Employment:
**** – **** S.K.PARSHAD CONRACTORS
As a PIPING FITTER (Fabrication & Maintenance), U.P India.
Responsible for:
Installed Steam Boiler 210MW
Erection of Steam Boiler Pipeline.
Servicing and Maintenance of Boiler
1991 – 1993 BHARAT INDUSTRIAL WORKS
As a PIPING FITTER (Fabrication & Maintenance), U.P India.
Responsible for:
Installed Steam Boiler 210MW.
Erection of Steam Boiler Pipeline
Servicing and Maintenance of Boiler
May 1996 – Sept. 2012 AL-WATANIA POULTRY
As a Fabrication Supervisor (Project)
Including Responsible for:
Renovation Processing Plant (Slaughter)
Erection Cold Store and Refrigeration Plant
Air Chilling Tunnel and Water Chillers Installation and Erection
Rendering Plant Installation
Fat Separator Plant Installation
Steam Boiler Installation
Water Treatment Plant Installation and Renovation
Hot Water System Installation
Air Compressor Installation and Over Haling
Fire Fitting Pipe Line Unit Installation
High Pressure Pumps Installation and Servicing
Dec 19, 2012 – Present Cooperative Association of Assir Poultry Producers
Including Responsible for:
Steel and hydraulic fabrication of trailer
Installation of Aluminum steel water storage tank
Renovation Processing Plant (Slaughter)
Erection Cold Store and Refrigeration Plant
Air Chilling Tunnel and Water Chillers Installation and Erection
Rendering Plant commissioning and installation.
Fat Separator Plant commissioning and Installation
Steam Boiler Installation
Water Treatment Plant Installation and Renovation
Hot Water System Installation
Air Compressor Installation and Overhauling
Firefighting Fitting Pipeline Unit Installation
High Pressure Pumps Installation and Servicing
Maintenance work of RO, WWT, Boiler, Rendering and Processing section
Education:
1988 SCENDARY SCHOOL from BIHAR SCHOOL EXAMINATION BOARD, PATNA
Technical Education:
1996 TRADE TEST CERTIFICATE IN TRADE OF FITTER.
Recently Exercise:
Lead and Participate in all activities during work.
Erection, Installation and Commencing of Portion line and Deboning line (Stork Holland Company Machinery)
Dismantling Slaughter Plant for renovation and upgrading.
Prepare and arranging Materials and Planning for renovation.
Skills:
Well understanding about Computer hardware and software like,
(Word, Excel, Power Point and etc.)
Good command of Layout of Piping
Good knowledge about drawing of Piping.
Clean driving license
Mechanical Fabricator & Fitter
Installation of Equipment’s All processing Machinery
Installation of Refrigeration Equipment’s
Installation of Evaporators for chilling Tunnel
Installation of Air Chill Tunnel
Installation of Freezer
Installation of Chill Water Plant
Installation of Air Compressor and Servicing
Installation of Laundry Plant and servicing
Installation of Ammonia Compressor and servicing
Installation of Rendering plant and Maintenance
Installation of Condensers for Ammonia
Installation of Steam Boiler, Maintenance and servicing
Installation of R.O Treatment plant
Installation of W.W.T (Waste Water Treatment)
Well understanding about pneumatic system and repairing
Mohammad Ghulam Ali