RESUME
p.sankarkumar
semmadaipatti
palakkanuthu post
dindigul taluk
dindigul -624619
cell no - 880-***-****
Email id - ad18a1@r.postjobfree.com
ad18a1@r.postjobfree.com
summary
Having 9+years5+months of experience in BTS field o&m engineer of CDMA and GSM, radio base stations looking for a challenging career where I can execute my skills for mutual benefit. Professional experience
Working as an mts BTS field o&m engineer zte telecommunication india pvt ltd then installation engineer in siebenberg technology,tvsics,flower art communication(huawei and zte sup con) universal technology (ericsson sup con) chennai from sep 2009 to till date. Job Responsibilities
Desination – BTS field operation and maintenance engineer BTS maintenance of CDMA(ZTE)
Addition of BTS on BSC terminal
Cleared microwave losses, Log in and configure intracom equipment Ability to clear the different faults occurred at GSM and CDMA base station Managing and coordinating the roll out process
Analyzing the time frame given by the customer and implemention within that time frame Updating the customer with implemention status on daily basic for the all sites Keeping a proper trackof all project activity started from material movement to siteintegration Proper team management of implemention
Responsible for expansions and swapping of current network for stability Up gradation of nodes for the higher capacities
Up gradation of transmission capacity of present network Support to MTS for typical swapping & operation and maintenance activities Commissioning of new transmission nodes(idr,isr)intracom transmission equipments Software up gradation and mapping of e1 from nodes to nodes To troubleshoot all mw related problems, to check the interferences in some critical cases To check the e1 alarms and status check the mw instalation as per the quality parameters Responsibilities
Implementation and installation of huawei BTS and mw systems BTS commissioning alarm integration and testing
Facility audit which involves checking whether installation is done properly and as per formet Or not, checking the assisting in the site surveys, Drive test and implementation of changes suggested by rf team External alarm termination and testing
Experienceon huawei and zte bts
Installation and commissioning of zte nec links,checking bts site quality. Systems and tools used
Huawei and zte bts indoor, outdoor, ericsson bts 2964,2964 v2 Nec pasolink, nec pasolink 200,vswr tool- bird, anritsu,e1 tester(bermeter) Academic qualification
Degree : diploma engineering
Discipline : electronics and communication engineering College : christian polytechnic college,oddanchatram,tamilnadu Year of passing : june2009
Aggregate : 72.29%
Hsc : 12th
Year of passing : june2006
Aggregate : 60.08%
Sslc : 10th
Year of passing : june2004
Aggregate : 66.8%
Software proficiency
Operating system : windows xp
Languages : computer hardware technology
Academic project
Company : academic project
Project title : variable dc regulator source using paper mouse Team size : 6
Area of interest
Communication systems
Elactronics machines
Bts systems and radio station
Personal details
Name : sankarkumar.p
Father name : paramavel
Sex : male
Marital status : single
Nationality : indian
Date of birth : 12/12/1988
Linguistic proficiency : tamil,english
Hoppies : cricket,football
Declaration
I here by declare that above all information are true and correct to the best of my knowledge. Place yours faithfully
Date p.sankarkumar