Post Job Free

Resume

Sign in

Production Manager Planning

Location:
Ahmedabad, Gujarat, India
Posted:
November 25, 2023

Contact this candidate

Resume:

Profile :

Seeking position in Production Planning/Designing, utilizing stronge academic

background, knowledge & excellent interpersonal skills to be a part of the organization that expose myself in competitive environment with challenging career and offers professional growth.

Paresh S. Panchal

Production Manager Employment History :

Production Manager, Rolastar Pvt. Ltd., Bilimora, India. Contact Address : July-2017 - Present

Flat No.-102, Maganlal Residency-2, • To handle HVAC projects as per client’s requirement & its production planning B/h Sulabh Apt., Tithal Cross Road, as per delivery schedule. Valsad - 396001, Gujarat, India. • Monthly target achieve for HVAC ducting manufacturing & it's accessories.

• In month end raw material planning for next month’s project. Details : • Doing site activities for HVAC duct installation & gave suggestion to

+91-963******* sub-contractor as per client’s requirements. ad1fuu@r.postjobfree.com • Supervision in shop floor for quality checking of all fabricated parts.

• Accountable for customer’s satisfaction.

Skills :

Strategic Planning Asst. Production Manager, Leminar Air Conditioning Industries LLC, Dubai, UAE.

Production Planning October-2016 to June-2017

• To handle HVAC projects as per client’s requirement & its production planning Communication Skills as per delivery schedule.

• Monthly target achieve for HVAC ducting manufacturing & it's accessories. Sales Analysis • Doing site activities for HVAC duct installation & gave suggestion to sub-contractor as per client’s requirements.

Market Survey • Supervision in shop floor for quality checking of all fabricated parts.

• Prepare production report, performance report, dispatch report, etc… Vendor Development • Accountable for sound relation with suppliers, sub-contractors, competitors

& other departments within the company with staff & owners. Cost Cutting

Production Manager, Al-Shera'a Air Condit., Riyadh, Saudi Arabia. August-2014 to August-2016

Languages : • To handle HVAC projects as per client’s requirement & its production planning Hindi as per delivery schedule.

• Monthly target achieve for HVAC ducting manufacturing & it's accessories. Gujarati • Doing site activities for HVAC duct installation & gave suggestion to sub-contractor as per client’s requirements.

English • Preparing quotations & cost estimations of client’s tenders.

• Prepare production report, performance report, dispatch report, etc…

• Accountable for department growth in terms of sales volume, diversification, Hobbies : profit and preparation of plans to achieve the set goals. Travelling • Accountable for customer’s satisfaction. Watch Movie • Accountable for all accounts receivables and payables. Education : Continue with Employment History :

Diploma in Mechanical Engineering Senior Engineer, Rolastar Pvt. Ltd., Bilimora, India. Government Polytechnic, Valsad August-2008 to August-2014 August-1998 to November-2002 • To handle HVAC projects as per client’s requirement & its production planning as per delivery schedule.

Mechanical Course • Monthly target achieve for HVAC ducting manufacturing & it's accessories. Industrial Training Institute, Bilimora • To handle the man power & planning for shift scheduling. July-1992 to July-1994 • Doing site activities for HVAC duct installation & gave suggestion to sub-contractor as per client’s requirements.

Mechanical Course • Supervision in shop floor for quality checking of all fabricated parts. Navin Fluorine Industries, Bhestan • Preparing quotations & cost estimations of client’s tender for HVAC projects. October-1994 to October-1995

Production Engineer, Bader Almulla & Brothers WLL, Kuwait. References : April-2005 to June-2008

Mr. Khalid Abdul Karim • To handle HVAC projects as per client’s requirement & its production planning Al-Shera'a Air Conditioning-Riyadh as per delivery schedule.

+966-********* • Preparing quotations & cost estimations of client’s tender for HVAC projects. ad1fuu@r.postjobfree.com • To handle the man power & planning for shift scheduling.

• Doing site activities for HVAC duct installation & gave suggestion to Courses : sub-contractor as per client’s requirements. AutoCAD R-10 • Supervision in shop floor for quality checking of all fabricated parts. Aptech Computer Education, Bilimora

May-1995 to July-1995 AutoCAD Operator, Industrial Boilers Ltd., Vapi, India. December-1998 to April-2005

Passport Details : • Prepared fabrication drawings for high & low pressure boilers as per IBR. Number - S 5652424 • Prepared fabrication drawings of boiler accessories like multi cyclone dust Issue Date - 18-10-2018 collectors, economizers, super heaters, air pre-heaters, storage tanks. Expiry Date - 17-10-2028 • Prepared drawings of general & civil arrangement for boiler house & isometric steam pipelines.

AutoCAD Operator, Naran Lala Ltd., Navsari, India. October-1995 to December-1998

• Weight calculation of this both process plant equipment like distillation columns, heat exchangers, pressure vessels, reactors, storage tanks, etc…

• Prepared fabrication drawings for distillation columns, heat exchangers, pressure vessels, reactors as per standard.

• Prepared fabrication drawings of storage tanks as per API standard & miscellaneous items.

Apprentice Draughtsman, Navin Fluorine Ind., Bhestan, India. October-1994 to October-1995

• Prepared fabrication drawings for repairable parts.

• Weight calculation of process plant equipment.

• Preparing monthly documents for records of all types of above products.



Contact this candidate