Caterpillar: Confidential Green
Doug Harrison
Engineer Change Control
WORK EXPERIENCE
Engineer Change Control
Athens Ga. Caterpillar Inc.
**/**** – Present
Consistently meet my short and long-term targets. Proactively participate in meetings and help create new practices. Participate in departmental meetings and make detailed presentations whenever necessary. Monitor spending versus return and initiate strict cost containment approaches. Manage changes going into effect for Small Track Type Tractors. Other duties included:
* Analyze product workflow and develop logistics plans that affect production, distribution, and inventory.
* Collaborate with other teams to ensure and document purchased material is ordered, shipped, and delivered to meet scheduled build requirements while maintaining appropriate inventory levels.
* Use SAP, and Nexus to track and plan for material, inventory, and shipping
* Work with Team Center to start the workflow for a material that is going through a Rev change or new to the facility
*Use EDS, HVC and Epix to understand and communicate engineering changes going in effect
Assembler
Athens Ga. Caterpillar Inc.
06/2015 – 10/2018
Safety produced Small Track Type Tractors. Knew the process from Main Line station six to PDI. Followed standard work to ensure all processes were clearly stated and able to be followed. Trained other employees how to also build STTT safely while following standard work. I was among the first class of assemblers to be moved to assembler two. As an assembler two you need to be proficient in at least five stations and preform within Tac Time. Welder
Athens Ga. Caterpillar Inc.
12/2014 – 06/2015
Was trained to safely weld and follow standard work to product boom and sticks for 308 MHE. Learned to use cranes and hoists to place parts in tooling to be welded. Learned how to set up welding stations to produce different kinds of welds for different purposes. Die Builder
Lawrenceville Ga Mark Trece
06/2008 - 12/2014,
Machine set up to use during production and machine readjustment during processing Confirming specification and placing orders for components and parts for a machine Monitored various machines as they completed tasks and made readjustments when problems occurred.
Die Builder
Stone Mountain Ga. Container Graphics
06/2008 - 12/2014,
Used the program ArtiosCad to design corrugated box cutting dies. Handled customer complaints with empathy and composure. Trained and supervised new machine operators. Ensured safety and cleanliness of the area around the machines to eliminate any possible risk or injury Read blueprints and other internal documents to ensure the finished product was to customer’s request. PERSONAL PROJECTS
MHE E2 Phase Out (10/2021 - 02/2022)
Kept RSSM costs as low as possible by working with Material Planners by running Ka report weekly and report findings to that team. Also, helped sell those obsolete parts that were still serviceable or used by other Caterpillar plants
STTT K2 Phase Out (06/2020 - 07/2020)
Kept RSSM costs as low as possible by working with Material Planners by running Ka report weekly and report findings to that team. Also, helped sell those obsolete parts that were still serviceable or used by other Caterpillar locations.
EDUCATION
BA in Biblical Studies
Luther Rice University Lithonia Ga.
10/2001 - 08/2009 3.42 GPA
SKILLS
Cost Containment Presentations Codes of Conduct
Cross Functional Collaboration Lean Manufacturing Principles Materials Research Material Estimating SAP Production Microsoft Office RSSM Planning Office Safety Social Compliance Excel Total Cost Reduction Statistical Process Control (SPC) Tracked International Shipments MRP Planning
Caterpillar: Confidential Green
References
Mark Heitman
Logistics Manager 1
**************@***.***
Catherine Hollingsworth
Material Master Owner 2
***********************@***.***
Matthew McDonough
Supply Chain Planning Engr 3
*******************@***.***