Post Job Free

Resume

Sign in

Qa Qc Project Quality

Location:
Alexandria, Egypt
Posted:
December 01, 2023

Contact this candidate

Resume:

Page * of **

Curriculum Vitae

Name: Mohammed Ahmed Youness

Citizenship: Egyptian

Tel. No. : 002-*********

Mobil No. : 002 012********

E-Mail : Personal Email: < ad1mhj@r.postjobfree.com > (CURENT) Summary

37 years experience in management of projects ranged in value over US $ 15.5 billion almost in Refinery, Gas, Oil, LNG, Petrochemicals, supervision, inspection, Construction/Maintenance and QA/QC of Mass productions/Precast/Pre stressed R.C works, Piling works(Cross-Hole sonic Logging of Drilled Shafts and Low Strain Integrity Testing of Piles), Deep/Shallow R.C Foundations(With deep/shallow Excavations(OSHA) + Dewatering systems),Sea water intake pumps station, Sewage lifting pumps stations, Sludge pits(Steel Factories), U/G water valves chamber/water tanks, Flexible/Rigid paving including audits on Asphalt mix plants,Expressway/Highways(Through desert land and sand dunes - Check Geotechnical report, Design routs of roads(R.O.W)considering safety factors according to OSHA and all to be verifying by survey reports in accordance to IFC drawings. Overseen and control project Construction (CEP), Cost (Approved Budget), Time (Approved Schedule- Milestones), Quality (QMS - QA/QC & Following Approved ITP - PQP). Achieved QMS – ISO 9001:2015 requirements and ensured that Project Quality meeting Both The Client and Project Requirements at the same time by Improving areas of lack Standardizations using Approved Method Statements(MS) & NCR(Non Compliance Report) to record Project Spec. Violations and approved Corrective Actions & Follow up Daily/Weekly Reports to define Benefits of Project Quality System of Manpower control vs. Approved work procedure activities and Using calibration Digitals Tools to improve Project Quality by: - Infusing Data into Human Process & Reducing Human errors by Better Training. Aforementioned to cover following QMS Challenges:

1. Lack of Standardization due to Improper Documents and Standard Work. 2. Learning Lessons from the Previous Projects.

3. Identifying areas of improvement by using Digital Transformation. Airport works (Runway/ Taxiway/Apron) & logistic/Housing units/Villas area and internal Roads based on project specifications and accordance with the following standards, Qatar Construction Specification(QCS 2010),ACI, ASTM, AASHTO, BS Standard, Infrastructure, Maintenance works, Finishing works and Piping/Pipelines(C.S/SS with codes ASME B31.3 & ASME 9&API 1104) and Steel structure (AWS D1.1) - GRP/HDPE/UPVC Pipes, Heavy industries, Refractory, Fireproofing insulation works, specializing in supervision, inspection, QA/QC & projects construction management with strong QHSE experience and reviewing project scope of works, drawings, feed, construction, pre commissioning/commissioning, RFSU and start up phases including preparing and submitting monthly reports and manage M.O.M & Monthly meetings, weekly construction and QA/QC, Planning,QHSE meetings, reviewing/check Material submittal and data sheets and check if it complies with project specification.

Reviewing the Inspection Test Plan (ITP) and QC check list related to all Civil, Structural, Highways, Airstrips Architectural, plumbing, sewer, landscaping works. Reviewing Drawings (IFC), Method statements, work procedures, Details drawings, Materials submittals and issuing documents in codes 1,2,3,4

Page 2 of 12

Supervise and carried out inspection works as per ITP based on project specifications related to above subject.

Witness laboratory and third party testing related to above subject. Reviewing Field design changes and recommends alternative solutions as required. Reviewing Shop drawings.

Checking of as-built drawings.

Provide assistance and recommendation, if consulted, to Contractors regarding earthworks, Paving, dewatering system, piling works, concreting works, formworks, rebar works, steel structure erection.

Education/Qualifications/Affiliations

Bachelor scientific in civil engineering from Alexandria University, 1984.

QMS – ISO 9001:2015(Cert. No. 61097845)

Recognition Certificate from JGC (International Japanese Gasoline Cooperation).

IIF Certificate (Injuries and Incidents Free Certificate) &H2S Training from Qatar Liquefied Gas Company Limited.

QP (Qatar Petroleum Co.) Approval Ref. No. TN/1912

Recommendation Letter from AJIP BV (Italian) Libyan branch site representative.

Recommendation Letter from TECHNIP Libyan branch site civil superintendent.

ICDL Certificate (International Computer Driving License

Environmental Systems International L.L.C Certificate

Risk assessment course certificate from ASTON University UK and PETROSAFE EGYPT.

Experience Certificates from several international companies. Professional Experience

Date From: June 2016 To: 31st May 2022

Employer Wood.

Project Al Zour New Refinery – Kuwait State

Role QA/QC Lead Engineer PMC

Description Infrastructure/Mechanical/Utilities/Power/Control and Presevation works including Steel Structure – Refractory – Fireproofing works – MCC(Mechanical Completion Certificate) &PSSR(Pre Start up Safety Review) Team leader and Support Percomissioning activities.

Duties

Offshore civil works(Package – 45):

Dredging(Surveying works) and Soil improvement for stability and settlement of structures (Sieve analyses - CPT and PLT) – Rocks(Steven Rocks) & Geotextile(Nonwoven) Material inspection and installation - Core Lock & Shear Key fabrication and installation

- Revetment and Breakwater works – Off shore Tension pilling works at unit 93.

Onshore (Package – 55A):

Earthwork

Concrete Mix Design trials

Piling works( Total 2948 Piles)

Page 3 of 12

Concrete foundations (Reactors/Turbines/Heat

Exchangers/Compressors/Pumps/Pipe racks/Buildings/Supports).

Precast concrete pipe rack(Fabrication and Installation)

Buildings (Skelton works: Concrete/Steel Structure) - Finishing works (24 Nos. Elec. Substations, 16 Analyzer houses, 15 Field auxiliary rooms, 12 Operation shelters, 4 Maintenance/Operations Buildings, 2 Smoking Shelters, 20 Tropical Shelters and Temporary site facilities)

Paving & Roads

GRP/GRE and Concrete pipes installation & Testing.

Structure Fabrication (ABJ, SINOPEC, NSH at Site)

Hydro / Leak Testing

Equipment & 24 Nos. Packaged Sub – Stations Installation / SAT.

Fire Proofing for Steel Structure Pipe racks & Equipment & vessels supports/saddles/skirts and E/I Cables.

MC (Mechanical Completion) Dossier review/FQD(Final Quality Dossier as per QMS – ISO 9001).

MCC (Mech. Completion Certificate)Walk downs team leader (1979 Nos. Subsystems)

Equipment Installation

Material / Equipment Delivery

Refractory works for Fired Heaters (19 Nos.)

Site Acceptance Tests (SAT).

Functional Approval Tests (FAT).

MCC Phase Leader (Mechanical Completion Certificate).

PSSR Phase Leader (Pre Start-up Safety Review).

Support Pre Commissioning/Commissioning activities. Date From: Feb 2015 To: May 2016

Employer Qatar petroleum Co.

Project Repair of wharves & jetties at Mesaieed Port Role Project Civil Site Manager

Description The project is involving repair of all wharves & Jetties for Qatar petroleum subsidiaries in Mesaieed ports under direct supervision Duties Responsible for supervising all activities at the precast concrete yard such as; area preparation, areas classification, storage, QHSE activities, conduct audit tasks on concrete batch plant, loading/unloading areas.

Pre-concrete placement: Forms (IFC Drawings) & Forms bracing, Reinforcing Steel, Embedded items, Anchor bolts/holes, Sleeves, Cutout and opening positions, Loading/unloading points, Conduits, Chamfers. Page 4 of 12

Concrete placement (Project Spec. BS, ACI, ASTM) in hot and cold weather, Concrete Curing, log sheets, Fresh/Hard, Concrete service treatment and protection and concrete tests.

Monitor and check-up delivered repairing chemical material.

Carry out inspection on all repairing/replacement works of wharves & Jetties concrete elements including repairing& replacement deteriorated parts in fender support beams, Fenders & Bollards sand repairing in addition to service trenches walls & covers and concrete paving including joints. Date From: March 2010 To: Feb. 2015

Employer QAPCO (Qatar Petrochemical Co.)

Project Low density polyethylene Phase-3 (LDPE-3)

Role

Description QAPCO QA/QC/ Construction Lead Civil Eng Duties Boring holes 12 holes all over work sites and Check/reviewing Geotechnical report, follow and check survey work,

Pilling works(Total 414 compression & tension R.C Pile excluding test piles 6 Nos.), Dewatering system, Hyper compressor(R.C Foundations 1300m3(One shot),Booster Compressor(R.C Foundations 1100m3(Two stages) Reactor house foundation 2200 m3 one shot and R.C walls 2400m3), Steel piperacks, Steel structure buildings, Substation building, Infrastructure and CCR(Central Control Room) with high standard of finishing works(Fire/sound/Blast/Weather proof Ext. walls Door/Windows, HVAC System) – EP3(Ethylene plant new 6 Nos. Furnaces (Mixed Feed Crackers) - phase 3 Including R.C Foundations and steel structures, Refractory and insulation works), Cryogenic Ethylene Storage Tank (- 104 C- 50000 M3 & 156 Nos. R.C Comp. piles, R.C foundation circular shape 2600 m3 one shot), compressors plant, Main substations buildings including Transformers houses and HVAC system (Check the duct sizes, alignment, insulation and support of installed HVAC duct in accordance to IFC drawings. Witness DPT to all welded joint in

HVAC duct support:

Witness smoke/Light leak test to all HVAC supply/return duct line.

Check the AC packaged installation prior to commissioning.

Witness and record all data carried out during testing & commissioning of AC package in Accordance to manufacturing recommendation.

Conducted audits on Asphalt mix plants, against Flexible/Rigid pavements roads (Project Spec., QCS2010, AASHTO, ASTM):

Check Geotechnical report, (Check the sub grade preparation/levelness to be verifying by survey report in accordance to IFC drawing.

Check the laying of granular sub base and witness FDT.

Verification of all test result conducted for the backfill materials.

Check the spraying of prime coat / tack coat and verify the application rate.

Check the laying of asphalt base course, intermediate & wearing course and monitor the Temperature prior to laying, Witness the thickness and compaction test of asphalt to be done by any approved third party laboratories.

Sea water supply/Outfall lines 16'' to 48'' dia. GRP pipes, Open/Closed drains HDPE 20'' to 36'' dia. pipe lines using Mirror Welding Machine (Fusion Welding Page 5 of 12

Machine) for welding joints (Butt-welding) and check print out sheet for approval/rejection of the welded seam according to pipes manufacture recommendations.

QHSE

Promoting a culture of ‘no injury or harm to people’ and leading by example. Provide training, advice and assistance on QHES issues.

Ensuring that the highest possible standards of accident prevention measures are maintained at all times by ensuring work health & safety procedures are implemented.

Ensuring that all persons under their control fully understand their obligations under QHSE Legislation and are held accountable for the conditions of their workplaces.

Consulting and communicating with all personnel on QHES matters, procedures, instructions, etc.

Providing competent supervision, safe work procedures and safe plant, equipment and materials.

Date From: Sep. 2008 To: Oct. 2009

Employer QATARGAS

Project Laffan Refinery Project

Role QA/QC Lead Civil Eng.

Description Construction phase of Laffan new refinery in Laffan Industry City- QATAR to perform quality inspections activities

Date From: Sep. 2007 To: August 2008

Employer BP British Petroleum-Egypt

Project LNG Liquefied Natural Gas Train 1 – Taurt Development Project Role Deputy Construction Superintendent

Description The Taurt gas project is for production of 155 mmscfd plateau dry gas to be developed in two phases. The first phase is a Subsea facilities tied-back with 70km offshore pipeline to onshore facilities in West Harbor, Port Said. Modifications will be carried out at the existing plant and additional separation and produced water handling facilities installed along with the surface Subsea Controls System comprising Master Control Station, HPU, EPU, UPS and chemical injection system.

Page 6 of 12

Duties Leading a team of 20 engineers and supervisors

Overall responsibility for ensuring that the construction, planning and scheduling requirements were met.

Responsible for supervise and manage all civil works, Static equipment foundations, machinery foundations.

Managing all the activities required for construction the LER, Local Equipment Room including all civil, mechanical, electrical, fire fighting works.

Supervising all mechanical and piping works for the plant SLUG CATCHER.

Infrastructure including roads, closed/open drains, fire fighting networks, road crossings,

Electrical lighting networks- earthing system, lightening, trenching (different types).

Participate in project team review meetings.

Coordinate between different disciplines such as CIVIL, MECH. PIPING, E&I,

Supervising all commissioning and start up stage activities.

Shut down activities.

Operations regarding PTW

Coordinating, planning, with vendor reps and ensure all activities to be completed as per Project specifications, planned target date and within budget.

Date From: Sep. 2006 To: August 2007

Employer NOSPCO (North Sinai Petroleum Company – EGYPT) Project ONS (Off-shore North Sinai) field development – Off shore platform & on-shore CPF

(Central Processing Facility)

Role ONS Construction Manager

Description ONS (Off-shore North Sinai) field development; a MM$225 project involves the construction of off-shore platform & on-shore CPF (Central Processing Facility) connected to each other's by a 65 km 22” pipeline (61.5 off-shore) and to the East Pipeline by another 0.8 km one line.

Duties Integral members of the PMT.

Overall responsibility for ensuring that the construction, planning and scheduling requirements were met.

Regularly reviewing and updating the Company’s internal budget.

Liaison between the Company’s construction and engineering contractors.

Liaison with the Company’s other discipline superintendents to ensure critical milestones were achieved.

Establish the NOSPCO quality standards for the various Contracts.

Ensure compliance throughout the period of the Project.

Progressive QA / QC submissions with be reviewed along with Final Document.

Materials Identification, Correct use of approved procedures.

In-process surveillance and supervision of inspectors.

Application of codes and standards.

Attend Kick-off meetings.

Periodic audit visits to Contractors and Vendors, prepare reports. Provide Technical guidance and support to the Site Inspectors and conduct periodic QA / QC audits.

Ensuring compliance with the QA standards, keeping records.

Review the entire project specifications and drawings.

Implementation and maintenance of an effective and efficient quality program.

Control and measurement of Health, Safety and Environmental (HSE) performance.

Page 7 of 12

Date From: Jan. 2005 To: August 2006

Employer DEL (Dolphin Energy Limited) - G.LL (Germanischer Lloyd) DOHA - QATAR and TAWEELAH Port – ABU DHABI

Main Contractor: Saipem

Subcontractors : Socotherm - Sonsub - SPS (Subsea protection system), VO (Van Oord – Holland), Overseas AST Co. LLC.- Dubai (Marine, Civil, Mechanical Contracting and Engineering Co) and Jan De Nul Dredging LTD (Belgium) .

Project Dolphin Midstream Export pipeline (Onshore & Offshore). Role On Site Civil Supervisor, Client Representative for Offshore export pipeline crossing supports and Taweelah Shore Approach / Pipes Concrete Coating and internal lining Coating.

Description The project consist of 48”Dia., 360Km Offshore pipeline running from Ras Lafan, Qatar to Al Taweelah Port,, Abu Dhabi. It is designed to transfer 1.2 bscfd of dry gas.

Duties Overall supervision of coating FPE coating, Polyethylene/ polypropylene and concrete coating.

Internal lining coating line protection

Offshore supports – on seabed,

Crossing canals (100m & 70m width).

Ensure project completion within the approved time and cost limits. Date From: Jun. 2003 To: August 2004

Employer AJIP BV (ITALIAN) Libyan branch

Client Representative: Technip Coflexip

Contractor: JTS Contracting Company LTD. (A Subsidiary of JGC Japanese Gasoline Corporation / Technimont Italian / Sofri Gas France). Subcontractor: Daewoo Engineering & Construction Co. LTD. Project Western Libya Desert L.N.G/Oil Plant (WAFA Project). Role On site Contractor Civil ( From June to October 2003). Contractor QC/QA. Assistant Project Manager (From November 2003 to August2004).

Description The project consist of 48”Dia., 360Km Offshore pipeline running from Ras Lafan, Qatar to Al Taweelah Port,, Abu Dhabi. It is designed to transfer 1.2 bscfd of dry gas.

Duties Gathering Area (5 No. Oil & Gas Satellite wells, 32 No. Oil/Gas Well sites and 7 No. Water wells).

Burn pits and Refractory works.

Pipelines (Total Length 211 Km)

Pre cast and cast in situ concrete foundations and pits, Manholes

Airstrip

Interconnecting Road

Water supply and sewer lines

Desert Access Road (200 Km Length)

Reviewing and responding to contractors field change sheets

Attending the weekly on site planning & QC/QA & construction and HSE meetings

Liaison with the Company’s other discipline superintendents to ensure critical milestones were achieved

Prepare final hand over documents(FQD)

Page 8 of 12

Date From: JAN. 2003 To :Jun. 2003

Employer EMC Egyptian Maintenance Petroleum Co.

Project DAF Project (Dissolved Air Floatation) and Revamping of Coke Heater 12H2. Role On Site Project Manager.

Description Construction of DAF Project (Dissolved Air Floatation) and Revamping of Coke Heater 12H2.

Duties

DAF Project Constructions works.

Refractory works (Lining Application) For Coke Heater 12H2. Date From: MAY, 1999 To: September, 2002

Employer Rashid Petroleum Company (Share holders: British Gas International, Edison International Italian Co., Shell International and Egyptian General Petroleum Committee EGPC).

Project (Rosetta Terminal Gas Project) 9.5 Km. from Edco – Rashid City main road. Role Civil Superintendent (Owner representative) and when delegated acting Deputy Construction Manager heading a team of 4 Field Engineers (Owner representative) and 15 subcontractors field Engineers. Description (Project Construction Phase – P1):Terminal Process Plant and Accommodation Areas and (P1 closeout Phase).

Duties (Project Construction Phase – P1)

Terminal Process Plant and Accommodation Areas:

Overall responsibility for ensuring that the Company’s civil construction, planning and scheduling requirements were met.

Regularly reviewing and updating the Company’s internal budget.

Liaison between the Company’s construction and engineering contractors.

Reviewing and responding to contractors site queries.

Ensuring that both the Company’s and the Contractors provided material was available for the work in a timely manner.

Attending the weekly on site planning and budget meetings.

Liaison with the Company’s other discipline superintendents to ensure critical milestones were achieved.

(P1 closeout Phase):

Ensuring that Company HSE policy was implemented during civil construction works and followed by Contractors.

Preparing the scope of work for 24” gas export (27.50 km) and 6” condensate

(21.5 km) pipelines canals crossings protections

Ensuring that planned civil activities was completed on schedule.

Ensuring that civil activities were completed within budget.

Developing work scopes and providing cost estimates for new activities.

Liaising between project and operations departments for civil related issues.

Liaising between Company and Contractors for civil related contractual issues.

Managing local Contractors.

Ensuring the efficient organisation of on site labour.

Responsible for hire of equipment and procurement of civil materials locally. Page 9 of 12

Date From: MAY, 1997 To: May, 1999

Employer Qarun Petroleum Company (Share holders: Abaci Consulting Petroleum USA Co. and EGPC)

Western Desert - EGYPT

Project QARUN Terminal Process Plant and Accommodation Areas Role Senior Civil Engineer (Owner representative)

Description (Project Construction Phase – P1):Terminal Process Plant and Accommodation Areas and (P1 closeout Phase).

Duties (Project Construction Phase – P1)

Terminal Process Plant and Accommodation Areas:

Overall responsibility for ensuring that the Company’s civil construction, planning and scheduling requirements were met.

Regularly reviewing and updating the Company’s internal budget.

Liaison between the Company’s construction and engineering contractors.

Reviewing and responding to contractors site queries.

Ensuring that both the Company’s and the Contractors provided material was available for the work in a timely manner.

Attending the weekly on site planning and budget meetings.

Liaison with the Company’s other discipline superintendents to ensure critical milestones were achieved.

(P1 closeout Phase):

Ensuring that Company HSE policy was implemented during civil construction works and followed by Contractors.

Preparing the scope of work for 24” gas export (27.50 km) and 6” condensate

(21.5 km) pipelines canals crossings protections

Ensuring that planned civil activities was completed on schedule.

Ensuring that civil activities were completed within budget.

Developing work scopes and providing cost estimates for new activities.

Liaising between project and operations departments for civil related issues.

Liaising between Company and Contractors for civil related contractual issues.

Managing local Contractors.

Ensuring the efficient organisation of on site labour.

Responsible for hire of equipment and procurement of civil materials locally. Date From: Jan. 1997 To: April 1997

Employer HASAN ALLAM SONS CO. (Egyptian Construction Company) Project Mayorka Resort Project (North Coast Alex. ) Role On-Site Discipline Civil Engineer (Owner representative) Description

Responsible for Construction and Finishing works of High Level Villas and Swimming Pools.

Page 10 of 12

Date From: OCT. 1994 TO: SEPT. 1996

Employer Suez Oil Company (Suco) (Share holders: Demenix International Germany Co. and EGPC)

Project Ziet Bay and Ras-Budran Oil/Gas Fields Maintenance Works. Role On-Site Discipline Civil Engineer (Owner representative) Description

Plant Maintenance Works, Jetty, Airstrip:

Maintenance Works For The Following: -

1. Desalted Unit, Chemical Unit, Gas Compressors and Fuel Gas Compressors, Pipe Racks, Potable Water Tank, Knock Out Drum Foundations.

2. Pipe Sleepers (Underneath Pipe Lines And Loading Pipe Line 36”.

3. Replace the Deteriorated Pre cast R. Concrete Slabs of Six Numbers Pipes Bridges.

4. Repair Leak Areas of Water Treatment Unit Elements. 5. Repair Sand Filters Units Deteriorated Foundations Including Pipes Trenches.

6. Pre cast Footings for Light Poles.

7. Reinsulation (Water Proof And Thermal) Roofs Of Control Room, Main Substation, Battery Room, Material Office And Villas

8. Repair Sea Water Intake Units (Fire Diesel Pumps And Basin Etc)

9. Repair Helicopter Maintenance Steel Truss Hanger.

Repair Ras-Budran jetty (R.C & rubber fenders, R.C fenders beam, fabricate and install new wooden (beach pine) fender, quay wall R.C slabs, beams and joints, R.C sides walls of breakwater wall, R.C slab and fender beam of supply boats berth – replace pipes duct R.C covers).

Repair And Cast New Sleepers Underneath Injection Gas Line ( Operation pressure 120 Bar)

Repair gas turbine foundation at Ziet Bay field.

Construction of Ziet Bay Air Strip (2.4 Km).

Responsible For Monthly Invoices Hand Over Certificates, Reports and Faxes and Review Technical Specification, Q/C, Q/A and Scope of Work.

Date From: Jun. 1992 TO: SEPT. 1994

Employer Civil Works Co. (CWC) (Saudi Arabian Construction and Maintenance Co.) Al-Khobar, Saudi Arabia

Project Construction and Maintenance Works (Al Khober Municipality). Role Civil Engineer (Main contractor representative) Description

Responsible For Construction and Maintenance Works related To the Following :

Sewage Treatment Plant

Water Supply Network

Sewage Network

Page 11 of 12

Details :

Responsible For Maintenance Works related To the Following Projects:

Sewage Treatment Plant (133000 Cum./Day, 6 Tanks X 15700 Cum., 3 X 367 Lit. /Sec. Screw Lift Pumps, 6x3324 Cum. Clarifies, 2x700 Cu.M. Sludge Thickeners, 4 Sludge Pumps, 10 Drying Beds, Control Bldg., Chlorinating Unit, Sea Water Out fall).

Water Supply Network (Total Length = 573 Km., Pipe Diameters From 1/2 - 40 In., Material = Upvc, Galv.St. Asbestos & Concrete, Press. = 16 - 18 bar, 20 Well Pump Stations Of 55600 Cu.M. /Day, Desalination Plant 74750 Cu.M. /Day Total No. Of Residential Connections = 21336).

Sewage Network (Total Length = 459 Km., Pipe Diameters From 6- 44 In., Material = Asbestos, FRB, Ductile, Upvc & Concrete, Press.

=18 - 25 Bar, 8 Lifting Pump Stations, 3 Pump Stations, Total No. Of Residential Connections. = 19105).

Date From: JAN., 1989 To: APRIL, 1992

Employer Bapetco / Shell Gas / Oil Company (Share holders: Shell International and EGPC)

Project Bed-3 Integrated Development Infrastructure, Western Desert, Egypt Role On- Site Civil Engineer (Owner representative) Description

Responsible For Construction and Supervision Of: -

Machine Foundations

Residence Camp, Mosque, Sewage & Water Supply Systems

Highway Road 23 km. long with Road Marking & Traffic Signs

Air Strip 2 km. long & 45 m. wide

Erection of Tele-communication Towers of height 85-120 m. supplied by ROHN, as well as Grounding system, Rectifiers, Quality Control, Scheduling and Insulation works for AC/DC rooms.

Construction works of "Bed-2" including Gas Plant Modules FDN, Steel Structures, Pre-Cast elements for Well-heads, Pipe Sleepers

& Supports, Interlock Blocks, Paving works

Management & Scheduling and controlling site safety requirements. Date From: JAN., 1989 To: APRIL, 1992

Employer Bapetco / Shell Gas / Oil Company (Share holders: Shell International and EGPC)

Project Bed-3 Integrated Development Infrastructure, Western Desert, Egypt Role On- Site Civil Engineer (Owner representative) Description

Responsible For Construction and Supervision Of: -

Machine Foundations

Residence Camp, Mosque, Sewage & Water Supply Systems

Highway Road 23 km. long with Road Marking & Traffic Signs

Air Strip 2 km. long & 45 m. wide

Erection of Tele-communication Towers of height 85-120 m. supplied by ROHN, as well as Grounding system, Rectifiers, Quality Page 12 of 12

Control, Scheduling and Insulation works for AC/DC rooms.

Construction works of "Bed-2" including Gas Plant Modules FDN, Steel Structures, Pre-Cast elements for Well-heads, Pipe Sleepers

& Supports, Interlock Blocks, Paving works

Management & Scheduling and controlling site safety requirements. Date From: JAN., 1988 To: Nov, 1989

Employer National Office for Construction, Alex. (Egyptian Construction and Maintenance Co.)

Project The Iron & Steel Factory, Alexandria – Egypt. Role On- Site Civil Engineer (Contractor representative) Description

Responsible For Construction and Supervision Of: - All Maintenance Works Including Buildings And Framed Structures, Remedial Works For Corroded Concrete Foundation And Finishing Works. Management

& Scheduling and controlling site safety requirements. Date From: Oct., 1984 To: Apr, 1988

Employer Kajima Corporation (International Japanese Company) Project ANSDK- Alexandria National Iron & Steel Factory - Dekhila Project Role Civil Engineer (Main contractor representative) Description

Responsible For Execution Works of the: -

Direct Reduction Plant (Main Control Bldg., Chemical Treatment Station, Dehydrating Bldg., and Oxygen Air Compression Station).

Factory Main Laboratory.

Rod Mill Plant (Chemical Treatment Control Bldg., Control Rooms, Electrical Rooms, Weights Control Unit).

Administration (Transportation Site Office, Steel Plant Site Office).

Residential Area.

Also Engaged in Maintenance Works for Factory Equipment foundations, steel structure, industrial Buildings, utilities area. All References are available upon your request.



Contact this candidate