NAME: Mahmoud Abdul Karim Qasem
MEP Manager
Address: P.O.Box:24174. Doha, Qatar Nationality: Jordanian
Date of Birth: xxxxx
E-mail:- ********@*****.*** Mobile: +974-****-****
PROFILE SUMMARY
I am capable in Project Planning and overall Management, also in Design and Execution Management and have an excellent experience in reviewing drawings and specializes on Engineering/Consulting Services, Procurement, Resource Estimation, High rise buildings, Hotels & Infrastructure works, Mechanical pumps room, Strom water &,Drainage piping Systems, MV / LV Cables, Street Lighting,High mast lighting, HV Panels & Transformer Installations (11 kV), Technical Support and Site Supervision & Management.
I am mainly responsible in the coordination of MEP works & in-house Infrastructure Team & Subcontractors, Team and Manpower Management, QS/QA/QC, Contracts Codes & Standards. Develops strategic electrical plans by studying operational plans; studying existing conditions; determining needs to accomplish operational plans; mapping solutions; updating and modifying requirements and solutions; preparing cost estimates and budgets
EDUCATION
Diploma in Electrical Engineering.
V.I.C. Kalandia College – Jerusalem
Jerusalem (1974 – 76)
Nixon University-USA (1997)
B.S of Electrical Engineering
PROFESSIONAL EXPERIENCE
Harinsa contracting Company
From Nov-2018 till to date
MEP Manager
Strom Construction LLC
MEP Manager
From Aug 2017 to Nov 2018
Meinhardt (Singapore) PTE LTD – Qatar
Electrical Design Manager
Aug 2016 – July 2017
Qatar Electro Mechanical Group
Operations & Technical Support Manager
2000 – 2016
Faddan General Trading & Contracting Co., - Kuwait
Electrical Engineer
1978 – 2000
Duties and Responsibilities:
Coordinate the project activities with the project management teams (Working schedule, Manpower schedule & Cash-flow chart, contracts), consultants, architects and clients, firm up the project requirements and design complete MEP systems generated by the project team, providing technical expertise and guidance.
Verify material quantity take off and timely order of the materials and equipment as per project requirement, re-check and correct all shop drawings.
Develop team spirit amongst the project, design and site engineers, site supervisors through extensive interactions.
Value engineering for achieving better efficiency in conjunction with cost savings without compromise on quality.
Organize weekly site meetings with the team, allot weekly targets and assignments as per construction program, review the executed work, identify and resolve operational problems.
Monitor and expedite the project activities, through technical guidance.
Monitor the installation, testing & commissioning of various MEP systems.
Monitor the timely preparation of bills for executed work, check, verify, certify and submit for payment.
Monitor and control the project cost.
Enhance the skills and competencies of the project, design and site engineers, site supervisors through personal interactions and training sessions.
Execute the project within the time schedules through team motivation.
Closely monitoring MEP Project planning and overall Management, Design and Execution Ongoing Projects
Key Projects:-
Strom Construction.
Al Bait Stadium, Infra structure works,external chilled water system, Drainage system water, storm water, electrical works MV networks,ELV & cctv System and electrical sub-stations, Training fields lighting, and 5 no’s public space buildings.
Al wakra Beach, installation of all MEP works for 18 service buildings, (toilets, guard rooms, Cafeterias, along the beach.
Steel Factory at new industrial area, All MEP works for 2500m2 steel factory for AL jabber steel.
Estimations for all MEP works.
Meinhardt:
Design and supervision of the projects:-
City center Najma (2 Hotels and mall total 330,000 M2.)
Al Sadd commercial and offices building and two floors shopping center.
Arwa Tower. 41 floor hotel apartments.
Al seelya Tower.35 floors hotel apartments
Qatar Electro Mechanical Group:
Breeding Farm Project (Contract Value QRs. 90,500,000)(from Oct. 2011- Oct 2014 )
Barzan Camp 2 – Barracks Project (Contract Value QRs.170,500,000) (from 01 Oct. 2012)
TB Hospital Project (Contract Value QRs.35,500,000)(from 22 Oct. 2012)
Al Jazeera Arabic Channel Extension Project Contract Value QRs.26,300,000)(from 18 May 2013)
Lusail Mix 050 Tower (3B+G+22) (Contract Value QRs.37,760,000) - (from 22 Jan. 2014)
Lusail com 20 Tower (3B+G+27) Contract Value QRs.46,532,000) (from 21 Sep 2014)
Intercontinental Hotel Doha city Project from 2011-2013( contract value QRs 154 000000)
Crown Plaza hotel Doha .project from2010-2012 .(total contract value QRs160,000,000 )
Barzan Camp -01 construction of 44 No’s with all amenities service buildings, sub-stations, pumps stations residential buildings for Amiri Guard (total contract value 130,000,000.)
Completed Projects:
Qatar National Olympic Committee- State of Qatar.2nd grade sports clubs
Nissan Stock Yard
Q-Chem Project-Ware House Project 42,000M2 (From Jun 2000 to Jan 2002)
HVAC Upgrades & Electrical Upgrade, US Army Forces
MPS 214 Relocation Project (from Mar 2004 to Apr 2004)
CAOC Electrical Survey at Al Udeid Air Base (from Apr 2004 to May 2004)
Coalition City Swimming Pool Complex (from Feb 2004 to Aug 2004)
BMW used cars Showroom (from Oct 2004 to Feb 2005)
Roads Street Lighting Project, North Maither Area No. 5 & 6 (from June 2004 to June 2005)
Multi-Purpose Gymnasium Hall (Al Udeid Air Base – US Air Force)
BTT Factory at New Industrial Area-Project Manager (from Jan 2008 to Nov 2008)
Al Mana Res/Office Towers 1B+GF+18– Project Manager (from Mar 2006 to Oct 2008)
13 Floor Residents .Tower- 2B+GF+14 Floors, Al Safwa Royal Hotel - Project Manager (from Sep 2006 to April 2008)
Al Dana Tower, All MEP works – Project Manager (.2006-2008.)
La Cigale Hotel Car Parking 1B+GF+10 Floors - Project Manage (from 2008 to 2010)
Viva Bahriya VB 11 & VB 17 - Operations Manager (from 2010 to 2012)
Al Rames Tower 2B+G+35 – Operations Manager (from 2008 to 2010)
Silhouette Tower 2B+G+M+60 – Operations Manager (from 2009 to 2011)
Business Park &crown Plaza Hotel Facilities - Operations Manager (from 2010 to 2012)
Barzan Camp 1– Operations Manager (from 2010 to 2012)
Faddan General Trading & Contracting Co., - Kuwait
MEW Street Lighting (Hadiya and Ardiya)
RA 410 First Ring Road and RA145: 5th Ring Road Motor Ways- High mast street lighting
Installation of Horse Racing Photo Finish Camera System (OMEGA) for Al-Ahmadi Horse Racing Club
Electrical work shop assembly of switch gear
Doha Power Station Project (East)
MEW Street Lighting for High Mast lighting at South Area Kuwait
Al Qadesya multi propose sports hall
Renovation of KTC Building
KNPC Mina Abdulla Renovation of Refinery revamp of oil crude units.
Kuwait University Stadium Shawaikh external electrical works structure
Shaha Commercial Complex
RA102, RA32, RA144,RA 46 Kuwait High Ways, All Electrical Works and infrastructure
Stadium lighting and electrical works for:
Al-Sahel Sports Club,
Al-Nasser Sports Club,
Al-Salmiya Sports Club,
Al-Jahra Sports Club, Kuwait
AL Yarmouk stadium.
UMM Al-Heiman Housing Project - All external electrical works infrastructure, 11kv, MV substations.
Bubyan Chemical Plastic Factory - Electrical wiring installation
PROFESSIONAL COURSES/ CREDITS/ MEMBERSHIPS
60 hrs. HVAC fundamental course.
12 hrs. Firefighting seminar. –Doha
PROFESSIONAL SKILLS
Leadership Skill
Problem Solving Skill
Decision Making Skill
Time Management.
Self-motivation.
Conflict Resolution.
Coordination
Adaptability.
Oversight
Planning
COMPUTER SKILLS
Microsoft Word
Microsoft Excel
Microsoft Outlook
Microsoft Power point
AutoCAD (2D & 3D)
Adobe Acrobat reader Professional
LANGUAGES
Arabic: Mother Language
English: Fluent