Post Job Free

Resume

Sign in

Electrical Engineer Project Manager

Location:
Danao, 5000, Philippines
Posted:
November 21, 2023

Contact this candidate

Resume:

Mobile: 092********

Home: ***A Delgado St., Brgy. Mabolo, Iloilo City, 5000 Philippines

Email: ad1cuk@r.postjobfree.com

PERSONAL INFORMATION

Birthday : September 5, 1967

Birthplace : Pasig City

Sex : Male

Civil Status : Married

Religion : Roman Catholic

RACEL MANZANA CRUZ

PROJECT MANAGER

SR. ELECTRICAL ENGINEER

REGISTERED

ELECTRICAL ENGINEER

WORK EXPERIENCE SUMMARY:

- Graduate of Electrical Engineering with 28 years overall Experience including 13 years in (PMC Works for EPCC Works) and 15 years in Main Contractor (EPCC Works). Projects: Oil & Gas (Common Sulfur, LNG & Onshore/Offshore), Power Plants (Combine Cycle Gas & Steam, Coal Fired Thermal, & Coal/Pet), Renewable Energy (Solar PV & BESS), Refineries (Coker), Infrastructure (Airport, US Embassy/Consulate, Water Treatment Plant, Substation, Transmission & Distribution), High-rise Building, Telecom System, Cell Site Towers, Villas Works.

BRIEF LISTING OF AREAS OF EXPERTISE:

Electrical Engineering

Project/Site Manager

Consultancy/Owner/Resident Engineer

Engineering Procurement Construction & Commissioning

Greenfield & Brownfield Project

Project Management Construction/Consulting (PMC)

Planning/Supervision/Implementation/Inspection

SEMINARS:

- Cable Splicing Seminar & Protective Relaying Seminar (IIEE) 1989

3M Philippines-Jacinto Building EDSA, Makati City, Philippines

- Occupational Safety and Health Administration (OSHA) 1999

- Permit Required Confined Space (OSHA) 1999

J.A. Jones Construction San Nicolas, Aruba Dutch Caribbean

- High Voltage Cable Splicing Seminar (J.A. Jones) 1999

J.A. Jones Construction San Nicolas, Aruba Dutch Caribbean

- QMS 9001 : 2002 Foundation Training 2002

SGS International Services - Jeddah, Kingdom of Saudi Arabia

- Construction Industry Development Board 2004

Lembaga Pembangunan Industri Pembinaan Malaysia

- LEED Green Associate Seminar 2013

Green Engineer Training Center – Doha, Qatar

- 2nd Post Arrival Orientation and Health and Safety Seminar 2015

SBQ – Qatar

- ProjNet Training 2019

US Department of State (Bureu of Overseas Buildings Operations)– Fiji

EDUCATION

Course: Bachelor of Science in Electrical Engineering

School: National University

Year Graduate: 1990

Location: Manila, Philippines

REGISTRATION/AFFILIATIONS:

-Institute of Integrated Electrical Engineer (IIEE)

-Leadership in Energy and Environmental Design (LEED) Green Associate

-Occupational Safety and Health Administration (OSHA)

-Construction Industry Development Board Malaysia

INTERNATIONAL & LOCAL LOCATION EXPERIENCE:

Philippines, Malaysia, Aruba, Saudi Arabia, Ghana, Qatar, Jordan, and Fiji

SKILLS:

Project Management Construction/Consulting (PMC) and Engineering Procurement Construction & Commissioning (EPCC) Works.

Proficiency in using PC for basic software applications such as Microsoft Office (Excel, Word, Project, Outlook, and Power Point). Knowledgeable in using multiple specific applications such as Teams, Zoom, PDF & AutoCAD

WORK EXPERIENCE

Time

October 2020 to Present

Employer

First Balfour

Location

Paraňaque City, Philippines

Position

Major Project Undertaken

Project Manager

-Battery Energy Storage System (BESS) Tongonan Leyte

-NGCP South Luzon Substation Upgrading Project 2 Schedule 1 (Gumaca, Labo & Lumban)

-NGCP South Luzon Substation Upgrading Project 2 Schedule 3 (Lumban, Gumaca, Labo, Naga, Daraga, Tiwi A & C)

-Interconnection between UPSI-BESS & NGCP Lumban 69KV Substation

Duties & Responsibilities

Assign as Project Manager for the Engineering, Procurement, Construction and Commissioning Work (EPCC).

Provides managerial and technical supervision of the overall planning, execution, monitoring and control of the project activities.

Responsible for ensuring achievement of the Project's SHE, Quality, Time & Cost targets.

Directs the review and implementation of budgets, detailed schedules, work plans and manpower projections & Resolves project delay problems.

Handles the organizing, staffing, and updating of the project table of organization in coordination of HR.

Manages client relationships & meets with client regularly regarding project concerns.

Oversees and ensures that safety programs are properly implemented in project site.

Provides regular, timely, and accurate reports to the Area Manager and Project Director and raises issues & concern.

Ensures compliance with permits, licenses, and other statutory requirements.

Complies with the proper operating procedures of safety and health standards/ regulations.

Supports and implements Environmental Management System with respect to their job.

Adheres to policies/ procedures, Employee Code of Ethics and Conducts, and Corporate Governance.

Protects intellectual property, company propriety and there be any.

Ensures compliance with permits, licenses, and other statutory requirements.

Complies with the proper operating procedures of safety and health standards/ regulations.

Supports and implements Environmental Management System with respect to their job.

Adheres to policies/ procedures, Employee Code of Ethics and Conducts, and Corporate Governance.

Protects intellectual property, company propriety

Time

January 2018 to January 2020

Employer

Arkel International LLC

Location

Suva, Fiji Island

Position

Senior Electrical Engineer

Major Project Undertaken

U.S. Embassy Suva Fiji Look-back Warehouse & Site Upgrades Project

Duties & Responsibilities

Assign as Electrical Superintendent/Engineer for the Engineering, Procurement, Construction and Commissioning Work (EPCC). The project consists of Warehouse, Recreation, Transfer, SCAC, WWTP & Fire Pump Area.

Responsible for the overall implement and supervision of construction and erection activities for Electrical System.

Conducting feasibility studies to estimate materials, time and labor costs.

Coordinate to Client OBO prior for approval of shop drawings, Materials, specification, Testing & Commissioning.

Time

January 2016 to October 2017

Employer

Black & Veatch International

Location

Amman, Jordan

Position

Senior Electrical Field Engineer

Major Project Undertaken

- 1x30MW net Coal/Pet Coke, Power Plant

Manaseer Modern Cement and Mining Co. Ltd Jordan

Duties & Responsibilities

Assigned as Owner Engineer/ Project Management Construction/Consultant (PMC) for Electrical Works of Power Plant for Engineering, Procurement, Construction and Commissioning work (EPCC). The Plant consist of Turbine Generator, Water Treatment Plant, Boiler, Fuel Handling System, Air Cooled Condenser, Fin Fan Cooler, Diesel Generator, Crusher/Stocker Reclaimer/Conveyor Yard, Bed/Fly ASH Silo, Powerhouse Bldg. Power Transformer, Auxiliary & Converter Transformer, Fin Fan Cooler, Air Compressor Bldg. Admin and Workshop Bldg.

My scope to develop the Engineering Management Responsible for PMC Project including Project Execution Plan, Develop Engineering Schedule, Coordinate of EPCC Contractor activities

Responsible for the overall Supervision & Inspection of EPCC Contractor.

Monitor and review scope changes of EPCC Contractor to PMC to minimize potential claims.

Monitor and provide comment for clearance of hazop actions and design review changes

Implement project procedures to ensure an effective and efficient system for safety, quality, cost and schedule.

Review of engineering submittals i.e., Project Drawings, Vendor Drawings, Material and Design/Detail Design.

Participate in EPCC Contractors Project specific reviews, Technical Integrity Review, Commissioning Plan Review, Safety and Risk Review and Inspection and testing.

Time

November 2009 to November 2015

Employer

Alonso, Hernandez & Asociados S.L. (ah)

Location

Doha, Qatar

Position

Site Manager

Major Project Undertaken

-TJ Pearl Mansion

-800MW Al kharsaah Solar PV Power Project

-New Doha International Airport (NDIA) Airline Operation Facilities - CP-65

-New Villa Umm Salal, Villa A & B + Majlis + Mosque + Service Bdg. + Substation

-26th Storey Viva Bharya 18 Building Project in Pearl Qatar

-Umm Birka Super Substation Supply – 400/220/132/11 KV

Duties & Responsibilities

As the Site Manager I will oversee the site supervision team and report to Head Project Manager.

Responsible for the management of all the construction activities on site during construction phase of the project.

Responsible for project progress in terms of schedule, workmanship, and cost during construction period.

Manage site team to ensure that the works are carried out by the contractors in accordance with

Assigned for Project Management Construction/Consultant (PMC) of Power Distribution/Transmission/Utilities, High Rise Building, Interior Design, and Infrastructure (Substation) of Engineering Engineering-Procurement-Construction and Commissioning works (EPCC) of Electrical System

Responsible for the management of all the construction activities on site during the construction phase of the Project.

Responsible for project progress in terms of schedule, workmanship, and cost during construction period.

Manage site team to ensure that the works are carried out by the contractors in accordance with the Contract Specifications, Drawings, and all other requirements of the Construction Contracts. Exercise all necessary supervision to ensure that the Employer’s interests are protected.

Liaise with the Employer’s representatives, Project Engineering Team, EPC Contractors, subcontractors, and suppliers to resolve all design details, construction issues and material selection during the construction stage.

Review with the Employer and Project Engineering Team on approval of all: Main and Sub-Contractors’ submissions for approval, Delivery schedules, Material lists, Shop drawings, Samples, coordinate with specialist consultants and the contractor on all construction matters concerning (procedures, progress, constraints, scheduling, monitor the schedule and planning of the project).

Ensure compliance by the contractor on proper work procedure during the construction period. Procedures include: (Daily logs, progress schedule, manpower breakdowns, quantities, material list, shop drawing logs, safety programme.

Maintain an accurate record of all tests and inspections conducted, findings, and test report.

Time

June 2007 to October 2009

Employer

Washington Group & Al Jaber Energy Consortium

Location

Ras Laffan, Qatar

Position

Senior Electrical Engineer

Major Project Undertaken

Qatar Gas - Common Sulfur Project(Qatar Liquefied Gas Company Limited) – Ras Laffan

Duties & Responsibilities

Assigned for Project Management Construction/Consultant (PMC) for Engineering-Procurement-Construction and Commissioning works (EPCC) of Electrical System.

Provider of engineering submittals i.e. Project Drawings, Vendor Drawings, Material and Design/Detail Design.

Supervision, Inspection & Implementation works for various Electrical Installation.

Coordinate to client for managing the costs on a construction project. Helping to ensure that the construction project is completed within its projected budget. ... price/forecast the cost of the different materials needed for the project.

Attend the project meetings including - Monthly design and coordination meetings.

Coordinate to Client Qatar Gas, Kharamaa, Qtel & Civil Defense prior for approval of shop drawings, Materials, specification, Testing & Commissioning.

Time

May 2005 to May 2007

Employer

B.L. Harbert International, L.L.C

Location

Accra, Ghana, West Africa

Position

Electrical Field Superintendent

Major Project Undertaken

- United State of America Embassy (New Embassy Compound Project)

Duties & Responsibilities

The company is Main Contractor and assign as Electrical Field Superintendent for the Engineering, Procurement, Construction and Commissioning Work (EPCC). The project consists of NOB, SCAC, MCAC, MSGQ, Street Light, 9KV Substation, Water Treatment and Playground.

Responsible for the overall implement and supervision of construction and erection activities for Electrical System.

Coordinate to Client OBO prior for approval of shop drawings, Materials, specification, Testing & Commissioning.

Time

September 2003 to April 2005

Employer

Hyundai Doz (M) Sdn Bhd

Location

Tanjung Bin, Malaysia

Position

Project Engineer

Major Project Undertaken

- 3x700MW Coal Fired Power Plant, Tanjung Bin, Johor

- Tanjung Bin & Bukit Batu 500/275KV Substation

Duties & Responsibilities

The company is Main Contractor and assign as Planning & Control Engineer, Quality Control and Quantity Surveyor for the whole project.

Coordinate for Client (Toshiba), Sub-con (Civil / Electrical) & Supplier about Engineering, Procurement, Construction & Commissioning works (EPCC).

Manage the costs on a construction project.

Seek to minimize the costs of the project and enhance value for money I ensuring that the project meets all legal and quality assurance requirements and regulations. Prepare tender documents, contracts, budgets, bills of quantities and other documentation.

Time

November 2000 to July 2003

Employer

Hassan A. K. Algahtani (HAK) Group

Location

Al Kahfji of Saudi Arabia

Position

Electrical Engineer (Owner Engineer)

Major Project Undertaken

Kuwait Gulf Oil Company (KGOC) and Aramco Gulf Operations Company (AGOC) Facilities

Duties & Responsibilities

Assign as Owner Engineer/ Project Management Construction/Consultant (PMC) for Electrical Works for ONSHORE (Crude Desalting Plant, Crude Storage Plant, Gas Oil Separator, Sea Water Desalination Plant, Power Plant, Gas Oil Separator, Disposal System & Head Office) and OFFSHORE facilities (Gathering Station, Flow Stations & Wells).

Assigned for Front End Engineering Design (FEED) & Engineering-Procurement-Construction and Commissioning works (EPCC) for Electrical System.

Supervision & Inspection of various electrical installation .

Coordinate to contractor for managing the costs on a construction project. Helping to ensure that the construction project is completed within its projected budget

Pre –commissioning and Commissioning of Electrical System.

Coordinate to Contractor & Supplier prior for approval of shop drawings, Materials, specification, Testing & Commissioning.

Time

March 1999 to February 2000

Employer

ABB Lummus & J.A. Jones Construction

Location

San Nicholas, Aruba, Dutch Caribbean

Position

Electrical & Instrumentation Assistant Superintendent

Major Project Undertaken

- Coastal Aruba Coker Refining Company- Aruba Capacity Expansion Project

Duties & Responsibilities

The company is Main Contractor and assign as Electrical & Instrumentation Assistant Superintendent for Inspection and installation of electrical & instrumentation works.

Responsible for any modification and rectification on site electrical and Instrumentation related job and making general inspection of the equipment wiring, connection labels and so on.

Coordinate to Client & Consultant prior for approval of Electrical Works.

Time

September 1996 to July 1998

Employer

Azdaman Engineering Sdn Bhd

Location

Petaling Jaya, Malaysia

Position

Electrical Engineer

Major Company & Project Undertaken

- HENZ Construction –Harbert-Esprit-Namfat-Zaq (Joint Venture)

- SUMATEC Corporation Sdn. Bhd. Contract Department (Head office)

Major Project Undertaken

- Kuala Lumpur City Center (PETRONAS Tower) Car Park & Retail Podium

- Kuala Lumpur International Airport Co-Generation Plant

Duties & Responsibilities

The company is Main Contractor and assign as Construction Engineer, Quality Control & Inspector for distribution, Planning and Manpower Management Coordinator, Planning/Scheduling Engineer, coordinator, Inspection & Supervision of various electrical installation.

Responsible for all aspects of the contractual and financial side of construction projects. Manage the costs & Tendering on a construction project. Attend bidding to the client.

Coordinate to Client, Consultant, Material Management, AG&P Civil, Mechanical Division, other Sub-contractor and supervise for implementation works and approval of shop drawings, Materials, specification, Testing & Commissioning.

Time

January 1992 to October 1995

Employer

Atlantic Gulf & Pacific

Location

Makati City, Philippines

Position

Electrical Engineer

Major Project Undertaken

-1x300MW Batangas Coal Fired Thermal Power Plant II Project

-2x300MW Bataan Combined Cycle Power Plant (BCCPP)

-24th Storey Makati Commercial Center Building Project (MCC)

Duties & Responsibilities

The company is Main Contractor and assign as Construction Engineer, Quality Control & Inspector for distribution, Planning and Manpower Management Coordinator, Scheduling Engineer, coordinator, Inspection & Supervision of various electrical installation.

Coordinate to client for managing the costs on a construction project. Helping to ensure that the construction project is completed within its projected budget.

Manage the Progress, costs & Tendering on a construction project. Attend bidding to the client.

Coordinate to Client, Consultant, Material Management, AG&P Civil, Mechanical Division, other Sub-contractor and supervise for implementation works and approval of shop drawings, Materials, specification, Testing & Commissioning.



Contact this candidate