Post Job Free

Resume

Sign in

Field Engineer, Pipeline Engineer, Project Engineer

Location:
Calgary, AB, Canada
Posted:
December 04, 2023

Contact this candidate

Resume:

Tony van den Camp, P.Eng, PMP

*** ******** ****** **

Calgary, AB T3M 1M2

587-***-****

ad1onb@r.postjobfree.com

Education

University of Alberta; Edmonton, AB; Bachelor of Applied Science in Mechanical Engineering; 2006 Registrations / Affiliations

Association of Professional Engineers and geoscientists of Alberta, APEGA Engineers and Geoscientists BC, EGBC

Project Management Institute, PMI

Specific Technical Expertise / Specialist Courses

CSA Z662, ASME B31.1, 31.3 and 31.11

Working towards a professional certification in Construction Management, UofC

Working towards a professional certification in FEA analysis, Cornell University Work Experience

Universal Pegasus International Calgary, AB

June 2022 – Present

Senior Field Engineer – Transmountain Expansion Project. Spreads 2, 3/4A, 4B, and 6/7A

Major Open Cut and Trenchless Evaluations (HDD and Auger Bores)

RFI Management for contractor design change requests

Pre-Test of HDD sections and Hydrotest of Mainline

Exposure to Pipeline stress analysis

Task coordination for spread specific engineering team

Field reviews of contractor installations

Review of contractor construction plans and ITP’s

Hydrotesting, Yield Plotting, Dent analysis and Chemical Preservation

Responsible for reviewing and providing on-going support for pipeline construction activities.

Complete and submit documentation to CER for LTO application. Elevation Capital Calgary, AB

2021 – 2022

Senior Project Manager, Construction and Land Development (Off Grid/Resort/Island) February 2021 – February 2022

Develop Project Procedures Manual, Project Execution Plan, and other project initiation activities; conduct project review meetings

Coordinate multi-discipline problem-solving and help to resolve technical / schedule / cost problems including non-conformance to job specifications or engineering standards and proactively implement the Change Management Process.

General Coordination and liaison between all personnel assigned to a project to ensure mutual understanding and agreement is reached on all phases of the work.

Plan and schedule the project scope to milestones, establishing critical delivery dates, and assisting in developing basic design data and engineering schedules and monitors the actual progress versus schedule.

Estimate and coordinate engineering estimates, including pre-contract and definition documents. Worley Calgary, AB

2019 - 2020

Senior Project Engineer / Project Manager

January 2019 – December 2020

Project Manager

Complete internal audits and readiness reviews for Worley offices in Belgium, Spain, Germany, Mexico, Canada, Netherlands, India, and Sweden against ISO 9001:2015.

Manage transition of global offices in the implementation of the Worley management system. January 2019 – November 2020

Senior Project Engineer / Project Manager

Assisted Project Manager / Director in development of the Project Procedures Manual, Project Execution Plan, and other project initiation activities.

Coordinate with site to review rebar installation prior to concrete pours.

Coordinate with site for supply and execution of concrete pours.

Co-ordinate multi-discipline problem-solving and helped to resolve technical / schedule / cost problems including non-conformance to job specifications and engineering standards.

Proactively implements the Change Management Process and document changes for discussion and acceptance with client.

General Coordination and liaison between all personnel assigned to the project (client, engineering, fabrication, suppliers, and construction / field engineers) to ensure mutual understanding and agreement was reached on all phases of work.

Planning and scheduling the project scope to milestones, established critical delivery dates, and assisted in developing basic design data and engineering schedule to monitor the actual progress versus schedule.

Promote the use of company and project specific procedures and work processes and support Quality Audits and the close out of any actions.

Establish and maintain interfaces with the client, construction, fabrication and supplier teams.

Coordinate Engineering deliverables (Engineering Work Packages – EWP) with field contractor and fabrication yard.

Work with Construction and Fabrication yard to sequence construction execution.

Work with vendors/suppliers to deliver materials to either site or fabrication yard.

Support commissioning and start-up activities

Complete turn-over and final project close out.

SNC Lavalin Calgary, AB

June 2018 – January 2019

Kearl Lake Maintenance and Upgrade projects

Senior Project Engineer

Assisted Project Manager / Director in development of the Project Procedures Manual, Project Execution Plan, and other project initiation activities for multiple maintenance projects.

conducted project review meetings involving all disciplines assigned to the project.

coordinate multi-discipline problem-solving and helped to resolve technical / schedule / cost problems including non-conformance to job specifications and / or engineering standards and proactively implements the Change Management Process.

Planning and scheduling of project scope to milestones, established critical delivery dates, and assisted in developing basic design data and engineering schedules and monitor the actual progress versus schedule.

Assisted the Estimating Department in coordinating the preparation of engineering estimates, including pre-contract and definitive documents.

Establish and maintain interfaces and positive relationships with the client. Surenus Murphy Joint Venture Calgary, AB

2017 – 2018

Pipeline / Steep Slope Project Engineer

April 2017 – April 2018

High Pines Expansion Project (Chetwynd, BC)

Oversee that the project is constructed and documented in accordance with contract documentation and good engineering practices.

Provide safety orientation and project orientation for site personnel.

Assist with the scopes of work and bid package development.

Assist in managing and reviewing the progress of subcontractor’s construction schedules.

Coordinate and monitor schedule updates, invoices and submittals.

Actively participated in subcontractor project orientation, project administration, coordination and close-out.

Analyze and resolve field construction issues.

Calculate and review steep slope machine capabilities and winching requirements.

Worked with Site Superintendent to review alignment sheets, typical designs and plan execution of general pipeline construction.

Maintain/complete Quality Control documents during project execution.

Manage field engineering team and provide support for technical field construction issues.

Manage survey and geotechnical personnel for documentation and record of pre and pose grade for right of way.

Manage geotechnical personnel for assessment and approval of trench entry.

Provide technical support to Project Manager and General Site Superintendent.

Complete preparation of progress reports / meeting minutes. November 2017 – April 2018

Coastal Gas Link – Estimate and Planning (Calgary, AB)

Complete scope of work development and bid package.

Complete schedule review and construction planning / sequencing for bid package.

Calculate and review steep slope machine capabilities and plan execution of steep slope work.

Complete proposal and information packages for client.

Establish subcontract tender enquiries and review / validate tender submissions. June 2017 – April 2018

Trans-Mountain Expansion Project – Estimate and Planning (Calgary, AB)

Complete scope of work development and bid package.

Complete schedule review and construction planning / sequencing for bid package.

Calculate and review steep slope machine capabilities and plan execution of steep slope work.

Complete proposal and information packages for client. Eastern Composite Services Long Harbour, NL

November 2016 – March 2017

Project Manager

Devise an installation, construction and commissioning plan for molten salt anode stripping operation

– including, but not limited to, Sulphuric acid charging, molten salt charging and commissioning of electrical and mechanical systems.

Supervise ground preparation, concrete pour and general construction of Long Harbour office Complex.

Review construction drawings and develop bid packages.

Plan, organize, direct, control and evaluate construction projects from start to finish per schedule, specifications and budget.

Liaise, consult and communicate with engineers, architects, owners, contractors and subcontractors, and prepare economic feasibility studies on changes and adjustments to cost estimates.

Ensure the Company complies both procedurally and in spirit with provincial, client and company occupational health, safety, and environment regulations; adherence to achieve zero loss time injuries in every workplace and a TRIF of less than 1.0.

Ensure daily and weekly reports are produced and reviewed for accuracy and presented in a professional manner.

Lead bid reviews and technical evaluations of bids for suitability. WorleyParsons Calgary, AB

2012 – 2016

Project Engineer / Project Manager

October 2015 – September 2016

Shell Waterton Gas Plant

Project Engineer / Project Manager

Managed and coordinated multidiscipline engineering activities.

Acted as primary technical co-ordination interface to ensure Shell’s environmental and, health and safety requirements were adhered to in addition to applicable government safety regulations and respective contractor’s safety requirements.

Maintained close communication between project and construction personnel through attendance at regular meetings to respond proactively to customer needs.

Issued Construction Work Packages for bid and participated in bid clarification and kick-off meetings. Confirmed contractor execution of work was in alignment with engineering work packages.

Reviewed purchase order and/or contracts to ensure engineering related requirements were included.

Initiated and coordinated contract change requests.

Coordinated with project controls group to assist with project schedule maintenance and progress tracking.

Responsible for scoping out projects to compile major kick-off documentation.

Responsible for proving project to stakeholders and presenting at each decision gate. April 2015 – October 2015

Shell Carmon Creek

Project Engineer

Managed and coordinated multidiscipline engineering activities for compilation of Basis for Design

(BOD), Project Execution Plan (PEP) and Total installed estimate cost (TIC).

Completed BOD for a Central Processing Facility (CPF), wellpads and distribution and gathering lines for a Cyclical Steam Saturation facility (CSS).

Acted as primary technical co-ordination interface to ensure that the client’s expectations were satisfied.

August 2014 – April 2015

CNRL Hydrotransport 4 and 5 and Superpot

Lead Project Engineer

Managed Detailed Engineering activities for engineering and procurement scope of a multi-discipline major brownfield project.

Coordinated with project controls to assist with project schedule maintenance and progress tracking.

Completed schedule reviews, discipline progress reporting, staffing and monthly reporting (schedule, financial reports), managed scope change, produced weekly and monthly client reports.

Coordinate with field to assess and respond to requests for information from the contractors, to ensure alignment of technical requirements and minimizing commercial impacts.

Coordinated and managed risk registers, project legal registry, lessons learned, project decision notices, technical deviation notices, and coordination of internal and third party interfaces. February 2012 – August 2014

MEG Energy Alliance

Project Engineer

Managed and coordinated multidiscipline engineering activities to ensure projects were executed in a safe, efficient, cost effective and timely manner.

Acted as primary technical co-ordination interface to ensure that the client’s expectations were met.

Ensured project conformed to the client’s approved basis of design and all applicable regulatory and code requirements.

Coordinated and managed risk registers, project legal registry, lessons learned, project decision notices, technical deviation notices, and coordination of internal and third party interfaces.

Coordinated with field to assess and respond to requests for information from the contractors, to ensure alignment of technical requirements and minimizing commercial impacts.

Successfully managed a team which was part of a successful completion of rapid execution debottlenecking project (schedule <9months) with engineering hours of 35,000 and procurement/installation of ORF (Oil Removal Filter) vessel. Shell Albian Sands Fort McMurray, AB

2010 – 2012

Muskeg River Mine – Tailings

January 2011 – February 2012

Project Engineer

Lead development and implementation of tailings projects.

Managed quality of project deliverables including Front-end development, engineering design, scheduling, costs, and construction.

Managed pipelines construction projects and conceptualization of future pipelines projects on site.

Managed engineering contractor to deliver project deliverables according to site specifications.

Assisted field engineers in assessing and responding to requests for information from the contractor, to ensure alignment of technical requirements and minimizing commercial impacts.

Reviewed purchase orders and/or contract to ensure engineering related requirements were correctly integrated into project documentation.

Maintained close communication between the project and construction personnel through attendance at regular meetings to respond proactively to customer needs.

Followed Shell Canada’s environment, health and safety requirements, applicable government safety regulations and respective contractor’s safety requirements.

Worked with Shell to develop a suitable training program for field engineers. February 2010 – December 2010

Lead Field Engineer

Coordinated and provided technical support to construction manager and construction group (RFI’s, Field Queries, Field Changes, etc.).

Managed construction of pipelines and coordinated between engineering and field execution.

Developed construction implementation plans for contractor use in project execution.

Lead field verification of construction activities to ensure compliance with design, standards/specifications, and applicable codes.

Coordinated with project engineers to trend, cost-analyze and implement cost-controls (multiple projects).

Acted as construction manager when construction manager was on turn-around (managed a team of 7 construction coordinators).

Lead walk downs, compiled deficiency lists for final acceptance of construction projects and reviewed turnover documentation.

Coordinated piping and mechanical activities with Albian operations, equipment vendors and project group to ensure quality of delivered materials.

Gemini Integrated Solutions Calgary, AB

April 2009 – February 2010

Estimating Lead

Managed projects for the fabrication group to construct MCC buildings, pipe racks, fire suppression buildings and e-houses for clients on time and on budget.

Prepared estimates for fabrication, maintenance and construction groups; estimates included costing/take-offs for electrical, structural, mechanical, painting, building erection and instrumentation.

Expanded contacts within industry to procure competitive bids for project estimates.

Developed database and estimation program for use in completing accurate bids based on historical data.

Kiewit Energy Services Ltd. Fort McMurray, AB

January 2007 – April 2009

MEG Energy Phase II

Lead Piping Field Engineer

Managed craft and supervision to implement engineering designs and specifications.

Developed construction plans for installing process piping.

Developed over 500 plant piping hydrostatic test packages and managed hydrostatic test crew through testing and re-commissioning Coordinated ordering of materials for hydro- tests (i.e. paddle blinds, venting blinds, etc.).

Coordinate with engineering to address design conflicts and issues that arose in the field by designing a solution and then proposing said solution to Engineering.

Planned 90-day and 4 week look ahead schedules for hydrostatic test and construction crews.

Implemented safety procedures and policies within team.

Lead construction crews to complete deficiencies for turnover of systems to client. CH2M HILL Construction Canada Ltd. Calgary, AB

May 2006 – January 2007

Field Engineer / Junior Project Controls Engineer



Contact this candidate