Post Job Free

Resume

Sign in

Civil Supervisor/Light Truck or van driver/Forklift Operator

Location:
Quezon City, Philippines
Posted:
November 30, 2023

Contact this candidate

Resume:

RESUME

Position Applied:

PERSONAL DATA:

Name : Eduardo R. Pizarro

City Address : 84 7th St. Area 3 Veterans Village Brgy. Pasong Tamo,

Quezon City, Philippines

Cel. No. : +63-928-***-****

Date of Birth : June. 12, 1956

Place of Birth : Sta. Ana Manila, Philippines

Passport No. : P4878267C

Place Issue : DFA Manila

Date of Issue : August 2, 2023

Expiry Date : August 1,2033

Nationality : Filipino

Civil Status : Single

Height : 5’6

Weight : 175 lbs.

Religion : Roman Catholic

Sex : Male

Age : 67

Tax Account No. : 155-546-046

EDUCATIONAL ATTAINMENT:

Secondary Year Graduated : Ramon Avancena High School (1968-1972)

OTHER SKILLS:

Light truck and/or van driver

Forklift operator

WORK EXPERIENCE:

Company: WCT – Al Ali JV, July. 1, 2015 up to April 30, 2019

Job Description:

a) Supervision for removing all loose materials on ground level and installation of polyethylene sheet prior to pouring of concrete blinding.

b) Estimating of volume concrete for blinding and supervision for fabrication of stopper formwork prior to pour concrete blinding. Supervision for masonry works for casting of blinding.

c) Supervision for masonry works for surface preparation of blinding prior to waterproofing works

d) Supervision for fabrication wall formwork and installation for raft foundation, assist supervision for installation of rebar works for flooring. Column wall and partition wall for the raft foundation.

e) Estimating of volume concrete for pouring of raft foundation to the building and supervision for masonry work.

f) Supervision for fabrication of wall formwork on column and beam prior to installation of rebar works and estimating of concrete volume prior to casting of column wall and beam.

g) Supervision for fabrication of shuttering for beam and floor slab and assist for rebar works. Estimating of volume concrete for slab and beam prior to casting.

h) Supervision for layout of concrete hollow block and make right angle prior to installation of concrete hollow block on partition wall of room and office of the building and partition wall of toilet.

i) Supervision for installation of level pegs on partition wall of concrete hollow block on the office building and comfort room prior to plastering on wall.

j) Supervision for plastering work on partition wall of external and internal office building and room and raft plaster on comfort room prior to installation of ceramic wall and floor tiles on comfort room.

k) Supervision for installation of door jamb, panel door, and kitchen vanity. Supervision for external and internal painting work of the building.

Company: WCT – BERHAD, April. 2, 2011 up to June. 30, 2015

Job Description:

a) Supervision for removing all loose materials on ground level and installation of polyethylene sheet prior to pouring of concrete blinding.

b) Estimating of volume concrete for blinding and supervision for fabrication of stopper formwork prior to pour concrete blinding. Supervision for masonry works for casting of blinding.

c) Supervision for masonry works for surface preparation of blinding prior to waterproofing works.

d) Supervision for fabrication wall formwork and installation for raft foundation, assist supervision for installation of rebar works for flooring. Column wall and partition wall for the raft foundation.

e) Estimating of volume concrete for pouring of raft foundation to the building and supervision for masonry work.

f) Supervision for fabrication of wall formwork on column and beam prior to installation of rebar works and estimating of concrete volume prior to casting of column wall and beam.

g) Supervision for fabrication of shuttering for beam and floor slab and assist for rebar works. Estimating of volume concrete for slab and beam prior to casting.

h) Supervision for layout of concrete hollow block and make right angle prior to installation of concrete hollow block on partition wall of room and office of the building and partition wall of comfort room.

i) Supervision for installation of level pegs on partition wall of concrete hollow block on the office building and bathroom prior to plastering on wall.

j) Supervision for plastering work on partition wall of external and internal office building and room and raft plaster on comfort room prior to installation of ceramic wall and floor tiles on comfort room.

k) Supervision for installation of door jamb, panel door, and kitchen vanity. Supervision for external and internal painting work of the building.

Company: Cebarco – WCT W.L., March. 1, 2009 up to May. 8, 2010

a) Supervision for lay out and installation of concrete hollow blocks on partition walls of comfort room and staff office.

b) Supervision for plastering of external and internal wall, rough and finishing inside of the comfort room.

c) Supervision for lay out and installation of tiling work external and internal partition wall of comfort room and staff office and painting works, including carpenter works on Formula One Racing Circuit Project in Abu Dhabi UAE.

Company: Cebarco – WCT W.L., October. 27, 2007 up to April. 30, 2009

a) Supervision for lay out and installation of concrete hollow blocks on partition walls of comfort room and staff office.

b) Supervision for plastering of external and internal wall, rough and finishing inside of the comfort room.

c) Supervision for lay out and installation of tiling work external and internal partition wall of comfort room and staff office and food court, including carpenter and painting works on Bahrain Mall Project.

Company: Nesma & Alfadl Contracting Co., Ltd., October 6 – 1993 up to October. 29, 1995

a) Supervision for lay out and installation of concrete hollow blocks on partition walls of bathroom and staff office.

b) Supervision for plastering of external and internal wall, rough and finishing inside of the bathroom.

c) Supervision for lay out and installation of tiling work of internal partition wall of bathroom and staff office, including carpenter and painting works on Jubail Housing Project, KSA.

Company: Al – KHODARI & SONS CO., April 21, 1991 up to April. 5, 1993

a) Supervision for renovation on Saudi Aramco Housing Projects in Dhahran.

b) Supervision for demolition of old wood partition wall on ceiling, room, living room, dining room, kitchen, and bathroom and fix new ones according to the plan of housing project.

c) Supervision for plumbing work.

d) Supervision for installation of ordinary gypsum board on internal partition wall, ceiling, dining, and living room. Installation of waterproof gypsum board on partition bathroom.

e) Supervision of demolition of old roof panel and fix new one. Supervision for installation of ceramic wall and floor tiles on bathroom.

f) Supervision for removing old wood panel on external wall and fix new one.

g) Supervision for painting work, external and internal of the housing project and supervision for installation of carpet.

Company: ARABIAN HOMES, November. 23, 1989 up to October. 27, 1990.

a) Supervision of civil maintenance work for 120 housing project and plumbing work.

Company: AGP, ATLANTIC, GULF & PACIFIC COMPANY OF MANILA, INC., June. 23, 1984 up to June. 1, 1985

a) Supervision for installation of fire bricks, size 2”x4”x8”, inside the vessel and plastering at (KNPC) Kuwait National Petroleum Company Project in Kuwait.

b) Supervision for installation of fire bricks, size 2”x4”x8”, on partition wall, staff office and plastering.

c) Supervision for fabrication of formwork stopper for pathway and estimating concrete prior to casting. Supervision for masonry work.

Company: ZAHD INDUSTRIES & INVESTMENTS CO. LTD. NCR DIVISION., September. 12, 1981 up to September. 12, 1983.

a) Supervision for lay out and installation of concrete hollow blocks on partition walls of bathroom and staff office.

b) Supervision for plastering of external and internal wall, rough and finishing inside of the bathroom.

c) Supervision for lay out and installation of tiling work of internal partition wall of bathroom and staff office, including carpenter and painting works.



Contact this candidate