Post Job Free

Resume

Sign in

Oil Gas Shutdown Project

Location:
Guindy, Tamil Nadu, India
Salary:
(£35
Posted:
December 01, 2023

Contact this candidate

Resume:

RESUME

Name. : N.PALANI

Mobile. : 91-638*******

Passports : T5329253,

Expery. : 23.6.2029,

Email. : ad1lzn@r.postjobfree.com

Address. : Chennai 600032

Qualifications :Diplom one year course

Post applied for Electrician

Experience

Mulistore building,villa,Mall,Masqu,Fire station,Admin building,car parking,Oil&Gas,power station,substation,Distillation plant Etc.. Madina Qafac ternoaround shutdown project Qatar 3month Alghanim International construction projects kuwait 15years I.S.C.O Construction projects Kuwait 3years

E.T.A power projects Division DUBAI 7years

HYUNDAI Engineering Worked as a Electrician Saudi 1year Qatar Flower mils company Worked as a Electrician 4month Indu Enterprises chennai Worked as a Electrician 3 years Oil&Gas projects,

16nos Tank form projects,60nos Wellhead wether ford projects,GRTA&Asap shutdown projects,2non Disalter revamp project,125km pipeline ABB project,171Booster station saibem project,GC16 Gathering center Alkoroif project,GC15 ISCO project(offshore 4km conveyer belt THYSEN GURUP project

& 6km ship Loding Plot form HYUNDAI project)improvement of cathodic protection project,(Desalination plants 3millien gallons per day 3project)mall,villa,fire station,Mosque,car park building,HospitalAdmin buildings,laboratory,multistor building

OIL&GAS project

60nos wellhead showdown E&I project

Temperature&Presser indicater installed 180nos,

Installed Flow level indicator & water cut meter 120nos Installed H2S monitors 240nos RTU panel installed 60nos Solar panels installed 360nos battery&battery racks set 60nos Cable laying Instrument control power earth cable 120kmeter Fabrication & installation of Cable tray&JB gland&termination 400kv power station project

open&combined cycle 250MW 3nos gas&steam turbine Installation of Hyundai transformer 11kv/400kv 3nos Installation of HT LT panel,Relay&controlpanel&SF6switchgear,installation of cable tray&cable laying power,control,FO & instruments cable installation of lighting arrester DEWA project (Dubai Electricity Water Authority)

Substation project 132kv/11kv & 132kv/33kv

Installation of transformer 4Mva&reactor132kv/11kv 24nos Installation of 11kv (AEG) SF6 SWGR 600nos

Installation of 132kv SF6 SWGR 7nos team work

Installation of battery bank,HTLT relay&control panel Installation of cable tray cable laying Glanding Termination Installation of instruments for Distillation plant large quantity Oil&Gas project

Installation of transformer 75kva to 17.5Mva

Installation of Mcc panel,LV switch gear,control & relay panel,ENMC panel,UMD ups panel,lighting panel,MOV panel,Battery bank,lorge number of Solar panels,Heater control & space heater panel,Thyrister panel,Heat tracing panel,presher transmitter,flow level transmitter,water cut Meter,choke volve,LCC panel,H2s monitors,level indicates,temperature element &transmitter HT,LT Glanding box & Junction box,10 &12 meter height street light poles with platform,3meter stanchen mount light fixture & switch rock,lighting arrester, Installation of earth pit,fabrication & installation of cable tray 150mm to 900mm gi

& stainless

Cable laying under ground above ground HT,LT,MICC,FO,control,instruments & CP cable 1.5sqmm to 630sqmm. Glanding & Termination BS171(SAIPEM project) oil&gas project

Installation of UMD UPS panel 20 nos, HEATER control panel&SPACE HEATER panel 4 nos,PDB panel 4 nos, ENMC panel 4 nos,MCC panel LVSW panel 20 nos, THYRISTOR panel,2 nos,Installation of Gland box 20 nos, Installation cable tray 500 mtrs, Installation of battery bank 2 set, Cable laying. 55,000 mtrs,Panel to luping cable,cable glanding size M20 to M110 &cable Termination 6000 nos,Installation of Earth pit 24

GC 16 ( AL KORAFY ) oil&gas project

Installation of (7.5 & 17.5)MVA Transformer 6 nos

Installation of 11KV switch gear,3.3 switch gear 50 nos LV switch gear,IRP,RP,MOV panel,UPS Panel 105 nos Installation of Bus duct 80 mtrs

Battery rack and Batteries Installation 4 set

cable tray installation 900mm & 600mm- 1450 mtrs. Cable glanding and Termination – 3000 nos

Cable laying HT,LT,Control cable, FOC cable 45000 mtrs. Installation of street light poles 12mtr hight 30 nos TL-4 (ABB): oil& gas pipeline project

SVS – Valve pit, installation of solar panels and batteries RTU Controls panels, fire detector, flow Transmitter,Earth pit and cable Trays and CP works,Test post installation bonding box installation,Anode installation Reference Electrode installation and cad welding & Instrument,power&control,earth cabl

Supply installation & commissioning of 2*160Kva UPS for data Center in MINA AHAMADI REFINERY and MINA ABDULLAH REFINERY

Installation of UPS panels, Battery rack, Batteries, Main incoming panel, outgoing panel, Distribution panel, Installation of JB, Conduit work, cable laying glanding, termination and shutdown activity.

KNPC oil&gas project

CB/PD 1223 Improvement of Cathodic Protection System in Old Tank Form Area

(Unit52), IRT Pipelines (Unit55) and Cock terminal (Unit72) at Mina Abdullah Refinery

41 No’s of transformer rectifier,12 No’s of FUJI feeder module 12 No’s of MDB’s,12 NO’s of LDB’s 18 No’s JBs,44 No’s of light fitting and conduit work,36 No’s of earth pit,Laksh’s of meter LT and CP Cable laying lead sheath cover,Installation of cable trays and conduit and conduit fitting,Large No’s of cable glanding and termination and LT joint

PROJECT 1131- MINA ABDHULLAH REFINERY:

EPC Contract for Implementation of HAZOP Recommendation. Spare lube oil pump for the main crude charges pump RCD unibon unitInstallation of Feeder modules and starters

Cable trays and tray supports,Cable laying, Cable glanding and termination,Conduit works and conduit fitting.

(GRTA) MINA ABDHULLA REFINERY:

Installation of 6" MOV (motor operated valve) in the common Suction line of 3 pumps in a LPG pipe line Installation of FUJI feeder module,Installation of Emergency push button,Cable laying power and control,Cable glanding and termination

Installation of Westinghouse & FUJI Feeder module,Cable Laying Power and control earth cable for 10” & 20” MOV

LABORATORY (MINA ABDHULLA REFINERY)

Installation of panels and DBs,Provision of power socket outlet,Cable Laying and termination of 4cx120sq.mm, cable Trays 150mm conduit and conduit fitting East Tank Farm Lighting Project – 16 Tanks Unit 52 ( MINA ABDHULLA REFINERY)

Installation of 28 no’s of flood light fixtures and 10 meter height flood Light poles with ladder type,Installation of 116 no’s stanchion mount light fixtures and 3 meters height light poles

Installation of 18 no’s earth pit 2 no’s of switch rack and 2 no’s FUJI cubicle 55no’s of junction box ( 600x500x200),Cable laying of 3Cx120,16,10,4 sq mm U/G A/G Length 30,000 Mtrs, Cable glanding and termination Conduits fitting Revamp of De Salters In Eocene Unit In – MINA AL AHAMADI REFINERY: 6 No’s of step up transformer 440v/11Kv (75KVA power unit) 2 No’s of 225 KVA Togami feeder modules,2 No’s of wash pump (40hp),2 No’s of 40hp Togami feeder modules,2 No’s of field control panel and Emergency push button,Panel support,cable trays and trucking support frame and structure, 10,000 meter cable laying 3cx120,35sq mm and 4cx2.5 sq mm LT and control cable glanding and termination and conduit fit ORGANIZATION:ISCO From 01.12.2001 TO 06.05.2005):

NEW OIL PIER MINA AL AHAMADI REFINERY: Hyundai project LT & HT panel erection stainless steel cable tray 900,600,400,300,150 mm(15000 meters) cable laying LT & HT and control & earth cable (1,30,000 meters) LT & HT cable joining and cable glanding and termination ORGANATION: ISCO (TYSSEN KRUPP)

Conveyer Belt Revamp project- (SHUAIBA PIC)

Erection of PLC panel and DBs,Limit switch. Rotating signal light,Light fitting conduit fitting,Cable Tray 400 size (5,000 meter),Cable laying LT & control flat type cable (35,000 meters)

Cable jointing & cable glanding and termination

ORGANIZATION :ETA POWER PROJECT DIVISON (From 06.12.1993 TO 07.01.2001):

3M Project Distillation plant (3 million gallon per day) FUJAIRAH,RAS AL KHAIMAH,AJMAN (total 3 plants),UAE Installation of LT panel, DCS panel, Distribution board Flow transmitters, level transmitters, pressure and temperature Temperature street light poles, Tube light fitting cable trays and trucking cable glanding & termination, conduit works

DEWA (DUBAI ELECTRICITY WATER AUTARITY)

substation project UAE area,CMC 132/11kv, Holiday centre Dubai,132/11kv jumera beach 132/11kv, Dubal Aluminium Company,132/11kv Abu Dhabi E11 & W59 substation project 132/11kv, 132/33kv FUJIRA,SF6 switch gears (AEG, TOSHIBA, SEMENCE, HOLUC),Transformer and reactor (FUJI, SCOCH POWELS),Installation of 11kv switch gear, LT panel, DB,Street light poles & tubes light fitting, cable trays, HT and LT and control cable laying, cable glanding and termination,

QATAR Flower Mils Company

Shutdown project 4 month

ORGANIZATION: HYUNDAI 02.06.1991 TO 1992 KING FAHAD Medical city RIYATH (K,S,A)

Hospital construction project,Electrical wiring of light & power ( total point 15,000)

ORGANIZATION: INDU ENTERPRISS ( From 20.06.1987 TO 14.1990) London rubber company- Virudhunagar(Tamil Nadu) Erection of 11kv DP Structure:

Erection of transformer,Erection of HT & LT panel,Fabrication of cable trays Fabrication of mounting frame for pane & DB

Installation of lighting Arrester, earth busbar,Installation of tube light fitting,Cable laying, cable glanding & termination Installation of earth pit and complete earthing work SPIC Nagar melavittan Tuticorin:

Erection of street light panels 400No’s,Cable laying 20km and cable glanding & termination

All India radio Station – Kotthagudam & Warangal (AP): Erection of 11Kv db Structures,Erection of transformer Erection of earth pit and complete ear thing work,Cable laying, cable glanding & termination

Ponds Company – Pondicherry:

Erection of panel board & DB,Cable laying and cable trays Cable glanding & termination

MMDA – Manali – Chennai:

Street light poles erection – 600 no’s

Cable laying & Termination.

AURO FOOD –Pondicherry:

Erection of 11Kv DP structure,Erection of Transformer Erection of HT & LT panel,Fabrication of cable trays,Fabrication of mounting frame for panel & DB,Installation of Lighting Arrester, Earth flat,Installation of Tube Light fitting,Cable laying, cable glanding & termination,Installation of earth pit and complete earthing work

ITC AGRO TECH – MANTRALATAM (A.P):

Erection of 11Kv DP structure,Erection of Transformer Erection of HT & LT panel,Fabrication of cable trays,Fabrication of mounting frame for pane & DB,Installation of Lighting Arrester, Earth flat,Installation of Tube Light fitting,Cable laying, cable glanding & termination,Installation of earth pit and complete earthing work

ASIAN PEROXIDE (A.P):

Installation of panels and DB,Installation of Light fitting Cable tray fabrication and erection,Cable laying & cable glanding and termination ARASU RUBBER CORPORATION:

Erection of 11Kv DP structure,Erection of Transformer Erection of HT & LT panel,Fabrication of cable trays,Fabrication of mounting frame for pane & DB,Installation of Lighting Arrester, Earth flat,Installation of Tube Light fitting Cable laying, cable glanding & termination,Installation of earth pit and complete earthing works

Chennai Petroleum Corporation:

Installation of Flood light & panels & DB.

Declaration:

I hereby declare that the above mentioned information’s are correct up to my knowledge and I bear the responsibility for the correctness for the above mentioned particulars.



Contact this candidate