** ***** ** ********* ********** in all aspects of document controlling procedures utilizing various computer programs. During this period, have been tasked to handle document control department for large projects and was assigned from Document Controller. Capable in PC troubleshooting, operation of applicable software’s and proficient in typing with speed and accuracy. Well versed on Windows programs like MSWord, MSExcel, Outlook and PowerPoint. Capable to generate program using MS Access and familiar in Networking, EDMS
With Saudi Arabia Driver Licensed
PROFESSIONAL EXPERIENCE:
Present Projects
1.Zuhair Fayez & Associates Architectural & Engineering Consultants
2.December 2009 – Present
3.Project Management Team
DOCUMENT CONTROLLER
Project Title: Supervision of KKU Male Collage Projects (Phase I) for King Khalid University in Abha
Contract No. J08-13701
Project Man Hours 3yrs
Project Budget: 3 Billion SR
Ongoing Project
Project Title: Supervision of KKU Medical College Project (Phase II) for King Khalid University in Abha (700 Beds)
Contract No. J10-03600
Project Man Hours 3yrs
Project Budget: 2.5 Billion SR
Ongoing Project
Project Title: Supervision of KKU Administration Building (Phase III) for King Khalid University in Abha
Contract No. J03-7800
Project Man Hours 3yrs
Project Budget: 2 Billion SR
Ongoing Project
Project Title: Supervision of KKU PHASE I MALE CAMPUS PARKING AREA for King Khalid University in Abha
Contract No. J08-13701
Project Man Hours 3yrs.
Project Budget: 5 Million SR
Ongoing Project
Project Title: Supervision of KKU NURSING HOUSING for King Khalid University in Abha
Contract No. J10-03600
Project Man Hours 3yrs.
Project Budget: 5 Million SR
Ongoing Project
DUTIES AND RESPONSIBILITIES
Handling of 5 MEGA Projects for King Khalid University ABHA Saudi Arabia
Preparing Transmittals Letters to contractor sub-contractors
Provide Quality Assurance / Quality Control (QA/QC) audits of the hardcopy Document Control files and the Prolog electronic Document Control files.
Receiving Materials Supply for the project from supplier and manufacturer local and abroad
Using EDMS Document Management System
Maintain and update of actual Project Documents
Filling Of Approved Shop Drawings, RFI, TQ, NCR, Letters and others Documents that are related to the construction Projects
Maintain and update the Shop Drawings for the 3 Projects
Maintain and update the Material Tracking Report
Maintain Project Documents
Preparing Transmittal Letters to Contractor, Sub-Contractors & Client
Maintain DMS E-Filling System through ZFP Server
Upload all Documents in EDMS E-Filling System
Plotter Operator for Cad Printing
1.Al Khodari and Sons (Main Contractor)
2.November 2007- December 2009
3.(Proponent SAUDI ARAMCO OIL COMPANY) Project Management Team (PMT) DOCUMENT CONTROL
Project Title: Upgrade Wastewater Project System
BI-10-00084/18285/18245/18226 & 18227
North Jeddah Bulk Plant
South Jeddah Refinery and Bulk Plant
Najran Bulk Plant
Duba Bulk Plant
Tabuk Bulk Plant
Al-Jouf Bulk Plant
Turaif Bulk Plant
Yanbu & Rabigh Bulk Plants
DUTIES AND REPONSIBILITIES
Receiving Materials Supply for the project from supplier and manufacturer local and abroad
Maintain and update of Project Document on Saudi Aramco e-Cabinet.
Maintain and update of actual Project Documents
Issuance of periodic revision in Engineering Drawings
Generating site correspondence
Performing Administrative Function
Preparation of Project Procedure relevant to Document Control
Maintain Project Documents
Preparation and submission of correspondence to client, Engineering at main office in Saudi Aramco and sub-contractor for dispatch of Project Documents
Fast and timely interaction with Internal Customers and Su-Contractor
Preparing various Reports, Presentation and work sheet as and when required for Planning, Contract QA/QC and Others.
Prepare Materials List and Materials Tracking Report for an existing BI or Projects whether Lumpsum Turnkey or LSPB, Lumpsum Procure and Build.
Assign 9COM material numbers to each equipment on the tracking report, and check corresponding; SAMMS, SAES, SAEP Standards applicable.
Assign applicable Levels of Inspection, SA-175 Forms.
Assign required NMR FORM NOS. AND SPDP.
Check recommended Vendors and Manufacturers/Suppliers are approved by checking RVL LIST in SAP.
Prepare “Request for Materials Technical Approval”, provide applicable 9COM, standards, NMR, SPDP, Inspection Forms.
Prepare transmittals to SAPMT, DESIGN, VID, CSD, MSD and other concerned organization for review and approval.
Prepare INSPECTION ASSIGNMENT PACKAGES (IAP)
And provide all the attachments, e.g. MTA or requisition copy, PO copy, drawings, data sheets and technical specifications, inspection forms, NMR, SAES, SAMSS and other applicable standards and forms.
Set schedules for Pre-Inspection Meetings (PIM) for level 2 and higher inspection levels.
Coordinate with Vendors and Suppliers regarding Place Orders for Inspectable and Non-Inspectable items.
Upload electronic and hard copy thru Aramco E-Cabinet.
Receiving documents from contractor like NMR’s, MTA, MR, IAP & SPDP Packages and forwarded to the approving bodies.
Maintaining ARAMCO E-Cabinet.
Preparing Material Tracking Report on Weekly Basis.
Preparing Corrective Actions Non Conformance Report (NCR)
Preparing Quality Personal List by Discipline.
Preparing Listing of Suppliers Survey Performed with Summary of Findings, and Plan Survey for the next month.
SPDP Tracking Report.
NMR Tracking Report.
Narrative action for process improvement activities.
Two Weeks Look Ahead.
Receiving materials thru vendors like SIEMENS & other.
Develops implements and enhances departmental documental management and control programs and system.
Ensure compliance with legal requirements and provides staff with effective, easy to use process for maintaining and retrieving information vital to department.
Maintain a departmental electronic documents management system.
Supervise and oversees the organization, retention and storage of capital project generated documents to ensure proper routing, distribution, filling and storage of all project-related documents and materials.
Develop and maintain database and spreadsheets to track departmental capital and major projects.
Processing Temporary Access & Material Gate Pass thru Aramco system.
Performs other duties as assigned.
Quality Management System – ISO 9001 – 2000, my expertise is to Development, Implementation and maintains Quality Management System.
Third Party ISO 9001: 2000 Auditing, more than 18 audits, capability surveys.
Vendor Inspection: Vendor Quality and Technical assessment, evaluation of service.
Inspections: Local Control Panel, Dragonfly Oil Skimmer, Radar Level Transmitter, Diesel Generator, Automatic Transfer Switch, MBR, Pre Engineering Building, Steel Structure Construction Sites, Circuit Breakers, Gate Valves, Check Valves, CS Pipes and Fittings, Welding Equipments, Welding Machine, Welding Accessories.
. CHECK 9COM, INSPECTION LEVEL, SAES, SAMMS,
DESCRIPTION AND OTHER STANDARDS, DRAWINGS
IN SAP R3 TRANSACTIONS.
Project Title: Upgrade Wastewater Project System
BI-10-00084/18285/18245/18226 & 18227
North Jeddah/South Jeddah/Yanbu/Najran/Duba/Tabuk/Al-Jouf/Turaif/Yanbu & Rabigh Bulk Plants
QC Procurement Supervisor
Responsibilities :
As Procurement QC Supervisor, duties includes but not limited to the following:
Ensure that procurement of materials complies with the highest quality, in compliance to the company’s Procurement Plan and complies with the highest Quality System as per contract requirement, Saudi Aramco Standards (SAES, SAMSS) and Schedule “Q” of the contract.
Ensure that material submittals complies with the material construction specifications, and required inspections possible.
Monitor Quality of materials to be supplied for the project.
Review and maintain records of quality reports for all materials mainly the inspectable materials.
Preparation and review of technical submittals.
Preparation and review of Inspection Assignment Package for inspectable materials.
Updating of Materials Tracking Report on Weekly basis.
Coordination with QA Manager and QC Manager.
Coordination with Vendor Inspection Division for all inspectable materials.
Material sourcing and review of quotations technical qualification and compliance to specifications including details of offer.
Preparation of comparison sheet for final review of Procurement Manager prior to placement of purchase order
Technical Training
Member of SAUDI COUNCIL of Engineering/Technician
ISO 9001 : 2000
ISO 9000 Procedure Development
Institute of Quality Assurance
EDUCATIONAL BACKGROUND
Vocational Course:
System Technology Institute (Baguio City)
COMPUTER TECHNICIAN 1997 – 1999
Computer Skills/software and hardware
MSWord
MSExcell
PowerPoint
Networking
CAD
Troubleshooting of Hardware & Software
PERSONAL DATA:
Name: DOMINADOR E. CARIAGA JR
Nickname: DOMing
Address: #107 Cuangao Namagbagan Sta. Maria, Pangasinan
Contact #: 092********
Provincial Pangasinan
Address: #107 Cuangao Namagbagn Sta. Maria Pangasinan
Email ad1ask@r.postjobfree.com
Date of Birth: April 2, 1978 Age: 44
Place of Birth: Sta. Maria Pangasinan Sex: Male
Height: 5’11 Weight: 150 Ibs.
Citizenship: Filipino
Civil Status: Married
Address: #107 Cuangao Namagbagan Sta. Maria, Pangasinan
Language & Dialect Spoken: English, Arabic, Tagalog, & Ilokano
I hereby certify that all information given is correct and true.
DOMINADOR E. CARIAGA JR.
Name & Signature