RESUME
MoPersonal Information:
Position Applied : Registered Master Electrician
Name : Alberto B. Malaki
First Address : Hingatungan Silago Southern leyte
Second Address : Block 18 lot 6 P.1 casimiro town homes Deparo Caloocan city
Date of Birth : April 1, 1960 Civil Status : Married Citizenship: Filipino
Profession : Registered Master Electrician ( P.R.C.) No. 0013925
Pass port No. : P0515871B Issued 2 Feb, 2019 Expiration 01 Feb, 2029
Contact No. :cell#- ( +632) 099******** / (632-***-**-**
Company : Vendeka Information Technologies Trade Co. Ltd.Inc.
Project : NAIAX Skyway Toll Plaza, Star Toll Plaza South, TPlex Toll Plaza North.
Date held : Feb, 2015 to Present.
Position : Electrician I.T Installer and Preventive Maintenance.
Can read and interpret electrical drawing and electrical design Parameters, electrical installation guidelines & safety Rules in electrical code have formulated and develop to safeguard person & property from hazards arising from the use of electricity.
Installation of ALB electric motor, barriers, RFID, PR/PS Loop Sensors, (TFI) Toll Fare Indicator. OB sensors, HVD sensor, Probe 1 & probe 2 sensor,
Camera, OTL, Lane Switch, I/O board, VPC board, Treadle board, DSRC
Reader, UHF Reader, Data Cabinet. Data Server with Cabinet, cabling termination, UPS,
Assemble of LCS Panel. Testing and Commissioning.
Company : Electro System
Project : Melco MCE Leisure (Philippines) Corp. City of Dreams Manila.
Date Held : October 2014 to June 2015.
Position : SR. BMS Technician
Can read and interpret electrical drawing and electrical design Parameters, electrical installation guidelines & safety rules in electrical code have been formulated and develop to safeguard person & property from hazards arising from the use of electricity.
Assemble & examine the design of DDC BMS panel, transformer, Circuit Breakers, wiring design, Grounding system and the Controllers.
Install electrical pipes, brackets, Panels & wiring within or on to or from.
Install AHU Temperature Sensors, Current Switch, air sensors, water float switch, Master Controllers, BCX Controllers, AS controllers and many others.
Ensure all Panels installation and construction are efficient, convenient, or adequate for good service or in future expansion.
Testing and Commissioning all equipment and ensure communication signaling within equipment or on to BMS operator are Program Correctly.
Company : ( VAOS ) Value Added Oil Field Services
Project : ( ZOC ) Zueitina Oil Company / ( HOO ) Harouge Oil Operation & Total
Off Shore, Mabruk Oil Operation. ( MOO )
Date held : November 2006 to July 2015.
Position : Industrial Electrician
Can read and interpret electrical drawing and electrical design parameters, electrical installation guidelines and safety rules in electrical code have been formulated and develop to safeguard persons and property from hazard arising from the use of electricity.
Install, examine, replace defective electrical wiring, receptacles, switch, boxes, conduit, feeders, cable assemblies, lighting fixture, load computation and other electrical component.
Check & repair Electrical wirings, Temperature Sensors, Controllers, DC starting motors, Battery, UPS, Battery Chargers, & main contactor.
Daily check switchgear indication lamp, Volt meters, ampere meters, volt meters,
Test electrical electronics equipments, continuity, amperes, voltage, resistance and cable insulation test.
Conduct Preventive Corrective Maintenance and Monitoring and keep maintenance record.
Duties and Responsibilities;
Strict compliance with the electrical code will insure safety in electrical equipment installation and construction establishing basic materials quality and electrical work standard.
Upgrade operation of the entire gas plant from analog r to digital automation system with interface connection @ Programmable Logic Controllers (PLC) to main control center (MCC).
Pulling new instrument cables and electrical cables,
Installed Rosemount Smart Resistance Temperature Detectors, pressure liquid transmitter, Gas Flow Transmitter, steam flow transmitter, temperature transmitter, drum level transmitter, main bearing vibration transmitter, and automatic gas valve.
Installed console panel, computer monitor, internal component, wiring and tapping termination, loop checking insulation test.
Installed 12 mega watt Power Pack Gas turbine Generators three unit @ Zueitina gas plant.
Tapping and connection high, medium, and low voltage power cable from main control center (MCC ) to high voltage gas turbine generator side.
Connect medium voltage cable, signal cable @ control room, drawing, equipment wiring design as per as manufacturer design
Company : Edza temp. controller Allied Services.
Project ; Globe Telecommunication Company Deparo Caloocan City manila Philippine
Date Held : June 2004 to March 2006
Position : Industrial Electrician
Technical Engineer;
Responsible in operation maintenance of the entire plant.
Preventive corrective maintenance and monitoring in all support facilities electrical
Scheduling and coordinate daily activities in electrical technician and air con technician.
Supervise all electrical technician in his daily work
Company : Self Employed / Malaki Electrical & Air Conditioning Services.
Project : Taiyo Electronics Company / Air Born Air Fright Cargo Building
Date Held : Feb. 2004 to Augt. 1996
Position : Electrician & Air Con Technician
Supervise, coordinate and Scheduling daily activities and the date completion,
Performed preventive maintenance and service all air con of client.
Installation of electrical Piping, Lighting Fixture, Sockets, Distribution board, Split type air condition, Standby Diesel Generator, ( MTS ) manual Transfer Switch, cable Pulling, connection and tapping Entrance Power Cable .
Servicing Residential and Industrial, Air Con Over Hauling, Motor Overhauling, repair, and & Trouble Shooting, Freon Recharging and welding.
Company : YDS- engineering ltd. Hong Kong
Project : Check lap kok International air port Hong Kong.
Date Held : Augt.1996 to June 30, 1998
Position : Industrial Electrician ;
Responsible in electrical installation and construction establishing basic materials quality and electrical work standard
Responsible in tapping connection in high and low voltage bar duck from main control center (MCC) to sub station .
Installed main switchgear, housing compartment, high pot test and fixed internal bus bar .
Wiring connection signal and controller, control relay of the whole system.
Installed back up D.C power ( battery ) rectifier and wiring connection to MCC control circuit.
Company : Cargo Safe Way Inc. Sea Born Building Magsaysay blvd. sta. mesa manila.
Project : Seaman / MV / ACX Daisy / MV / Forrestal Esmeralda / & UniGlory Date Held : Augt. 1996 to January 1992
Position : FITTER / Electrician
Responsible in electrical and mechanical maintenance of entire ship.
Preventive corrective maintenance and monitoring all equipment deck side and engine side.
Repair all defective parts from electrical controller, motor, generators, oil purifier, automation system power system, transformer, Mcc, synchronizing two generators
Over haul cylinder head of the main engine.
Assist in overhauling of main engine.
Weekly Test run standby D,C generator without load.
Weekly fire drill, boat drill, and abandon ship..
Operate lathe machine and repair main parts of the main engine.
Maintain all Equipment in operational condition.
Company : ( AG&P) Atlantic Gulf & pacific Company Philippines.
Project : AZ Zawiya Oil Refinary Libya / Algeria Gas Plant / KNPC, KOC, Shuaiba LPG gas
Plant Kuawait.
Date Held : May 1990 to April 1981
Position : Industrial Electrician
Construction building of industrial gas plant, Refinery, shipbuilding, ship yard,
Read and interpret electrical drawing and electrical design parameters, electrical installation guidelines and
safety rules in electrical code have been formulated and develop to safe guard person and property from hazard arising from the use of electricity.
Installed switchboard and panel board, lighting fixtures, lamp holders, lamps and receptacles
Fixed motors, motor circuit controllers, branch overload protection, mechanical protection of conductors.
Tapping high voltage cable main power to substation.
Training and Seminars Attended
Title of Seminars: One Point System Technologies, PV. Solar Installation Training,
Place of Venue : No.26 Sto. Tomas St. Brgy. Don Manuel Quizon City.
Date Held : April 8, 9 & 10.
Quizon City.
Date Held : September 13, 2014
Title of seminars : Emergency Preparedness Course
Place of venue : imperial jade function rm. Robensdale hotel
aranita Avenue Quezon city.
Date held : September 16, 2005
Title of Seminar ; Safety & Environmental Management Policies
Procedures & Standard Orientation.
Place of Venue : Telecom Bldg. Canero Heights Sub, susano
Road caloocan city Philippines.
Date Held : October 04, 2005
Title of Seminars : Marine Engineer Support.
Place / venue : (TESDA)Technical Education & Skills development Authority.
Date Held : Augt. 22, 2001
Title of Seminars : Marine Electronic
Place Venue : National Maritime Polytechnic (Cabalawan Tacloban)
Date Held : January 31 to February 11,1999
Title of Seminars : Basic Safety Course / Fire Prevention & Fire Fighting / Elementary first Aid / Personal
Safety & Social Responsibility & Personal Survival Technique.
Place Venue : Admiral Maritime Institute of the Philippines sta. cruz Manila Philippines.
Date Held : June 28 to July 28, 2000
Educational Background
Course : Industrial Engineering ( undergraduate )
School : Leyte Institute of technology
Date held : June 1976
Course : Practical Electricity
School : Samson College of Science and Technology
Date Held : October 1979
Licensure Examination Taken
Title of License Exam : Registered Master Electrician
Date of Examination : June 1991
Rating : 80 %Exam
License No. : 0013925