Post Job Free

Resume

Sign in

Qa Qc Quality Control

Location:
La Cruz, Monagas, Venezuela
Posted:
December 20, 2023

Contact this candidate

Resume:

CV

Surname and name: Arnao Marichal, Jorge Sebastian

Email: ad14j2@r.postjobfree.com

Phone: +58-426-******* WhatsApp/ +58-424-*******

Phone reference/ Loc./ Zip +1-409-***-****/ 7777Katy Freeway, Apt. 387 Houston, Tx./ 77024

Oil, Gas & Energy Experience: 30 years. Total Professional Experience: 36 years.

Language: Spanish mother tongue, intermediate English

Linkedin url: www.linkedin.com/in/jorge-arnao-5189468

Summary:

Specialist in Instrumentation and Control over thirty years of experience in Oil and Gas industries, Construction and Engineering projects, solid knowledge in Electricity and Telecommunications disciplines. Development of engineering, phases basic, detail and feed, technical bid evaluations, technical adviser and reviewer of engineering from others; design of production facilities up-stream, petrochemical plants, up-grader of crude, onshore/offshore, LPG plant, revamping, refinery expansions, power plant, handling and transport of solids for the steel plant. Role in direct construction, commissioning and start-up of plants. Strengths in the development of the documentation and drawings, specifications, basis and design criteria, data sheets of ISA forms, instrument index, database, wiring diagrams, loops diagrams, raceway routes and cabling, details of mounting, hook-ups, bill materials, requisitions for procurement, elaboration of scope work, evaluation of quantities of works, Designer of Fire & Gas system, design of P&ID process control loops; architecture of control and block diagrams. Experience in Construction: E&I Supervisor, Superintendent of the mounting, E&I Inspector for the QA/QC team, factory testing and equipments packages.

Profile and Roles:

Member of Construction Management teams as field engineering, supervision or inspection. Lead of Automation and Control engineering in multidisciplinary projects; E&I QA/QC inspector, E&I Construction Superintendent, E&I Construction Supervisor, member of commissioning and start-up teams; as part of a major engineering consulting company staff, alternating engineering design and construction periods.

Skills:

Knowledge of the international standards as ISA, NEC, API, ANSI, ASME, PIP, NFPA, NEMA, NETA, ATEX, OSHA, EEEI, EIA/TIA, ISO, PDVSA, PEMEX, ECOPETROL, RETIE; knowledge of engineering practices, design details, calculation methods, economic principles, software and applications, Microsoft office, autoCad, smart plant, intools, inspection procedures, hygiene and safety policies, permit for hot works and cold works, competent for work at high elevations and in confined spaces, also on hazard locations of process plants; general knowledge of piping and civil structure, isometrics, piping and instruments fitter, mounting of mechanical equipments. Also a technical instructor for training programs in quality management during the development of the projects. PROFESSIONAL CURRICULUM

From to Job description/position Company/Project

Nov. 2019 May 2023

EPC Auxiliary Boiler B620-C to METOR Plant “Metanol de Oriente, METOR S.A”. Field engineer E&I for the mounting of the package equipment by TERMOTECNICA INDUSTRIALE Italy, Steam Pressure (Operating/Design 28/35 Kg/cm2g, 370 C, rating 65 T/h.

PEQUIVEN - MITSUBISHI Petrochemical complex Jose

June 2022

SUPERMETANOL Plant. Automation and pre-commissioning of the new cooling tower for waste water plant. Integration of instrumentation signals between DCS & FSC Honeywell and low voltage MCC. Loop diagrams documentation, issued instrumentation data sheets.

PEQUIVEN- ENI Petrochemical complex Jose

April-Aug 2020

Expansion Project of Chemical Storage in the ALTAMIRA terminal of VOPAK, adding sixteen API tanks of capacity 2500 m3 each tank. Develop of detail engineering of the instrumentation.

Consortium Grupo AVANZIA – INELECTRA.

May-June 2019

Preventive Maintenance of Electrical equipment, lighting, panelboards, motors, MCC, electric starters, during emergency maintenance planning of the fertilizer plant FERTINITRO; ammonia and urea plant.

FERTINITRO Petrochemical complex Jose

March 2016 to April 2019

Field engineering of CONFEED consortium by JGC-INELECTRA-CHIYODA for PDVSA on Deep Conversion Project of Puerto La Cruz Refinery. PMT Construction management team. Development of the early works: LPG Plant, butane and propane mixing, distribution, storage, pumping and dispatch facilities for LPG to national marketing. Mounting of Nitrogen Plant package by LINDE. Site preparation for Fresh Water Plant, Building construction HVAC system and Fire and Gas System. Attending to main EPC Contractors, WISON Chinese and Hyundai Korean, for site preparation of various process plants. Response to letters and Technical field consultations and site instruction for Construction, requisitions field and questions related to scope work and technical bid evaluation for procurement.

PDVSA

DEEP CONVERTION PROJECT.

Puerto La Cruz Refinery.

Feb-July 2017

Development of Telecommunications engineering for 72 Apartments in PDVSA Guaraguao residence field. Structured cabling UTP CAT. 6A for LAN network, fiber optic specifications, core switch and Ethernet switches specifications, bases and criteria of design, raceway route, drafting cad drawing and details of mounting, for Voice & Data IP, analogical telephony, CATV and CCTV Telecommunications services.

DOUWEI

Chinese Contractor

Oct 2015

Feb 2016

Project engineer. Development of basic engineering for Increasing Production Capacity and

Management of Extra Heavy Oil 165 MBD to 330 MBD for Petroleum Sinovensa. Designer of

Fire and Gas System in process areas for production facilities in Morichal Field and Jose

petrochemical complex. Definition and design of the control loops on P&ID. Reviewer of engineering. Designer of the Fire & Gas System in process areas and buildings. Risk Analysis, location of FGS devices, bases and criteria of design, specifications, data sheets, requisitions, drawings for locations an routes raceway for expansion 330 of Jose Plant and Morichal Plant.

SINOVENSA - HQCEC

Consortium PDVSA-CNPC

China National Petroleum

Corporation

Jul 2014 – Ago 2015

Senior engineer, technical adviser and reviewer of P&ID control and safety definitions. Basic Engineering, philosophies and specifications for facilities crude production cluster of well pad, flow station CPF (Center of process fluids), treatment plant of produced water, storage tanks.

PETROCARABOBO

REPSOL-CHEVRON.

Nov 2014 – Ago 2015

Detailed engineering for Monitoring System of Stress of Coke Drums. Own design of the cables routes and locations of devices sensors, thermocouples and strain gages for data acquisition to datalogger, supplied by STRESS ENGINEERING SERVICES, Inc. Installation details for I/O and thermocouple cabinet and junction box. Power feeder and instrument air supply for purge Z to cabinets. Design of cable tray and conduit routes.

PETROCEDEÑO. Jose complex. ICM & FOCUS TECHNOLOGY CONTRACTOR.

Dec 2014

Bio-fuel plant Melo, Cuenca, Spain. Recovery of oil used. Reviewing and completion of the detail engineering for construction and procurement instrumentation scope. ISA forms to data sheet of pressure gauges, thermometer, pressure transmitter, flowmeters, temperature transmitter, control valves

INSTRELEC IBERIA / MARA CYP. Venezuelan consulting

Sep-Nov 2014

Fire Detection System for hotel and commercial mall center. Design of smart and addressable panel with SLC and NAC devices, cabling circuits type A as per NFPA 72. Specifications and drawing layout.

HOTEL BOUTIQUE - CC PUENTE REAL II ETAPA. Puerto La Cruz.

Ago 2011- Jul 2014

Senior engineer of early work facilities. CONFEED consortium with JGC JAPAN & CHIYODA. Front End Engineering Design. Varius projects: Slop recovery facilities, Site preparation to new Fresh Water plant; to Fire Water Pumps Station, Revamping of crude storage tanks, F&G system to temporary buildings, Gasoil transfer pumps to Power Plant of 300 MW “Alberto Lovera”. Reviewer of engineering by others for LPG plant, storage spheres, truck loading, LPG pumps, metering skid. F&G system and CCTV for National Guard Bolivarian military quarter.

PDVSA

DEEP CONVERTION PROJECT.

Puerto La Cruz Refinery.

Sep 2010 - Ago 2011

Leader of Instrumentation discipline. Engineering details for facilities crude production. Cluster of various wells with Progressive cavity pumps. injection control of diluents, test separator, control pressure and temperature to shipping crude to the upgrader plant

PETROMONAGAS. PDVSA

Cerro Negro field.

Jan 2010 – Sep 2010

Superintendent of direct construction for the instrumentation scope mounting of METOR Expansion project, Methanol Plant of 2500 TM with MITSHUBISHI Heavy industries. Commissioning and test.

PEQUIVEN METOR EXPANSION PROJECT. Jose complex.

Oct 2009 – Jan 2010

Inspector of electricity and instrumentation, construction management QA. Inspection of piping cathodic protection, grounding station control and safety valves, pig launcher station, shutoff valves, metering skid, lighting, lightning protection.

PDVSA GAS PIPELINE BARBACOA-MARGARITA PROJECT

March – August 2009

Field survey for Deep Convertion Proyect. Coordinator of expatriated nipons of JGC (Japan Gasoline Company) in labors of up-grade of DA-1 and DA-2 Destillation plants of refinery; for revamping proyect. Review of P&ID, process equipments, towers, heaters, buildings structures, facillities. Report of existing instrumentation of process.

PDVSA

DEEP CONVERTION PROJECT.

Puerto La Cruz Refinery.

2009

Basic engineering, P&ID definition to flow metering for custody transfer LACT unit of diesel. Support to PETROTRIN-SUMMIT.

TRINIDAD & TOBAGO REFINERY

2008

Development of detail engineering for field instrumentation in area 44 and 45 in block 2 of HDT-GCB proyect, Barrancabermeja complex. Enforcement support to Inelectra Colombia center.

ECOPETROL

Colombia

2008

Engineer project. Development Cerro Negro field to add new wells on cluster to increasing oil production of Clusters 5, 7 and 8.

PETROMONAGAS. PDVSA.

Dec. 2007

Evaluation of relief and safety pressure valves of the blacketing system on pressure vessels, for comply to Hazop. Support to PHOENIX-PHA.

TRINIDAD & TOBAGO REFINERY

Oct 2007

Review Detail Engineering for Metering skid of Flowmeter Ultrasonic type for transfer custody to “Néstor Pineda” marine terminal boarding Cartagena. Installing details completion, material take off, scope of work. Technical reviewing and support to Inelectra Colombia center.

ECOPETROL

Colombia.

2007

Field engineering support at distance (Internet) for PEMEX Project HA-ZAAP-C & HA-KU-H Tampico Gulf of México. Cleaning punch list of engineering to completion offshore platforms, procurement technical support, reviewer of squad check by vendor package sanitary and facilities offshore.

PEMEX – PETROLEOS MEXICANOS

2006-07

Up-grade of Isometrics and drawings plant of the Fire Fighting System, pump house stations, water storage tank, piping distribution of fire water to process plant in refinery, hose and extinguishers quantities and location, evaluation of o-ring for expansion to new plant.

CIGMA project development of basic and detail engineering for Telecommunications System and data center of main office building, structured wiring for Voice & Data, Design and specifications for Data Center, layout drawing and fiber optic patch panel.

PDVSA

DEEP CONVERTION PROJECT.

Puerto La Cruz Refinery.

2006

AGLA II project Conditioning of Liquid Sour Gas Plants; basic engineering for Access Control, CCTV system, Perimeter Security systems, Intrusion detection with video motion technology and vibration cable signal installed on fences.

PDVSA - Anaco.

2005-06

CAPEX Project engineering for corrosion system, Amine injection pumps, relocations antifoam valves on coker drums, temporary shipping crude to COB- PETROLERA AMERIVEN.

PDVSA & CONOCO-PHILLIPS-CHEVRON. Jose complex

2005

Detail engineering for LACT unit. Lease Automatic Custody transfer of diluents by OCN. Specification for procurement.

OPERADORA CERRO NEGR0

2005

Electrical and instrument QA&QC Inspector of the construction of JOSE ORIMULSION PLANT. Installation of industrial network with Fieldbus Foundation protocole. Installation of all instrumentation and control systems FOXBORO I/A BPCS; TMR TRICONEX for SIS and F&G system.

SINOVENSA-CHINA PETROLEUM, Jose complex.

2004

Waste Water Treatment Plant. Restoration Project for PETROZUATA. Loop test, commissioning and startup. 600 loops tested.

PETROZUATA, Jose complex

Jan 2002 – Oct 2004

Direct hire Construction HAMACA UPGRADER, Instrumentation mounting QA/QC Inspector for FLUOR-ALVICA GROUP. Mounting of instrumentation of Utility Plant, cooling tower, storage tanks and completion of Sulfur unit, delay coker, hot oil system, sintetic oil unit and other process plants and packages equipments.

PDVSA-CONOCO-PHILLIPS-CHEVRON

Jose complex

2002

HAMACA PTO (Patio de Tanques Oficina) up stream project Tank Farm, Shipping Pumps, LACT Units. Loop tests and commsissioning. (Supertanks of one million of barrels).

PDVSA-CONOCO-PHILLIPS-CHEVRON El Tigre. Anzoategui.

2002

Projects completion on Orocual Field, flare system, scrubber trains, gas separator, and multiports valves to PDVSA flow stations.

PDVSA. Maturín, Monagas.

2000-2002

BOQUERON Field Development Project. EPC INEPAR Inelectra-Parsons-Proyca. Instrumentation Superintendent, Compression Gas Plant of 150.000 SCFM, inyection wells at 10.000 PSI, SOLAR turbine, automation of wells, facilities production.

PDVSA-BRISTISH PETROLEUM Maturín, Monagas.

Jul 2000

Commissioning and start up of centrifugal Sulzer pumps. LOS JABILLOS injection plant water.

PHOENIX – PDVSA

1999-2000

INEMAKA development of oil production facilities Engineering and Construction. Flows stations, pumping stations, gas injection plant COOPER compressors, 13.8 KV electrical distributions on field wells.

PDVSAS-ARCO-BP

1998

FNC/TAME Construction Supervisor, mechanical completion and commissioning. PDVSA CRP Complex of Amuay.

PDVSA. CRP Complex

1997-1998

BOSCAN Field Development Project EF/3 and Zulia 9 Flow Stations. Engineering and construction with CHEVRON Technology & BECHTEL.

PDVSA - CHEVRON

1997

Pressuring of Electrical Control Cabins of Pellets Plant–SIDOR. Installation and control of air unit fan and HVAC. QC Inspection and “As Built drawings”.

SIDOR

1996-1997

QA/QC Inspector for LNG natural gas to Vehicles. Major project of distribution stations in eastern region CORPOVEN.

CORPOVEN

1994-1996

PARC Project. Revamping of CARDON Refinery. Construction manager team as Electrical & Instrumentation Supervisor for MARAVEN/KELLOG. Responsible of scope work of Power, Grounding, Lighting and Instrumentation contracts. Facilities for Mixing on Line of gasoline, pump stations, storage tank farm, shelter`s analyzers, junction box racks, substations, ipp power plant, liquid sulfur and steam, colling tower, loading arms on jetty, flare sytem.

MARAVEN- KELLOG

Cardon Refinery

Punto Fijo, Falcon.

1994

Engineering to improve Lighting System to MIDREX Plant / SIDOR

SIDOR

1994

Engineering to Warehouse. Power & Lighting to Oritupano Field / PEREZ COMPAN.

PEREZ COMPAN (Argentina operator)

1992-1994

ACCRO Construction Project Jose Cryogenic and Santa Barbara Gas extraction Plant. NUOVO PIGNONE Compressors. CORPOVEN-TECHNIP.

CORPOVEN

1991-1992

Technical assistance for General Engineering Department, Inspector to development Morichal Field, production facilities up streams.

LAGOVEN

1990

Caripito Ship Loader Arms, Terminal Port & Pumping Station, Power & Grounding system installation in jetty platform.

LAGOVEN.

1990

BTX PROJECT. Instrumentation supervisor of Construction. Revamp of EL Palito Refinery KELLOG-CORPOVEN. Mechanical completation of the field instrumentation. Field engineering, surveillance and mounting of two units hydrogen compressors, axial type model Nuovo Pignone, other reciprocant type Dresser Rand, loop test and start-up of package equipments, analyzers and control syatems.

CORPOVEN

EL Palito Refinery

1985 -1990

Caracas Subway. QA/QC Inspection of equipments of Control of Trains and Communications, Automatic Pilot system, Signaling and security between trains. French technology.

METRO DE CARACAS

1983

Electrical Technician of maintenance, corrective and preventive of the cranes of jetty and conveyors. Orinoco river terminal port of SIDOR steel plant. Crane Ansaldo, Ceretti Tanfani, bridge-cranes P&H.

SIDOR SIDERURGICA DEL ORINOCO

(Metallurgical complex venezuelan in Guayana City)

1981

Lime Plant. Technician Power & control. Maintenance of the rotative furnace, hoppers, sieves, crushers, conveyors, transfer station, equipment and machinery for mining handling systems of iron & steel industries.

EDUCATION

University/College/Institution Title Location/Date

University Central of Venezuela (UCV)

Bachelor Degree in Education

Puerto La Cruz (Currently).

CFS/TUV Rheinland certified

VALINPECA/ KROHNE

SIEMENS/Industrial Process

INELECTRA, venezuelan consulting.

Design of Safety Instrumented System for Fire & Gas.

Flow measurement and Custody Transfer for liquid and gaseous hydrocarbons.

Seminar on Security Instrumented Systems

Management supervision, administration, technical and safety training.

Puerto La Cruz (2018)

Puerto La Cruz (2014)

Puerto La Cruz (2011)

Venezuela

East of University (UDO)

Diplomaed on Industrial Instrumentation

Puerto La Cruz (2005-06).

University Central of Venezuela (UCV)

Validity in the Electrical Engineering

Caracas (1987).

Navy School of Venezuela

Bachelor Degree in Naval Science and Military Art, Electronic mention

La Guaira (1985).

La Salle Technical School

Bachelor Industrial mention Electricity

Guayana city (1981).



Contact this candidate