Post Job Free

Resume

Sign in

Buyer Planner Supply Chain

Location:
San Jose, CA
Posted:
December 06, 2023

Contact this candidate

Resume:

Matthew P. Lemucchi

**** **** ***** ******

San Jose, Ca. 95129

408-***-****

ad1qyt@r.postjobfree.com

OBJECTIVE To obtain a position as a Sr. Buyer/Planner

EXPERIENCE/SKILLS/SYSTEMS

Project Management Procurement ORACLE, SOLOMAN, WDS, SAP (R3) Just in Time

Shipping/Receiving Planning CULLINET, SYMAN, SYMIX, BAAN Kaizen

Material Handling Supervision ASK/MAXCIM, MINX, CINCOM, EPICORE Kanban

Inventory Control Quotations ASK/MANMAN, ACCESS, VISUAL Supply Chain

WORK EXPERIENCE

Procuring Electro Mechanical, Hardware, IC’s Conns, Varisters, Transistors, Transformers, Caps, Resistors, Inductors, LED’s, Diodes, Fuses,

Thermisters, Sockets, Terminal Blocks, Heatsinks, program PAL’s & EPROM’s, PCB’s, Cable Assys, Boxes, Plastics, Sheet Metal & MRO.

Quoting and Negotiating Costs for NPI.

NEO Tech Inc. Fremont Sr. Buyer/Planner (9/21-5/23) Angel Barragan 510-***-****

Responsible for Production Purchasing for various customers. Responsible for RMA’s, MRB, expediting and shortages. (Laid off)

Brandt Electronics Inc. Milpitas Sr. Buyer/Planner (5/18-9/21) Curtis Kent 408-***-****

Responsible for Production Purchasing for various Power Supplies. Responsible for RMA’s, MRB, expediting and shortages. Through cost containment measures, saved the company from spending over $175,000.00 in 2 years. (Out of Business)

CPI, Palo Alto Buyer/Planner (2/14-2/18) Don Estes 650-***-****

Responsible for MRO Purchasing as well as some production: Hardware, Connector and Cable Assemblies. Responsible for RMA’s, MRB, expediting and shortages. Through cost containment measures, saved the company from spending over $325,000.00 in 4 years. (Laid off)

Hire Forces, San Jose Buyer/Planner (5/11-10/12-2/13-2/14) Contracted to CPI Don Estes 650-***-****

Responsible for MRO purchasing as well as some production: Hardware, Connector and Cable Assemblies. Responsible for RMA’s, MRB, expediting and

shortages. (Became a regular employee)

Ultra Clean Technology, Hayward Buyer/Planner (10/05 – 6/09) Matt O’Connor 510-***-****

Responsible for purchasing Electro Mechanical and Cable Assemblies. Responsible for RMA’s, MRB, expediting and shortages.

MasTec Inc, Castroville Warehouse Manager (8/03-7/04) Frank Berry 831-***-****

Manage warehouse and crew. Responsible for all material.

Smart Modular Technologies, Fremont Sr. Buyer (1/00-7/01) Barbara Simental 510-***-****

Responsible for purchasing Caps, Ferrites, Inductors and Diodes. Responsible for procuring material for New Products as well as

costing out the new BOM’s. Responsible for RMA’s, MRB, expediting and shortages. Through cost containment measures, saved

the company from spending over $150,000.00 in 1 year.

Larus Corporation, San Jose Sr. Buyer (9/96- 1/00) Roger Spaeth 408-***-****

Responsible for purchasing Inductors, Transformers, LED’s, Diodes, Varisters, IC’s, ASIC’s PAL’s Thermisters, Terminal Blocks,

Connectors, Switches, Covers, Fuses, Heatsinks, Sockets. Responsible for RMA’s, MRB, expediting and shortages. Through cost

containment measures, saved the company from spending over $250,000.00 in 2 years.

H.L.Yoh, San Jose Sr. Buyer (5/96-9/96) Contracted to Sable Technologies Bob Gibbs 650-***-****

Responsible for purchasing all production and non-production material. (Specific duration)

The 3DO Company, Redwood City Buyer (1/95-4/96) Mark Draper 415-***-****

Responsible for purchasing all of the components. Responsible for RMA’s and expediting. Ran the shortage and MRB meetings.

Assisted ENG with prototype buys. Assisted Materials Manager with special projects. Saved the company from spending over

one hundred thousand dollars in a one-year period. (Laid off)

Fine Pitch Tech, Inc. San Jose Sr. Buyer/Planner/Project Coord. (10/94-1/95) Bill Byrnes 408-***-****

Responsible for purchasing all the components except PCB’s for specific projects.

Solectron Corporation, San Jose Planner/Scheduler (12/89-10/90) Roger Brown 408-***-****

Responsible for running the shortage the meeting. Liaison between Purchasing and PC. Planner on the 3Com Project. Then Buyer/Planner responsible for purchasing all the components except for PCB’s, IC’s and Inductors, Cap’s and Resistors. Responsible for quotations for new projects. (Laid off)

EDUCATION West Valley College The Center For Manufacturing Education (APICS)

Saratoga, Ca. 95070 Introduction to Manufacturing Concepts (3 units)

9/77- 12-78 28 units Intermediate Concepts (courses 10 & 12) (3.6 units)



Contact this candidate