the detectors sensor according the checklist. Perform to re-boot up the fire & gas server, and handle the logic & sequence function check of F & G system. Also perform the corrective of design of F&G location and calibration. Preparing the job and P.T.W. and assist to 24x7 on call duties.

NAME OF COMPANY J.G.C.-K.B.R. Venture (JK)

LOCATION KRECHBA & TEGUETAURE IN SALAH ALGERIA

PROJECT IN SALAH GAS

POSITION INSTRUMENT COMMISSIONING TECHNICIAN

INCLUSIVE DATE June 1, 2003 to April 23, 2004

DUTIES AND RESPONSIBILITIES:

Assigned in PMC up to the commissioning start-up of plant. Calibrate all instruments like level, flow, pressure, temperature, vibration probe switches, and controlled valve. Troubleshoot process instrument and control system. Replace the worm & damaged or failed equipment. Preparation the documentation support and design drawing for calibration and perform the loop folder to testing from start-up the plant by the client witnessed. Assist the Vendor for installed the instrument and calibrating, and injecting signal from field to the DCS Yokogawa Centrum CS 300 system.

NAME OF COMPANY MOHAMMED H. AI-HAIDER CONST. EST.

LOCATION P.O. BOX 817 RAHIMA, RASTANURA 31941 K.S.A.

POSITION E & I SUPERVISOR

INCLUSIVE DATE Oct. 28, 2000 to April 11, 2003

PROJECT ASSIGNMENT:

SAUDI ARAMCO OIL COMPANY LTD. RABIGH

SAUDI ARAMCO Mobil Refinery Company (SAMREF) YANBU

GHAZ LAND II POWER PLANT (UNIT 5&6) SCECO. AL JUAYMAH

UTILITY & SULFUR RECOVERY ARAMCO HAWIYAH

SABIC – IBN ZAR AL - JUBAIL

DESALINATION PLANT (SWCC). AL – JUBAIL

PETROCHEMICAL (SABIC) AL - JUBAIL

DUTIES AND RESPONSIBILITIES:

Supervise the install of junction box of the cathodic, cable pulling, testing the anode, excavation of road line of cathodic, also bending & welding pipe etc. Perform calibration of transmitter (level, pressure, flow, temperature limit switch, pressure indicators using by test equipment such as hart communicators, pneumatic hard pump depending upon the range of the transmitter. Offer hands on support in departmental problems, Investigate instrument failures, problems and reliability issues, and offer support and recommend improvements to ensure instrument efficiency and effectiveness is continual. Maintain and promote adoption and use of Refinery Management Systems, to ensure that the requirements of the ISO9002 Quality Management System and the Safety Management System are always met within area of responsibility Responsible for evaluation and monitoring of work place hazards area, prepare the safety plans, toolbox meeting and implementation the PPE and housekeeping. Working area in oil & gas and petrochemical industries sector and completion monitoring. Execute commissioning activities in Utilities and Process Area, Up to finishing Product. Maintain the plant report any defective instrument for warranty, Prepare spare parts for critical instruments. Coordinate instrument and control activities such as Preventive, Predictive and breakdown maintenance programs, addressing and resolving complex operational and maintenance problem. Prepare Daily routine of maintenance preventive and proactive maintenance, and shutdown programs, support daily troubleshooting given by operation for immediately corrective action. Preparation of Maintenance procedure and Reliability program.

NAME OF COMPANY R.V. RABAJA CONSTRUCTION INC.

LOCATION LOT 13 BLOCK 1, MERRY LAND VILLAGE

357 J.P RIZAL ST. MANDALUYONG CITY

PROJECT BACLARAN MALL

POSITION CADET ENGINEER

INCLUSIVE DATE JUNE 3, 1998 to OCTOBER 18, 1999

DUTIES AND RESPONSIBILITIES:

Co-ordinate the In Electrical training programmed and gives theoretical and practical support, to ensure that relevant personnel’s training needs are met. Quality standard set-up checks and examines the standard measure and clearance Setting equipment according to specific of plan and give some techniques and handle of tools use to job. Also audit the finish job and interpretation the specs, and planning the job.

NAME OF COMPANY UNILEVER PHILIPPINES, INC.

LOCATION 1351 UNITED NATIONS AVE., MLA.

POSITION INSTRUMENTATION MAINTENANCE

INCLUSIVE DATE FEB. 3, 1990 to MAY 5, 1993

DUTIES AND RESPONSIBILITIES

Assigned to maintenance the edible oil refinery to perform calibration and simulate the transmitter: (level temperature pressure; flow) switches and pressure indicators. Using test equipment such as Hart Communicators, hard pumping depending upon the range of the transmitter.

EDUCATIONAL RECORD:

1993-1998 New Era University (Diliman, Quezon City)

Bachelor of Science in Electrical Engineering

1986-1988 Technological University of the Philippines (Ayala Blvd Manila)

Electrical Technology

1981-1985 New Era College (High School)

Echague Carlos Palanca, Quiapo Manila

1975- 1981 Geronimo Santiago Elementary School

Nepomuceno St., cor. Palanca San Miguel, Quiapo Manila

TRAINING AND SEMINAR:

Seminar on Lighting Application Fundamentals of Process Instrumentation and Controls

Training Room of Philips Electronics and Lighting Inc. New Era University

Salcedo Village Makati City September 27, 1996

December 3, 1996

Introduction to Fire Safety Level II Approval Gas Testing

Total Safety L.L.C. Total Safety L.L.C.

February 6, 2008 January 10, 2008

Basic Version 6.0 (CPR and First Aid for Adults) Information Protection Awareness

Total Safety L.L.C. Saudi Aramco IT

February 5, 2008 June 20, 2011

Permit to Work System (PTW) - Gasco Company U.A.E.

E- Learning Course of Aramco Matrix completed as per requirement at the project.

Res. Cert. #

Issued At

Issued On

S.S.S. # 03-9672849-4

Tin # 226-***-***-***

Passport #

NBI #

FERNANDO G. RAMIREZ JR.

Signature



Contact this candidate