James Tracy Wooley
**** * ******** **. *Cell 979-***-****
Wichit a, Kansas ad1pis@r.postjobfree.com
Summary:
A knowledgeable, detail-oriented professional offering my expertise in all phases of Project / Construction Management / Planning / Scheduling / Cost Controls in all phases of Construction (Grass Roots, Revamp, Capital Projects, Metro Rail Project, TAR’s, Pipeline).
Manage Projects from Engineering Estimate / Design Assistance / Construction development planning, up to and including construction and start up
Create and update fully integrated Engineering, Procurement, & Construction resource loaded schedules utilizing CPM, Earned Value Systems, hard key plans, import plans (Excel), Maxivera, KAESavera (Within P6)
Maintain and develop resources, calendars, and other various tasks within P6 per Project Specific’s.
Experience includes, but is not limited to field planning, scheduling, cost control, estimating, & change management in the following areas: Engineering, Procurement, Construction, Turn-arounds, and Start-ups.
Industries worked in include, but not limited to petrochemical, chemical, refinery, gas processing, pipelines, power generation, airports, upstream and downstream facilities.
Experienced in the utilization of Primavera 2.1 to 20.2, Sure Trak, Micro Soft Project, SAP, Maxivera, Maximo, Kaesavera and other sources of software within a Windows environment.
Well versed in working independently or as a team member.
Education:
Brazosport High School
Freeport, TX
Brazosport, College
Clute, TX
Plaquemines LNG Project
Port Sulphur, Louisiana Nov 22 – Present
Lead Subcontract Scheduler – (TIC $21 Billion)
Maintain Master Schedule (Subcontractor Specific)
oWeekly Schedule Updates
oPrepared Monthly Client Reports
oManaged Costs within P6
Owner’s Rep. in Developing Primavera:
oWorkflow
oWork Processes
oSchedule Development
oSchedule Enterprise
oAll Aspects of Primavera Training and Support
ETS (Elite Turnaround Services) – Pryor Chemical Company
Pryor, Oklahoma
Senior Turnaround Scheduler June 22 – Oct. 2022
Responsible for scheduling work force throughout TAR Phases
Planned all aspects of TAR.
Develop TAR Schedule - resource loaded (Utilizing Primavera 17.8)
Schedule developed off Pipe Iso’s
Created Activity Coded Schedule
Developed WBS Structure
Field Walked / Planned Mechanical Jobs
Field Walked / Planned SS Packages
Field Walked / Planned Pipe Packages
Created Work Packages (Equipment Drawings, Iso’s, P&ID’s, Pictures, Man Hours and Material Take Off’s)
Developed Schedule per Work Packages – WBS / Activity Coded / Resource Loaded Schedule
Owner’s Rep. in Developing Primavera:
oWorkflow
oWork Processes
oSchedule Development
oSchedule Enterprise
oAll Aspects of Primavera Training and Turnaround Procedures
oImplementation and Utilizing P6
Casey Industrial – Genesis Project (TIC – $385MM)
Green River, Wyoming
Project Scheduler Mar 2022 – June 2022
Responsible for Project Schedule Maintenance
Weekly Schedule Updates
Maintaining / Managing Critical Path
Incorporate FCO’s
Field Walked / Project
oPhysical Verification of Progress
Managed Outside Contractor Schedules within Master Schedule
Held Weekly Progress Meetings w/ Stakeholder.
Utilized – EVM (Earned Value Method)
oCubic Yards Concrete
oTons of Steel
oLinear Ft. – Pipe
oLinear Ft. – Wire
oEtc.
As well as PFI (Performance Factor Indicators)
PTS Staffing Solutions
PBF Refinery, Torrance, Ca (TIC $50MM)
Field Planner / Scheduler Aug 2021 – Mar 2022
Responsible for scheduling work force throughout TAR Phases
Planned all aspects of TAR.
Develop TAR Schedule - resource loaded (Utilizing Primavera 17.8)
Schedule developed off Pipe Iso’s
Created Activity Coded Schedule
Developed WBS Structure
Field Walked / Planned Mechanical Jobs
Field Walked / Planned SS Packages
Field Walked / Planned Pipe Packages
Created Work Packages (Equipment Drawings, Iso’s, P&ID’s, Pictures, Man Hours and Material Take Off’s)
Developed Schedule per Work Packages – WBS / Activity Coded / Resource Loaded Schedule
Owner Rep. Planning
oDevelopment of Planning Outline / Cadence
oDevelopment of Proper Planning Package
oDevelopment of Coding Packages to Import into P6 via Excel
oDevelopment of Estimation Sheets
Scaffolding Take Off
Insulation Take Off
Welding Take Off
Mechanical Take Off’s
Fixed Equipment
Piping
Valve’s
Koch Industries/ - Wichita, Kansas Corporate Office July 2020 – Aug 2021
Beatrice, Nebraska – TIC ($125MM)
Enid, Oklahoma – (TIC $75MM)
Fort Dodge, Iowa
Dodge City, Kansas
Brandon, Canada
Supported the above Koch Fertilizer Plants – On Site / Remotely
oTAR Schedule’s
oMaintenance Outage Schedule’s
oCapital Schedule’s
TAR Schedule SME - (Subject Matter Expert)
oCreated Project’s within P6 EPS Node per Project / Site – Plant Specifics
oCreated Resource Library per Project / Site – Plant Specifics
oCreated WBS’s per Project / Site – Plant Specifics
KAESavera SME – (Subject Matter Expert)
oKAESavera – Maximo to P6
P6 Team Member SME – (Subject Matter Expert)
Implemented Maximo Software to Correctly Populate the Schedule
oMaximo Imports WO’s / Plans into P6
Activity / Steps
Activity ID’s
Activity Cods
Etc.
oP6 Exports into Maximo – Updates
oMaximo Writes Over P6
Monitor P6 to Maximo / Maximo to P6
Critiqued Job Plans / WO’s within the schedule
oOut of sequence steps
oMissing resources
oIncorrect resources
QC resources
UT
PT
Xray
Etc.
oMissing steps per Field Experience
Logically tied all activities per Koch procedures.
Utilized Primary / Secondary Leveling
oUtilizing Max Units / Time Resources
oAllocated Resource per WO / Job Plans
Set KT Activity Codes per Tableau Reporting
oTableau Reports all Aspects of TAR Through P6
oSet KT Activity Coordinators
KT Activity Coordinators Receive Designated WO’s / Plans per Primary Craft
Pipe / Valves
Rotating
oPumps
oCompressors
oTurbines
Etc.
Created / Maintained Major Milestones per Operations Timeline / Maintenance TAR Window
oSet OTSU’s (One Time Start Up) per Operation’s Specifications
Worked with Operations Develop Decommissioning / Commissioning Schedule
Worked with Capital Contractor to Develop / Maintain TAR Schedule
Progressed Schedule Utilizing P6 Team Member
oP6 Team Member Reads P6 Activities in Team Member
oTeam Member Progress’s P6
oP6 Update’s Maximo
Wrote TAR Schedule Development Procedures
Wrote / Implemented P6 Team Member Guidelines
oScheduler Approval Guidelines
oActivity Coordinator Guidelines
Developed Maintenance Schedule Procedures
Trained Daily Maintenance Schedulers P6
Too many responsibilities to list
Excel Contractors
XTO / ExxonMobil, Loving, New Mexico (TIC $365 MM) June 2019 – May 2020
Create and update fully integrated Engineering, Procurement, & Construction resource loaded schedules (Utilizing Primavera 18.8).
Held weekly and by weekly live schedule update meetings.
Managed Engineering Schedule and Implemented into Master Schedule.
Manpower planning and forecasting.
Created WBS Coded Schedule per Project needs.
Developed Monthly Project Reports in house and client level.
PTS Staffing Solutions
Andeavor / Marathon Refinery, Carson, Ca (TIC $55 MM)
Scheduler Jan 2018 – June 2019
Responsible for scheduling work force throughout TAR Phases
Planned all aspects of TAR.
Develop TAR Schedule - resource loaded (Utilizing Primavera 17.8)
Schedule developed off Pipe Iso’s
Created Activity Coded Schedule
Developed WBS Structure
Field Walked / Planned Mechanical Jobs
Field Walked / Planned SS Packages
Field Walked / Planned Pipe Packages
Created Work Packages (Equipment Drawings, Iso’s, P & ID’s, Pictures, Man Hours and Material Take Off’s)
Developed Schedule per Work Packages – WBS / Activity Coded / Resource Loaded Schedule
TGE Industrial Services
TPC, Pasadena, Texas
Scheduler / Coordinator - (Multiple Outages - TIC $5 - 10 MM) Dec 2015 – Dec 2017
Responsible for scheduling work force throughout TAR Phases
Develop TAR Schedule - resource loaded (Utilizing Primavera 8.4)
Developed job packages (Plans, P& ID’s, BOM, Scaff, Ins, all aspects of job needs)
Schedule developed of field plans.
Created Activity Coded Schedule
Developed WBS Structure
Coordinated all phases of TAR (Sub-contracts / Logistics / Outside Vendors / Pipe Fabrication / Execution / Start Up)
Clifton Planning Nov 2014 – Dec 2015
Sinclair Refinery, Sinclair, Wyoming
Lead Scheduler – (TIC $160 MM)
Responsible for scheduling work force throughout all Phases of TAR
Develop TAR Schedule - resource loaded (Utilizing Primavera 8.3)
Schedule developed off of field plans.
Created WBS as well as Activity Coded Schedule
Utilized P&IDs for reference points of equipment and locations.
Update and maintain all FCO’s.
Stapleton International Feb 2014 – Nov 2014
DuPont, Corpus Christi
Senior Consultant - (TIC $95 MM)
Import activities through Excel from SAP dump.
Logically tie all appropriate activities
Ensure all correct information was imported (including resources)
Maintained critical path.
Reported to upper management of schedule status’ as per procedures within the TAR.
Update and maintain FCO’s.
Lauren, EC Aug 2012 – Feb 2014
Abilene, Texas
Corporate Project Controls Coordinator
Maintain corporate P6 data base.
Develop P6 corporate company scheduling procedure.
Create and update fully integrated Engineering, Procurement, & Construction resource loaded schedules (Utilizing Primavera).
Power sector (Solar/Simple Cycle/Repowering/Chemical/Process):
Enel Green – New Mexico.
Linde (Several locations).
CF Industries (Donaldsonville, LA).
STEC (Edinburg, Texas).
Navajo Refinery (Artesia, NM).
Held weekly and bi-weekly live schedule update meetings.
Loading and updating of the engineering progress system.
Manpower planning and forecasting
BP America’s – Houston, TX Oct 2011 – Aug 2012
Primavera Administrator
Maintain P6 codes and coding structures.
Download P6 on North America Gas (NAG) personnel computers.
Configured data bases on (NAG) personnel computers.
Developed and Maintained P6 Procedures.
Maintained and developed resources, resource calendars, calendars, and other various tasks within P6 User Fields.
Elkhorn Construction, Inc. Jan 2011 – Oct 2011
Project Manager – Conoco Phillips Pipeline Maintenance – Capital Projects
Project Management roles
Managed several satellite offices within the COP umbrella.
Managed Sub-contracts / Logistics / Outside Vendors / Pipe Fabrication / Execution
Procured all project needs – equipment / piping (fabrication) / all logistics.
Managed all personnel – field / office / engineering / sub-contractors.
Liaison between COP and Elkhorn Construction
Project Bid Walks and Construction Project Kick Off / Execution
Cost tracking and reporting
Create and update fully integrated Engineering, Procurement, & Construction resource loaded schedules (Utilizing Primavera 6.0).
Weekly live schedule update meetings.
Plan/Schedule Maintenance and Small Capital Projects.
Manpower planning and forecasting.
Implementation and usage of the Management of Change process.
Manage all field activities.
Shell Oil and Gas on Shore, North America – Houston, TX Sept 2009 – Jan 2011
Field Scheduler – (TIC 350 MM)
Create and update fully integrated Engineering, Procurement, & Construction resource loaded schedules (Utilizing Primavera 6.0).
Held weekly and by weekly live schedule update meetings.
Managed Contractor Schedules and Implemented into Master Schedule.
Manpower planning and forecasting.
Implementation and usage of the Management of Change process.
Cost tracking and reporting.
Developed Monthly Project Reports in house and client level.
Commonwealth Engineering and Construction Mar 2007 – Sept 2009
Senior Scheduler – Calumet ($250 MM) / Carisal Project (TIC $200MM)
Create and update fully integrated Engineering, Procurement, & Construction resource loaded schedules (Utilizing Primavera 3.1).
Held weekly and by weekly live schedule update meetings.
Loading and updating of the engineering progress system.
Manpower planning and forecasting.
Implementation and usage of the Management of Change process.
Cost tracking and reporting.
Developed Monthly Project Reports in house and client level.
Review and validate construction contractor schedules.
Created resource loaded master schedule (Utilizing Primavera 3.1).
Cost tracking and reporting.
Field verifies physical progress per schedule updates.
Work with Project/Area Managers on the execution of scheduled activities.
Universal Ensco, Inc. – Engineering Firm, Gas Pipeline Oct 2005 – Mar 2007
Project Controls Functional Manager - DC Pipeline Project – Enbridge, Inc. (TIC $265MM)
Created detailed, resource loaded pipeline schedules (Utilizing Primavera 5.0).
Maintained detailed progress within schedules.
Monitored all contractor activities.
Cost control and reporting.
Document controls – Development and Maintenance.
Weekly Progress Reporting at Client level.
Solutia, Inc. – Petro-Chem. Jul 2002 – Oct 2005
Turnaround Project Manager - 3 – 4 TAR Yearly (TIC $1 – 5MM)
Plan / Schedule all aspects of TAR’s –
Field estimate each individual job, man hour estimate, materials all steps involved.
Managed Sub-contracts / Logistics / Outside Vendors / Pipe Fabrication / Execution
Procured all project needs – equipment / piping (fabrication) / all logistics.
Managed all personnel – field / office / engineering / sub-contractors.
Coordinated all S/D items (Inspection, Engineering and Maintenance).
Scheduled and coordinated all S/D jobs – Purchasing and fabrication logistics.
Coordinated contractors (all crafts) crew sizing and supervision.
Created detailed, resource loaded turnaround schedules (Utilizing Primavera 3.1).
Coordinated all phases of TAR (Sub-contracts / Logistics / Outside Vendors / Pipe Fabrication / Execution / Start Up )
Marathon Ashland Petroleum - Refinery Oct 2001 – Jul 2002
Turnaround Piping Coordinator
Worked with engineering pipe design.
Coordinate all piping items (Inspection, Engineering and Maintenance)
Schedule and coordinate pipe jobs – Purchasing and fabrication logistics.
Coordinate contractors – Crew sizing and supervision
Pipe and materials tracking from drawings to installation.
Managed the installation of all piping packages.
Maintained all piping specifications – Fabrication / Installation
GE Power Systems – Simple Cycle Power Plant July 1999 – Oct 2001
Project Controls Engineer (TIC $265MM)
Created detailed, resource loaded construction schedules (Utilizing Primavera 3.1).
Established and maintained detailed physical progress measurement system.
Monitored subcontractors and approved monthly invoices.
Set-up and maintained Cost Engineering and forecasting utilizing Prolog.
Expedited material deliveries to maintain schedule and cost control.
U. S. Contractors – BASF – Petro-Chem. July 1989 – Jul 1999
T/A – Project Manager - 2 – 4 TAR Yearly (TIC $1 – 5MM)
Responsible for scheduling of T/A activities.
Created detailed, resource loaded turnaround schedules (Utilizing Primavera 2.1).
Responsible for T/A implementation.
Maintained time boundaries in productions schedule.
Procurement of all fabrication needs.
Planned and estimated each activity per production job scope.
Responsible for scheduling work force throughout pre-post T/A.
Responsible for coordination of heavy equipment per T/A.
Responsible for each phase of T/A – Development phase through final clean up.
Scheduled and executed equipment repairs and fabrication.
Responsible for employment process – Hiring, screening, training and terminations.
Coordinated, planned, and executed all stages of T/A.
Coordinated T/A procedures and operation needs – Pre-Post T/A.
Coordinated outside vendors – Fabrication, scaffolding, insulation, hydro-blasting, etc.
Developed Turnaround Procedures
U. S. Contractors – BASF – Petro-Chem. Jan 1984 – Jul 1989
Skilled craft – hands on Mechanical
Laborer
BM
Pipe Fitter
Lead man
Foreman
General Foreman
Management
Licensed Operator (14 / 20 Ton Crane / JLG / Forklift / 8 Ton Drott)