RESUME OF MR.K.M.SUBRAMANIAN
FROM MR.K.M.SUBRAMANIAN
PLOT 8 (6/8)WEST VANNIAR 1 ST CROSS STREET
NESAPAKKAM,CHENNAI 600078
TAMILNADU,INDIA
NAME K.M.SUBRAMANIAN
NATIONALITY INDIAN
DATE OF BIRTH 24-02-1942
EDUCATIONAL QUALIFICATION:- PRE UNIVERSITY, DIPLOMA IN MECHANICAL ENGINEERING
PASSPORT DETAILS:-PASSPORTNo:-K5819773
PLACE OF ISSUE CHENNAI,DATE OF EXPIRY 07-10-2022
EMAIL ID ad16ze@r.postjobfree.com
contact phone +91-988*******
GENERAL INFORMATION
1) HINDUSTAN BROWN BOVERY,MUMBAI (FROM DEC1963 TO JAN 1969) POSITION :- ERCTOR
2 ) HIVELM INDUSTRIES LTD CHENNAI (FROM JAN1970 TO DEC1974 )POSITION:-
ERECTION AND COMMISSIONING ENGINEER 3)ENGINEERINGCONSTRUCTION CORPORATION(ECC)CHENNAI (FROM DEC1974 TO MAY1978)
POSITION:-ASSISTANT ENGINEER ELECTRICAL
4)HIVELM INDUSTRIES LTD, CHENNAI (NOV1978 TO OCT1982)POSITION:-ASSISTANT ENGINEER
5)MIDEAST CONSTRUCTORS (MECON)DOHA,QATAR (FROM JAN 1983 6TO JUN1986) POSITION:-
SENIOR FOREMAN ELECTRICA
6)CALCUTTA ELECTRIC SUPPLY CORPORATION (CESCON) CULCUTTA (FROMJAN1987 TO NOV 1989)
POSITION:-RESIDENT MANAGER FOR 400 KV SUBSTATION
7)MIDEAST CONSTRUCTORS (MECON)DOHA,QATAR (FROM DEC1989 TO JUN 1995)
POSITION:-SENIOR FOREMAN ELECTRICAL
8)DOHA PETROLIUM CO (DOPET)DOHA,QATAR (FROM NOV 1995 TO FEB 1997) POSITION:-
SUPERVISOR ELECTRICAL &INSTRUMENTATION
9)MIDEAST CONSTRUCTORS (MECON)DOHA,QATAR(FROM APR 1998 TO FEB 1999) POSITION:-
SENIOR FOREMAN ELECTRICAL
10) CLEARING &FORWADING COMPANY (JAN2000-MAR 2005)(RELATIVE"SJ COMPANY)CHENNAI POSITION:- MANAGER
11)ARCAN INTERNATIONAL CONTRACTING&TRADING CHENNAI INDIA OFFICE,HEADOFFICE AT
KINGDOM OF SAUDI ARABIA(KSA) F(FROM MAR 2005 TO DEC 2016)POSITION:-SENIOR ELECTRICAL ENGINEER/CONSULTANT
EXPERIANCES SUMMARY:-
WIDE EXPERIANCE OVER 40 YEARS IN THE FIELD OF ELECTRICAL ENGINEERING IN EXCECUTION,COORDINATION,EVALUATION,TENDERING ESTIMATIONS, EHT/HT/LT POWER SUBSTATION (INDOOR/OUTDOOR) ALL RELATED CONNECTED WORKS FOR MAJOR SUBSTATIONS,
OF VARIOUS PROJECTS,UP TO 400 KV POWER STATION AND HIGHRATED TRANSFORMERS, AND
ELCTRIFICATION &DISTRIBUTION IN HIGHRISE BUILDINGS AND INDUSTRIAL COMPLEXES,OIL/GAS FIELDS
(OFFSHORE/ONSHORE) UPGRADATION AND SHUTDOWN WORKS IN LECT/INST,AND QA/QC INCLUDING
DOCUMENTATION,AND ELECTRICAL /INST ESTIMATION & TENDERING .
WORK HISTORY :-
1) HINDUSTAN BROWN BOVERI MUMBAI (DEC 1963 TO JAN 1969) PROJECTS :-KOTHAGUDAM THERMAL POWER SUBSTATION,NAGARJUNASAGAR HYDRO ELECTRIC POWER STATION,UPPER SILERU HYDRO ELECTRIC POWER STATION
NASIK THERMAL POWER STATION POWER RECEIVING SUBSTAION SWITCHYARDS IN MAHARASHTRA AND UTTAR PREDESH
AND DEHI,MAHINDRA UGINS STEEL ROLLING MIL KHOPOLI MAHARASTRA (ALL CONNECTED WITH SUBSTATION SWITCH
YARDS AND ITS RELATED WORKS INCLUDING SUPERVISION,INSTALLATION OF STRUCTURES/EQUIPMENTS./DC SYSTEMS/
POWER AND CONTROL CABLING AND TEMINATIONS,TESTING/AND PRE COMMISSIONING AND DOCUMENTATION ETC
2)HIVELM INDUSTRIES LTD CHENNAI (JAN 1970-DEC1974) PROJECTS:- BADHARPUR THERMAL POWER STATION SWITCH
YARD, BHARAT ALUMINIUM CO (BALCO)PLANT SWITCHYARD,IDDIKI POWER STATION SWITCHYARD
RESPONSIBLITIES:- COMPLETE SUPERVISON,INSTALLATION OF HV ISOLATORS 220KV/132 KV WITH COMPLETE OPERATING
MECHANISM MANUAL,MOTOR AND PNUEMATIC AND INCLUDES TESTING FOR PRE COMMISSIONING AND INCLUDING
DESIGN AND PROTO TYPE WORKS IN THE FACTORY
3) ENGINEERING CONSTRUCTION CORPORATION (ECC)CHENNAI (DEC 1974-MAY 1978)REACTOR RESEARCH
KALPAKKAM, TAMIL NADU CO OPERATIVE SUGAR MILLS ERAIYUR TRICHY DIST, FOOD CORPORATION OF INDIA (FCI)
RAMAGUNDAM ANDRAPREDESH, L&T POCLAIN PLANT BANGALURU
RESPONSIBLITIES:- COMPLETE INCHARGE FOR SUPERVISION /INSTALLATION OF THE PLANT INDOOR /OUTDOOR POWER
INSTALLATION,SWITCHYARD COMPLETE, AND LIGHTING OF THE PLANTS,HIGHRISE PRIILING TOWER,POWER HT,LT,CONTROL
CABLING,TERMINATIONS, SWITCHGEARS,MCC:S FOR THE PLANT S FOR THE ABOVE PROJECTS
4)HIVELM INDUSTRIES LTD CHENNA (NOV 1978-OCT 1982) PROJECTS:- 400 KV SWTCHYARD S IN UTTARPREDESH,AND MAHARASTRA
RESPONSIBLITIES:- SUPERVISION,INSTALLATION,FUNCTIONAL OPERATION CHECKS OF THE 400 KV CENTRE BREAK ISOLATORS,
PANTOGRAPH ISOLATORS INCLUDING THE OPERATING DRIVES MOTOR,CHECKING OG WIRING AND ELECTRICAL OPERATIONAL
AND PRECOMMISSIONING,AND DESIGN WORKS IN THE CHENNAI FACTORY
5)MIDEAST CONSTRUCTORS DOHA QATAR( JAN1983-JUN 1986) PROJECTS:- ALWAJUBA SUBSTATION (ASIA SWEDEN)
STATE ELECTRICITY BOARD POWER HV/LV /PILOT CABLING FOR RURAL DISTRIBUTION,OFF SHORE OIL STATION PS -1,2 AND 3,CONTROLLED BY QGPC DOHA QATAR,SHUTDOWN WORKS IN THE
STATIONS UPGRADATION AND SHUT DOWN WORKS
RESPONSIBLITIES:- COMPLETE SITE INCHARGE FOR THE 66 KV/132 KV AND 11 KV OUTDOOR,INDOOR SUBSTATIONS COMPLETE
ELECTRICAL WORKS INCLUDING STRUCTURES FOR THE SWITCHYARDS,LIGHTING INDOOR,OUTDOOR OF THE ALWAJBA SUBSTATION.
AND IN THE POWER SED RURAL DISTRIBUTION COMPLETE CO ORDINATION OF ELECTRICAL AND CIVIL WORKS,INCLUDNG
COLLECTION OF ELECT MATERIALS AND ARRANGING FOR DISTRIBUTION,HV/LV /PILOT CABLING AND TERMINATION AND TESTING
AS PER SED REGULATIONS
6)CALCUTTA ELECTRIC SUPPLY CORPORATION(CESCON)(JAN1987-NOV 1989) PROLECTS:-400 KV SUBSTATION SWITCHYARD, AND
SWITCHYARD CONTROLROOM IN KOLAGHAT THERMAL POWER STATION.
RESPOSIBLITIES:- ALL THE ELECTRICAL WORKS FROM CIVIL WORKS,GRID EARTHING WORKS,STRUCTURAL WORKS FOR EQUIPMENTS
AND TOWERS/GIRDERS ETC,INSTALLATION OF EQUIPMENTS,CONDUCTOR STRINGING,BUSBARS,TRANSFORMERS,CABLE TRENCH
WORKS,CABLING,TERMINATIONS,ALL SWITCHYARD CONTROL ROOM WORKS,ALL RELATED WORKS SUPER VISION,CONTROLLING
OF SUB CONTRACTORS ETC AND EXCECUTED AS A MANAGER ELECTRICAL.
7) MIDEAST CONSTRUCTORS DOHA QATAR (DEC 1989-JUN 1995) PROJECTS:- UPGRADATION /SHUT DOWN ALL ELECTRICAL WORKS
IN QATAR GAS PETROLIUM COPORATION(QGPC) IN FAHIL STRIPPING PLANT, NEW NORTH CAMP PWER HV/LV CABLE DISTRIBUTION
WORKS AND COMPLETE ELECTRICAL INSTALLATION WORKS IN QGPC NORTH FIELD GAS PLANT (MAJOR PLATFORM IN OFF SHORE
PLAT FOR QATAR GAS)
RESPOSIBLITIES : COMPLETE ELECTRICAL WORKS IN THE PLANTS AND ALL CONNECTED WORKD IN THE OFF SHORE WOKS,POWER
HV/LV CABLING LAYING,TERMINATIONS,TESTING,IN CLUDING QA/QC,DOCUMENTATION WORKS.
8) DOHA PETROLIUM COMPANY, DOHA QATAR (NOV 1995-FEB 1997)PROJECTS:- QGPC ELECTRICAL/INSTRUMENTS WORKS IN
ON SHORE OIL/GAS PLANTS(STRIPPING PLANTS) IN DUKHAN DOHA QATAR
RESPONSIBLITIES:-COMPLETE INCHARGE FOR SUPERVISION,INSATLLATION,CALIBRATION,PREPARING INSPATION REPORTS,
DOCUMENTATIONS FOR THE ELECTRICAL AND INSTRUMENTATION WORKS FOR THE UPGRADATION/SHUTDOWN WORKS
,INCLUDING THE MODIFICATION REQUIRED FOR THE UP GRADATION OF THE PLANT IN ELECT/INST WORKS
9)MIDEAST CONSTRUCTORS DOHA QATAR (APR 1998-FEB 1999) PROJECTS:-PROJECTS:- ALL ELECTRICAL WORKS IN THE
FABRCATION 3 DECK EACH FOR OFF SHORE QGPC 3 NOS OIL PLATFORSMS PS1,2 ANS 3,IN ON SHORE FABRICATION YARD
TRANSPORATATION TO OFF SHORE AND INSTALLATION AND TIEING UP AFTE REMOVING THE EXSISTING DECKS IN THE OFF SHORE OIL PLATFORMS IN 3 PLACES PS 1,2 AND 3
RESPOSIBLITIES:SUPERVISION AND INSTALLATION OF ALL ELECTRICAL WORKS,STRUCTURAL SUPPORT WORKS,POWER /
LV /CONTROL CABLING .TERMINATIONS,ELECTRICAL INSTALLATIONS OF VENDORS SKIDS ETC DURING FABRICATION AT
ONSHORE INCLUDING KEEPING THE TIE-IN CABLES. PREPARTION AT OFF SHORE FOR THE COMPLETE WORK AND I
INCLUDING MODIFICATION REQUIRED,AND COMPLETE CHECKING,TESTING,TIE-IN CONNECTIONS, QA/QC,AND PRE-
COMMISSIONING TEST,ALL DOCUMENTATION AND ASBUILT PREPARATION C,HECKING
10) C&F CLERANCE COMPANY CHENNAI (.JAN2000-MAR2005) RESPOSIBILITY:- WORKED AS A OFFICE MANAGER
LOOKING AFTER THE CLEARANCE AND FORWADING TO THE CLIENT AND MAINTAINING DAY DAY TODAY AFFAIRES
11) ARCAN INT"L TRADING AND CONTRACTIONG COMPANY (MAR 2005 -DEC 2016) PROJECTS :- TENDERING WORKS
FOR THE ELECT/INST/HVAC/PLUMING /CIVIL WORKS CONNECTED WITH VARIOUS PROJECTS IN KINGDOM OF
SAUDI ARBIA.
RESPONSIBLITIES:- ESTIMATION,EVALUATION,TENDERING WITH ESTIMATES. FOR ELECTRICALELECTRICAL/INSTRUMENTATION
AND ITS CONNECTED CIVIL WORKS PRICING ETC FOR VARIOUS TYPES OF WORKS INKINGDOM OF SAUDI ARABIA,ASSISTING /AND CHECKING OF THE PRICED TENDER AND FIANALISING THE TENDER FOR
SUBMISSION BY THE HEAD OFFICE AT KSA
.
.