Post Job Free

Resume

Sign in

Entry Level Pipe Fitter

Location:
Dunlap, TN
Salary:
$35
Posted:
November 09, 2023

Contact this candidate

Resume:

PROFESSIONAL SUMMARY

Highly trained Pipefitter offering excellent skills in managing teams and

running and cutting copper. Pursuing a similar position where a well-qualified individual with an understanding of assembling and installing pipe systems is highly sought. Accomplished Pipefitter with over 30 years running refrigeration lines and operating electrical pumps. Dedicated Pipefitter with background in job coordination and worksite setup. Knowledgeable in safety processes, regulations and pipe selection. Offering successful career history comprising more than 30 years. Team-oriented individual highly skilled in blueprint reading and operating pipefitting tools. Desiring a Pipefitter position with a manufacturing company. Pipefitter Apprentice knowledgeable in reading blueprints and specifications. Looking to bring further success to company through troubleshooting and cutting pipe. Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level 30 position. Ready to help team achieve company goals. WORK HISTORY

Pipe Fitter, 07/2019 to 10/2019

JV Driver Constuction - Pasadena, TX

Pipe Fabricator, 05/2019 to 06/2019

Azota Fab. Shop - Stafford, TX

CONTACT

Address: Louisville, KY 40202

Phone: 832-***-****

Email: ad0yvj@r.postjobfree.com

SKILLS

ADAM ROSALES

Fabricated and installed screw pipe, socket weld pipe and stainless steel tubing.

• Threaded pipes using piping machines.

Followed safe work practices, which included fall protection and personal protective equipment.

Performed tests to check quality of pipe and piping systems and make adjustments as necessary.

Identified equipment and production non-compliance issues and notified foreman to facilitate resolution.

• Coordinated movement of materials and equipment to job sites. Followed Operational Safety and Health Administration (OSHA) regulations to promote safe equipment operation and workplace safety.

• Maintaining Clean Work Areas

• Heavy Labor

• Project Estimation and Bidding

• Line Designs

• Hand and Power Tools

• Safe Work Practices

• Materials Ordering

• Drill Cutters

• Project Drawings

• Specification Interpretation

• Isometric Drawing

• Burning Torch

• Fall Protection

• System Troubleshooting

• Safety Techniques

• Commercial Pipe Fitting

• Blueprints and Specifications

• Mathematical Computation

• Material Prepping

• Pneumatic and Hydraulic Equipment

• Chisel Hammers

• Piping Specifications

• Materials Cutting

• Work Order Management

• Piping Layout

• Building Code Regulations

• Material Selection

• Blueprints Analysis

• Equipment Testing

• Pipe Measuring and Cutting

Pipefitter, 12/2018 to 04/2019

Tellepson Construction - Pasadena, TX

Pipefitter, 07/2018 to 11/2018

Performance Contruction - Pasadena, TX

Performed quality checks to verify proper lengths, widths and painted finish discrepancies.

Utilized welding equipment and [Type] tools to safely complete predetermined operations .

Used gauges, templates and other measuring devices to inspect production parts.

Appropriately fitted pipes by identifying dimensions, sizes and shapes needed to replace faulty pipes.

Fabricated piping pieces and components in line with design specifications for each system.

Laid out full-scale drawings of pipe systems, supports and related equipment according to blueprints.

Fabricated and installed screw pipe, socket weld pipe and stainless steel tubing.

• Threaded pipes using piping machines.

Followed safe work practices, which included fall protection and personal protective equipment.

Performed tests to check quality of pipe and piping systems and make adjustments as necessary.

Appropriately fitted pipes by identifying dimensions, sizes and shapes needed to replace faulty pipes.

Read and interpreted blueprints and schematics to determine locations, quantities and sizes of materials required.

Laid out full-scale drawings of pipe systems, supports and related equipment according to blueprints.

Fabricated and installed screw pipe, socket weld pipe and stainless steel tubing.

• Threaded pipes using piping machines.

Followed safe work practices, which included fall protection and personal protective equipment.

Performed tests to check quality of pipe and piping systems and make adjustments as necessary.

Identified equipment and production non-compliance issues and notified foreman to facilitate resolution.

• Measured, threaded and cut materials to correct angles. Fabricated piping pieces and components in line with design specifications for each system.

• Diagram Interpretation

• ISO Drawing Interpretation

• Job Order Prioritization

• Good Mechanical Aptitude

• Pipefitting

• Cutting

• Pipe System Maintenance

Pipefitter, 06/2018 to 07/2018

Force Construction - Pasadena, TX

Pipefitter, 01/2018 to 04/2018

Weld Force Solutions - Houston, TX

Pipe Foreman, 02/2017 to 11/2017

Westcon Bilfinger - La Porte, TX

Read and interpreted blueprints and schematics to determine locations, quantities and sizes of materials required.

Fabricated and installed screw pipe, socket weld pipe and stainless steel tubing.

• Threaded pipes using piping machines.

Followed safe work practices, which included fall protection and personal protective equipment.

Performed tests to check quality of pipe and piping systems and make adjustments as necessary.

Identified equipment and production non-compliance issues and notified foreman to facilitate resolution.

Interpreted blueprints to determine locations, quantities and sizes of materials required.

Fabricated and installed screw pipe, socket weld pipe and stainless steel tubing.

• Threaded pipes using piping machines.

Followed safe work practices, which included fall protection and personal protective equipment.

Performed tests to check quality of pipe and piping systems and make adjustments as necessary.

• Measured, threaded and cut materials to correct angles. Interpreted blueprints to determine locations, quantities and sizes of materials required.

Fabricated piping pieces and components in line with design specifications for each system.

Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.

Supervised layout, assembly and installation of various sizes and types of drainage pipes.

• Reviewed and approved employee time reporting.

Liaised between field engineers and trade workers align construction projects with drawings and specifications.

• Directed projects according to schedule and quality demands.

• Oversaw daily operations at site, keeping team production moving at Pipefitter, 07/2016 to 11/2016

J V Driver Fabricators - Pasadena, TX

Pipefitter, 03/2016 to 06/2016

H B Zachry - La Porte, TX

Pipefitter, 01/2016 to 04/2016

Performance Contructions - Pasadena, TX

optimal pace.

• Sourced suppliers and purchased necessary materials for work. Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.

Fabricated and installed screw pipe, socket weld pipe and stainless steel tubing.

• Threaded pipes using piping machines.

Followed safe work practices, which included fall protection and personal protective equipment.

Performed tests to check quality of pipe and piping systems and make adjustments as necessary.

• Coordinated movement of materials and equipment to job sites. Identified equipment and production non-compliance issues and notified foreman to facilitate resolution.

Interpreted blueprints to determine locations, quantities and sizes of materials required.

• Measured, threaded and cut materials to correct angles. Read and interpreted blueprints and schematics to determine locations, quantities and sizes of materials required.

Fabricated and installed screw pipe, socket weld pipe and stainless steel tubing.

• Threaded pipes using piping machines.

Followed safe work practices, which included fall protection and personal protective equipment.

Performed tests to check quality of pipe and piping systems and make adjustments as necessary.

Identified equipment and production non-compliance issues and notified foreman to facilitate resolution.

Appropriately fitted pipes by identifying dimensions, sizes and shapes needed to replace faulty pipes.

Interpreted blueprints to determine locations, quantities and sizes of materials required.

Fabricated and installed screw pipe, socket weld pipe and stainless steel tubing.

Pipe Foreman, 10/2014 to 08/2015

Foster Wheeler - La Porte, TX

Superintendent, 11/2013 to 10/2014

Burrow Global - Deer Park, TX

• Threaded pipes using piping machines.

Followed safe work practices, which included fall protection and personal protective equipment.

Performed tests to check quality of pipe and piping systems and make adjustments as necessary.

• Coordinated movement of materials and equipment to job sites. Identified equipment and production non-compliance issues and notified foreman to facilitate resolution.

Appropriately fitted pipes by identifying dimensions, sizes and shapes needed to replace faulty pipes.

Interpreted blueprints to determine locations, quantities and sizes of materials required.

Fabricated piping pieces and components in line with design specifications for each system.

Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.

Supervised layout, assembly and installation of various sizes and types of drainage pipes.

• Reviewed and approved employee time reporting.

Liaised between field engineers and trade workers align construction projects with drawings and specifications.

Oversaw daily operations at site, keeping team production moving at optimal pace.

• Analyzed job cost reports to verify within budget production. Inspected sights to evaluate safety, operations and crew performance against objectives.

• Carried out day-day-day duties accurately and efficiently. Managed complete construction process to maximize quality, cost-controls and efficiency.

Supported project coordination and smooth workflow by coordinating materials, inspections and contractor actions.

Reviewed plans and inspected ongoing construction to keep work in line with project goals.

• Maintained safety onsite and upheld all OSHA regulations by [Action]. Created professional development plan to cultivate and advance skillsets of all employees.

Planner Coordinator, 01/2013 to 11/2013

Englobal Management - Beaumont, TX

Pipefitter Foreman, 01/2012 to 01/2013

Performance Construction - La Porte, TX

General Foreman, 11/2011 to 01/2012

H B Zachry - La Porte, TX

Prioritized schedules to meet project goals and overall customer satisfaction.

Recognized potential issues with inventory and quality control and engineered changes.

Cultivated and strengthened relationships with new clients and educated clients on account services and capabilities.

Worked directly with production personnel to resolve production scheduling issues and conflicts.

Utilized and updated spreadsheets to determine customer demographics.

Engaged in both long and short-term project planning, from January to November, strategizing for on-time, high-quality deliverables.

• Employed accurate forecasting to increase efficiency and reduce waste. Followed safe work practices, which included fall protection and personal protective equipment.

Performed tests to check quality of pipe and piping systems and make adjustments as necessary.

• Threaded pipes using piping machines.

Fabricated and installed screw pipe, socket weld pipe and stainless steel tubing.

• Coordinated movement of materials and equipment to job sites. Identified equipment and production non-compliance issues and notified foreman to facilitate resolution.

Monitored safety compliance to maintain strict standards and protect team members from harm.

Monitored priorities and liaised between maintenance team and management, delegating tasks to complete on time.

Efficiently assisted service workers with problematic transactions to maintain customer satisfaction and quickly rectify issues.

Kept watchful eye on equipment inventories, optimizing work readiness and aligning supplies with specifications for each job.

Monitored equipment, tools and system upgrades to compile data into detailed reports for upper management.

Reviewed and studied blueprints to double-check installation and implementation project requirements.

EDUCATION

High School Diploma, 06/1985

Harlingen High School - Harlingen, TX

CERTIFICATIONS

NCCER in Pipefitter / TWCI, Expires Dec.11 2024

#2157370 Houston Area Safety Council - 19 Plus Ref. First Aid & Safety Course

CPR Training

10 Hour OSHA training

Hazardous Materials Training

• Completed final walkthroughs at job sites to close out projects. Worked alongside team to accomplish work goals according to schedule.

Reviewed blueprints, specifications and drawings to fully understand project scope ahead of time.

Kept teams properly supplied with materials, tools, plans and supplementary assistance to meet project deadlines.

Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.

Ordered necessary supplies and materials required for installation of new work and remodeling of existing systems.

Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.

Liaised between field engineers and trade workers align construction projects with drawings and specifications.

Maintained cost-effective inventory of spare parts to help achieve production goals.

Supervised layout, assembly and installation of various sizes and types of drainage pipes.



Contact this candidate