RESUME OF KEY PERSONNEL
MAGINCIO MONTERO CANO
Bangonay Jabonga Agusan Del Norte
Philippine Mobile No. +853********/+639*********
PERSONAL DATA:
Age: 46 years old
Birth Date: July 16, 1977
Birth Place: Bangonay Jabonga Agusan Del Norte
Civil Status: Married
Height: 5’6
Weight: 140 lbs.
Religion: Roman Catholic
Sex: Male
Citizenship: Filipino
Language: English, Tagalog, Visaya
EDUCATION ATTAINMENT:
Primary: Bangonay Elementary School (1984-1990)
Secondary: Santiago Nationalized High School (1990-1994)
KEY QUALIFICATIONS:
In Private: Eleven (11) Years Experience As A Surveyor
SPECIAL SKILLS:
Construction Helper/Land Surveyor
WORK EXPERIENCE:
2005 to 2007 Civil Surveyor
Kajima Corporation
Cebu South Coastal Road Project
Segment 3b-2 Subway Tunnel Section Project
Responsibilities:
Layout the locations of the set piles for the protection of the soil to avoid landslide.
During the pile driving, monitor the set pile if it is in the good verticality, and after check the elevation of the top of set pile when it is in the correct elevation by using level instrument.
Monitor and checking of elevaton during excavation of the soil.
Layout the limit of the road of the tunnel based on the drawing.
Check the concrete elevation if its exact based on the design elevation.
2007 to 2009 - Mechanical/Civil Surveyor
Gama Qatar
Qcs 282 Project
Gas Plant Industrial
Responsibilities:
Check the area if the foundation for piperack and shelter for mechanics has already prepare by the civil groups.
If its already prepare make re-survey if the foundation are in exact location, dimensions, distances and elevation.
Make survey for shimming on top of the foundations base on the drawing for the top of grout elevation and check if all are in the same elevation by using level instrument.
Make request for inspections of the foundation and elevation of the top of grout to the Q.C.
If the inspection has already approved by the Q.C. Give report to the supervision that the inspection has already approved so that they can proceed to erection of the steel, structure or shelter for the mechanics.
After erection of steel structure survey the verticality, plumpness, alignment and elevation on top of the steel based on the drawing.
After survey make a report for inspection the alignment of the steel structure to the Q.C. Before tightening.
2010 to 2012 – Mechanical/Civil Surveyor
Daewoo E & C
Algeria Oman Fertilizer Project (AOFP)
Responsibilities:
Check the area if the foundation has already prepared by the civil groups.
If it is already prepared we layout the location of the center line of foundation and top padding elevation based on the drawing design by using level instrument and total station.
Make request for inspection of the foundation and elevation of the top of grout to the Q.C. Inspector.
If the inspection has already accepted by the Q.C. Inspector we inform to the supervision so that can proceed to erection of the steel structure of mechanical equipment.
After erection of steel structure checking the verticality plumpness alignment and checking the top elevation of the steel based on the drawing design.
After erection of mechanical equipment checking the centering and elevation of the top skid equipment based on the drawing design.
After survey make report for inspection the alignment of the steel structure before tightening.
Make report for inspection the centering and levelling of the top of the skid equipment.
If inspection has already accepted by the Q.C. Inspector we inform to the supervision so that can proceed to grouting of the foundation.
2012 to 2013 - Mechanical Surveyor
Sungchang & Abdullah Al- Shaikh
Contracting Co., LTD
Rabigh Power Plant No. 2
Responsibilities:
Check the area if the foundation for piperack and shelter for mechanics has already prepare by the civil groups.
If its already prepare make re-survey if the foundation are in exact location, dimensions, distances and elevation.
Make survey for shimming on top of the foundations base on the drawing for the top of grout elevation and check if all are in the same elevation by using level instrument.
If the inspection has already approved by the Q.C. give report to the supervision that the inspection has already approved so that they can proceed to erection of the steel, structure or shelter for the mechanics.
After erection of steel structure survey the verticality, plumpness, alignment and elevation on top of the steel based on the drawing.
After survey make a report for inspection the alignment of the steel structure to the Q.C. before tightening.
2014 to 2015 - Structural/Mechanical/UG Piping Surveyor
Woolim Plant
Engineering and Construction Cooperation,LTD.
COTE D IVOIRE, Yopougon Azito IMM.
Power Plant
Responsibilities:
Check the area if the foundation for piperack and shelter for mechanics has already prepare by the civil groups.
If its already prepare make re-survey if the foundation are in exact location, dimensions, distances and elevation.
Make survey for shimming on top of the foundations base on the drawing for the top of grout elevation and check if all are in the same elevation by using level instrument.
If the inspection has already approved by the Q.C. give report to the supervision that the inspection has already approved so that they can proceed to erection of the steel, structure or shelter for the mechanics.
After erection of steel structure survey the verticality, plumpness, alignment and elevation on top of the steel based on the drawing.
After survey make a report for inspection the alignment of the steel structure to the Q.C. before tightening.
2015 to 2018 - Structural/Mechanical/UG Piping Surveyor
Daewoo Engeneering Construction
Saudi Jazan Refinery (APC 12)
Responsibilities:
Check the area if the foundation for piperack and shelter for mechanics has already prepare by the civil groups.
If its already prepare make re-survey if the foundation are in exact location, dimensions, distances and elevation.
Make survey for shimming on top of the foundations base on the drawing for the top of grout elevation and check if all are in the same elevation by using level instrument.
If the inspection has already approved by the Q.C. give report to the supervision that the inspection has already approved so that they can proceed to erection of the steel, structure or shelter for the mechanics.
After erection of steel structure survey the verticality, plumpness, alignment and elevation on top of the steel based on the drawing.
After survey make a report for inspection the alignment of the steel structure to the Q.C. before tightening.
INSTRUMENT TO OPERATE:
Total Station Leica 805 & 705 & Sokkia
Theodolite
Auto Level
REFERENCES:
Engr. Serhan Eryasar
Chief Survey EngineerI
Gama Qatar, QCS Project
Cell. No. +974*******
Engr. Rosito Omboy
Head Engineer/Chief Surveyor
Kajima Corporation
I hereby declare that the information stated above are true and correct done in good faith verified by me and the best of my knowledge and ability.
Magincio Montero Cano
Applicant Signature