Post Job Free

Resume

Sign in

Civil Engineer Quality Assurance

Location:
Bel-Air, 1227, Philippines
Posted:
November 07, 2023

Contact this candidate

Resume:

CURRICULUM VITAE (CV)

Proposed Position :

Name of Firm :

Name : Anthony T. Masagca

Profession : Civil Engineer

Date of Birth : September 02, 1980

Years with Firm/Entity : 20 yrs.

Nationality : Filipino

Membership in

Professional Societies : Philippine Institute of Civil Engineer (PICE)

Key Qualifications:

Seasoned, detail-oriented Civil Engineer presenting 20 years’ experience leading design, quality inspections and full life-cycle construction of multimillion-peso public works including roads, tunnels, bridges, and buildings.

* Leverage deep critical thinking and innovative design skills to develop historic, environmentally sensitive public works projects erected upon sound construction principles and within established budgets and timeframes.

* Proven leadership and project management talents exercised throughout site selection, analysis, planning, design, and construction phases.

* Diligent in submitting all permit applications and other documentation to local and government.

* Superb knowledge of all governing civil engineering standards, requirements, and guidelines.

* Technical proficiencies include Microsoft Office, MS Project, Box (PIMS) Civil 3D, and AutoCAD.

Education:

Bachelor of Science in Civil Engineering

Catanduanes State University, 2003

Registered Civil Engineer, PRC No. 0098731

Trainings/Seminars Attended:

●Computer Aided Drafting and Design (AutoCAD 2D, 3D and colour rendering), VITS, Virac Catanduanes, April 29, 2005 (1 day)

●Mass Practical Skill Training in Computer Literacy in Catanduanes, CATNET, Virac Catanduanes, May 15, 2010 (1 day).

●As-is Workshop for Quality Assurance Consultant in the Conduct of Civil Works Project Assessment/Inspection in Luzon Area, Bureau of Safety DPWH Central Office Manila, April 20-22, 2015 (3 days).

●Post–Installed Anchor Technology Seminar, PERT Consult International, Metro Manila, June 25, 2015 (1 day).

●Construction Occupational Safety and Health (COSH), Quezon City, March 12-13,19-20, 2016 (4 days).

●Concrete Innovations and Solutions (Philippine Concrete Industry Association), One Café, One Corporate Center, Julia Vargas Avenue, Ortigas Pasig City, September 27, 2017 (1 day).

●Training on Quality Assurance for Project Assessment / Inspection (As-Is Workshop), Bureau of Quality and Safety - DPWH Central Office, Port Area Manila, May 8 - 10, 2018 (3 days).

●Trans-Tech System Non-Nuclear Density Gauge, Max’s Scout Tuazon, Quezon City, September

●PICE (Philippines Institute of Civil Engineers Inc.) 44th National Convention and Technical Conference, 29-31 October 2018 at the SMX Convention Center, Seashell Lane, MOA Complex, Pasay City

Theme: “Integrating Advanced and Digital Technology in Building Infrastructure”

TRANSPORTATION ENGINEERING SESSIONS

oIntelligent Transportation System

oTransport Demand Model

oGIS Application in Transport Planning

oAppropriate Transport Technology Selection for Urban Areas

GEOTECHNICAL ENGINEERING SESSIONS

oSoil Improvement by Grouting

oStudy of Watershed Morphological Features for Estimation of Dependable Specific Discharge flow of Ungauged Rivers in Cagayan River Basin

oPresentation of Diaphragm Wall Construction and Supervision

oThrust Restraint Design for the Buried Pressure Pipelines of the Water Security Mega Reservoirs Project – GTC 626/2014B Package.

ENVIRONMENTAL AND ENERGY ENGINEERING SESSIONS

oSolar Photovoltaic (Pv) Systems: Introduction and Structural Design Overview

oDesign and Development of Straw Bale House

oProspects of Waste-to-Energy Technologies in the Philippines

oManaging Disaster Wastes in the Philippines

STRUCTURAL ENGINEERING SESSIONS

oSeismic Hazards for Filipino Engineers

oProbabilistic Seismic Ground Motion Hazard Assessment of Metro Davao Using Vs30 Site Model

oDeveloping Risk Assessment Method for High Rise Building Projects in the Philippines

oComparison of Wind Pressures Using Wind Tunnel Test (WTT), the Prescriptive Approach (NSCP 2015) and Computational Fluid Dynamics (CFD) in the Case of Cooling Towers for Geothermal Power Plants

PROJECT MANAGEMENT AND CONSTRUCTION ENGINEERING SESSIONS

oProject Managers: Contractor’s Friend, Client’s Foe or Client Friend, Contractor’s Foe

oApplication of BIM Technology for the Waterfront Commercial District – Junction 9 Pergola Bridge

oThe Construction of the Widest Underground Road Tunnel Expressway (Twin Box Tunnel) Under the Sea

oCivil Engineering and Sustainable Development Goals (SDGs) Future Challenges in Building Resilient Towns and Cities

WATER ENGINEERING SESSIONS

oPlanning and Implementing Sustainable and Efficient Small Towns Water Supply Projects in the Philippines

oDam Safety Requirements

oHydraulic Analysis and Engineering of Roxas Boulevard Seawall Against Storm Surge and Typhoon Waves

oPlanning and Design for a Mines Tailings Management Facility (MTMF)

●PICE (Philippines Institute of Civil Engineers Inc.) 1st WEBINAR Lecture Series

oIS SARS-COV-2 IN MY WATER OR SEWER SUMMARY OF THE CURRENT SCIENCE

oGEOSYNTHETIC APPLICATIONS TO CIVIL ENGINEERING

oCONSTRUCTION MANAGEMENT PLAN FOR A 17KILOMETER DRAINAGE SYSTEM (FLOOD CONTROL STRUCTURE) FOR A RAIL PROJECT IN CENTRAL LUZON

oREBOOTING PUBLIC TRANSPORT FOR THE NEW NORMAL: IMPERATIVES FOR INFORMATION EXCHANGE AND COLLABORATIVE GOVERNANCE

oSEISMIC DESIGN OF RC BEAMS OF SPECIAL MOMENT FRAMES ACCORDING TO NSCP 2015

●MIDAS IT Philippines – MIDAS Soil Works Webinar for Geotechnical Analysis of Flood Control Projects held on June 30, 2020

oTopic 1 – Seepage Analysis

oTopic 2 – Slope Stability Analysis

oTopic 3 – 1D Consolidation Analysis

●PICE (Philippines Institute of Civil Engineers Inc.) with the topic “Updates on the Build Build Build Program of the Government: Challenges during COVID-19” held on July 4, 2020, at 2:00 – 4:00 thru the Zoom Cloud Meeting App

●PICE (Philippines Institute of Civil Engineers Inc.) 2nd WEBINAR Lecture Series “REBOOTING PUBLIC TRANSPORT: From Where to New What” held on June 08, 2020, at 3:00 – 5:00pm thru the Zoom Cloud Meeting App

●USHER Technologies Inc. – “Disaster Resilience: Making Government Policies Work in Promoting Disaster Resilient Public and Private Infrastructures” last July 17, 2020, at 12:30 – 4:30 PM, held thru the Zoom Cloud Meeting App

●USHER Technologies Inc. – “Disaster Resilience: The Benefits of Building Instrumentation in Promoting Disaster Resilient Community” last July 18, 2020, at 12:30 – 4:30 PM, held thru the Zoom Cloud Meeting App

●USHER Technologies Inc. – “USHER Resilience Conference 2020” last July 24, 2020, held thru the Zoom Cloud Meeting App

●USHER Technologies Inc. – “A Global Call for Infrastructure Resilience last July 24, 2020, held thru the Zoom Cloud Meeting App

●Bentley Institute – Bentley Structural Technology for Concrete Building held on July 23, 2020, thru Zoom Cloud Meeting App

●Bentley Institute – Bentley Structural Technology for Steel Building held on July 24, 2020, thru Zoom Cloud Meeting App

●UP Diliman, College of Engineering (Institute of Civil Engineering) – 5th UP ICE Webinar with the topic “Adapting the Philippine Building Act of 2020 with S&T Innovations in Regulations and Standards for a New Normal” held on July 24, 2020, from 3:00 – 5:00 PM via Zoom Video Webinar

●Bentley Institute – Civil Technology: Bridge Part 1 held on August 18, 2020, thru Zoom Cloud Meeting App

●Bentley Institute – Civil Technology: Bridge Part 2 held on August 19, 2020, thru Zoom Cloud Meeting App

●Bentley Institute – Civil Design Solutions for Roads Part 3: Multi Discipline Collaboration in Civil Projects held on August 20, 2020, thru Zoom Cloud Meeting App

●MYKAR Driven by Excellence – “The Philippine Roads, Bridges, and Tunnels Virtual Summit” last September 16 and 17, 2020, via Zoom & Facebook live

●Bentley Institute – Civil User Conference 2021: Keynote held on June 15, 2021, thru Zoom Cloud Meeting

●Bentley Institute – Civil User Conference 2021: Digital Workflows for Track Maintenance Workflows with Open Rail Designer held on June 16, 2021, thru Zoom Cloud Meeting

●Bentley Institute – Civil User Conference 2021: Open Roads Designer: The Ultimate Roadway Design Software held on June 16, 2021, thru Zoom Cloud Meeting

●Bentley Institute – Coffee Corner: Structural for SEAPAC – Complete Workflow for Liquid Retaining Structures held on June 17, 2021, thru Zoom Cloud Meeting

●Bentley Institute – Digital Tools for Rail Projects from Owner/Operator Perspective held on June 22, 2021, thru Zoom Cloud Meeting App

●PICE (Philippines Institute of Civil Engineers Inc.) – 2021 PICE Virtual Midyear National Convention and Technical Conference with the theme “The Future Now of Digital and Data-Driven Civil Engineering Practice” held on June 25-26, 2021, for two days hybrid online application

●DPWH Head Office - Training on Quality Assurance for Project Assessment / Inspection (As-Is Workshop), Bureau of Quality and Safety - DPWH Central Office, Port Area Manila, held on August 25 – 27, 2021 (3 days) via Zoom Application.

●Bentley Institute – Day 1: Industry Session – Digital Transformation for Transportation held on September 3, 2021, thru Zoom Cloud Meeting

●Bentley Institute – Day 2: Industry Session – Digital Transformation for Energy Utilities held on September 3, 2021, thru Zoom Cloud Meeting

●Bentley Institute – Day 2: Industry Session – Digital Transformation for Water Utilities held on September 3, 2021, thru Zoom Cloud Meeting

●Bentley Institute – Day 2: Industry Session – Integrated Project Controls for Real Estate held on September 3, 2021, thru Zoom Cloud Meeting

●MIDAS Civil: Design and Analysis of Pier and Rail Structure held on September 29, 2021

●Pinoy Builders in partners with Holcim – “Prevention and Troubleshooting Concrete Problems Webinar” held on September 29, 2021

●Pinoy Builders in partners with Holcim – “Safety First: Learn and Implement DOLE’s Department Order No. 13, Guide in Construction Industry” held on October 20, 2021

●MIDAS IT Philippines – NSCP 2015 in Midas Gen V3.1, release online seminar held on October 14, 2021

●MIDAS IT Philippines – Midas Presents: Experiencing the Advanced Features of Midas, release online seminar held on October 14, 2021, via Goto Webinar Platform

●Bentley Institute – Coffee Corner: Open Rail Designer – Efficient Rail Crossover Designs held on October 27, 2021, thru Zoom Cloud Meeting

●Maccaferri – Solutions to Mitigate Road Slope Disasters Session 2: Countermeasures Against Landslide & Road Slips conducted by Maccaferri Philippines held on October 27, 2021

●MIDAS IT Philippines – Midas Presents: Experiencing the Advanced Features of Midas, release online seminar held on October 28, 2021, thru virtual mode

●UPSWING Learning Center – Slope Stability Analysis of Embankment and Dams held on December 5, 2021, from 8:00 AM to 5:00 PM

●Pinoy Builders in partners with Holcim – “New Trends and Innovations in Construction Technology” held on January 26, 2021

●SketchUp Reseller (Maximum Solutions Corporations) – SketchUp Webinar Session of Maximum Solutions Corporation entitled “Design on-the-go with SketchUp Pro” held on April 19, 2022, via Zoom Cloud Meeting App

●XSTRUCTURES – 16hour training/workshop, with hands-on software application entitled “Project Planning and Management using MICROSOFT PROJECT” held at ADB Project Office, DPWH 2nd Street, Pot Area, Manila this 11th to 12th day of June 2022

●PICE 48th National Convention and Technical Conference held on Friday, 11th November 2022 to Saturday, 12th November 2022 at the SMX Convention Center, 3rd Level, SM City Bacolod, Bishop Antonio Y. Fortich Avenue, Bacolod City and via Hybrid Meeting Application

Experience Record:

(1)PERIOD OF ASSIGNMENT : January 30, 2023 - Present

DURATION OF ASSIGNMENT : 18months (1.5yrs.)

NAME OF EMPLOYER : Woodfield’s Consultants Inc.

CLIENT : Department of Public Works & Highways (DPWH)

PROJECT TITLE : ADB LOAN NO.3631-PHI, IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT PHASE 2

MAIN PROJECT FEATURES : Feasibility Study and Detailed Engineering of 8 contract packages.

1.SP-1 - Zamboanga East Diversion Road (with Viaduct Structure), Province of Zamboanga City

2.SP-2 – Isabela City Malamawi Island Bridge, Province of Basilan

3.SP-3 – Rehabilitation / Improvement Zamboanga City -Ipil National Road, Zamboanga City Boundary Section (with Exceptions), Province of Zamboanga City

4.SP-4 – Construction of Bypass and Diversion Road: Jct-Sindangan-Siayan-Dumingag-Mahayag Road to Jct. Liloy-Ipil Road (Molave-Midasalip-Siayan-Tampilisan Section)

5.SP-5 – Construction of Boulevard along Ipil Coastline, Ipil Zamboanga Sibugay Province, Province of Zamboanga Sibugay

6.SP-6 – Jct Davao-Bukidnon Road (Calinan Section)-Wangan-Subasta-Tagakpan-Tungkalan-Tagurano-Bayabas-Catigan-Baracatan-Sibulan-Tibolo-Kapatagan Road (Viaduct)

7.SP-7 – Construction of Mauboh, Patikul-Tanjug, Indanan Diversion Road, Province of Jolo, Sulu

8.SP-8 – Construction / Rehabilitation / Improvement of Sulu Circumferential Road (with Exceptions), Province of Sulu

LOCATION OF PROJECT : MINDANAO AREA

PRINCIPAL POSITION HELD : Pavement Engineer

DESCRIPTION OF DUTIES

AND RESPONSIBILITIES : Coordinate and supervise the conduct of detailed design of road/pavement and related road works for the identified projects.

Conduct a comprehensive study and evaluation of the existing pavement structure to determine the appropriate improvement/upgrading that is technically and economically justified.

Attended site/joint investigation, inspections, and meetings with the project team, Contractor/s, and Client if needed.

Provide an update on work performance and submit reports to the Project Management Team; and

Perform other tasks delegated by the Team Leader or as required in the contract documents or TOR which are considered essential for the satisfactory performance of the consultancy services and the successful completion of the project.

(2)PERIOD OF ASSIGNMENT : December 1, 2021, to January 30, 2023

DURATION OF ASSIGNMENT : 16months (1.3yrs.)

NAME OF EMPLOYER : CTII Engineering International Co. Ltd

CLIENT : Department of Public Works & Highways (DPWH)

PROJECT TITLE : ADB LOAN NO.3769-PHI, EMERGENCY ASSISTANCE FOR RECONSTRUCTION AND RECOVERY OF MARAWI - OUTPUT 2 RECONSTRUCTION AND DEVELOPMENT PLAN FOR A GREATER MARAWI-STAGE 2 MARAWI CITY, LANAO DEL SUR

MAIN PROJECT FEATURES : Construction Supervision (Reconstruction and Development Plan for Greater Marawi-Stage 2) with 8 contract packages.

1.Contract Package 1A: Rehabilitation of Existing Trans-central Roads

2.Contract Package 1B: Rehabilitation of Existing MSU Roads

3.Contract Package 1C: New Construction of 5 Trans-central Roads & Drainage

4.Contract Package 2: Construction of Malabang Viaduct, Access Road & Drainage

5.Contract Package 3: Construction of Main Drainage and Two Connecting Bridges

6.Contract Package 4A: Construction of Rorogagus Bridge

7.Contract Package 4B: Construction of Cabasaran-Bangco Bridge, Guimba Bridge and Kormatan Matampay Bridge

8.Contract Package 5: Slope Protection in Marawi-Bito Road Upper and Lower Slopes; and TR-28 Rehabilitation of Road along Marawi-Bito Road; TR-29 – Rehabilitation of Lasureco Road

LOCATION OF PROJECT : MINDANAO AREA

PRINCIPAL POSITION HELD : Technical Representative / Quality Manager

DESCRIPTION OF DUTIES

AND RESPONSIBILITIES : Verifying the implementation and operation of the quality assurance and control systems, by planning and conducting internal quality audits and inspection activities on the project site offices.

Verifying that the client quality policy is fully understood, implemented, operated and maintained.

Ensure implementation and continuous improvement in overall Quality Systems.

Ensure that all Contractors, Sub Contractors and local authority requirements for Quality, Health Safety and Environment requirements are complied with.

Review, update and control, the distribution of the Quality Management Procedure, Quality Manual and related procedures for the Project.

Generate project-specific quality plans for the Project.

Ensuring adequate training/awareness of the Contractors’ personnel for Quality Systems.

Prepare where necessary, statistical data which will show quality trends for the management review meeting.

Ensure Client Satisfaction is monitored/ measured, and improvement/corrective actions are taken for weak areas.

Ensure that all non-conformance issues are promptly investigated, corrective and preventive actions are proposed/implemented and are quickly closed out.

Ensure that the Contractors’ quality requirements of the project are fully communicated to all key personnel so that their roles in fulfilling these requirements are fully understood.

Ensure that all subcontractors’ quality systems and plans are acceptable to the Client as applicable to the “Project Contract”.

Ensure that the Subcontractor’s / Supplier’s quality systems are implemented and effective.

Ensure that the calibration of all inspection, measurements and test equipment is conducted according to the Quality Control Plans.

Conduct reviews of the approved suppliers and subcontractors’ list.

Liaise with the Clients quality representative, to ensure that all potential and actual quality issues are fully resolved.

(3)PERIOD OF ASSIGNMENT : June 1, 2020, to November 31, 2021

DURATION OF ASSIGNMENT : 18months (1.5yrs.)

NAME OF EMPLOYER : CTII Engineering International Co. Ltd

CLIENT : Department of Public Works & Highways (DPWH)

PROJECT TITLE : ADB LOAN NO.3769-PHI, EMERGENCY ASSISTANCE FOR RECONSTRUCTION AND RECOVERY OF MARAWI - OUTPUT 2 RECONSTRUCTION AND DEVELOPMENT PLAN FOR A GREATER MARAWI-STAGE 2 MARAWI CITY, LANAO DEL SUR

MAIN PROJECT FEATURES : Feasibility Study and Detailed Engineering Design (Reconstruction and Development Plan for Greater Marawi-Stage 2) with 8 contract packages.

1.Contract Package 1A: Rehabilitation of Existing Trans-central Roads

2.Contract Package 1B: Rehabilitation of Existing MSU Roads

3.Contract Package 1C: New Construction of 5 Trans-central Roads & Drainage

4.Contract Package 2: Construction of Malabang Viaduct, Access road & Drainage

5.Contract Package 3: Construction of Main Drainage and Two Connecting Bridges

6.Contract Package 4A: Construction of Rorogagus Bridge

7.Contract Package 4B: Construction of Cabasaran-Bangco Bridge, Guimba Bridge and Kormatan Matampay Bridge

8.Contract Package 5: Slope Protection in Marawi-Bito Road Upper and Lower Slopes; and TR-28 Rehabilitation of Road along Marawi-Bito Road; TR-29 – Rehabilitation of Lasureco Road

LOCATION OF PROJECT : MINDANAO AREA

PRINCIPAL POSITION HELD : Civil Engineer / Assistant Design Team Lead

DESCRIPTION OF DUTIES

AND RESPONSIBILITIES : Wrote the technical methodology of project proposals for bidding, including preparation of estimated work program schedule and the project procurement plan considering the government procedures.

Study and recommendation of packaging schemes appropriate for the project.

Preparation of Bidding documents in conformity with ADB Procurement Policy (2021, as amended from time to time) and with the applicable Philippine laws.

Preparation of specifications for specific items of work or methods of construction, measurement and payment not covered by the Specifications for Highways and Bridges and Airports, 2012.

Assistance in the preparation of evaluation criteria for tender/bidding.

Assist in conducting comprehensive study and evaluation of existing pavement and drainage structure to determine the appropriate improvement/upgrading that are technically and economically justified.

Assist to perform highway preliminary and final analysis and design on all sub-projects as directed by the Team Leader/Assistant Team Leader.

Assist in preparation of Pavement Design Report, Highway and Geometric Design Report, Hydrologic Analysis and Hydraulic Computation (Drainage Report), and including the Monthly Progress Report.

Assist Pavement Design Engineer, Drainage Engineer/Hydrologist and Bridge Engineer to lead, coordinate and supervise the conduct of detailed design of bridge, drainage, pavement, and related road works for the identified projects.

Discussion with and assistance to the concerned engineers relative to the design requirements

Computation of all quantities for each contract to an acceptable accuracy and prepare Bill of Quantities.

Preparing detailed analysis of all applicable unit prices for each contract using current cost indices, rates, etc.

Supervise the preparation of design drawings of all sub-projects.

Survey and investigation of the present condition of materials supply system, availability of construction machines / equipment and accessibility to the project sites and collection of data of similar construction works in the past

Examination and analysis of the rate of progress concerning workforce and equipment.

Preparation of construction methods for work items.

Preparation of construction sequence over the project duration.

Survey and investigation of market condition including prices of materials, depreciation/operation cost of construction machines and equipment, wages, taxes, and duties.

Establishment of pay items anticipated in the construction works.

Computation of all quantities for each contract to an acceptable accuracy and prepare Bill of Quantities.

Prepare a detailed analysis of all applicable unit prices for each contract using current cost indices, rates, etc.

Preparation of cost estimates

Perform other duties and responsibilities that will be required by the Employer and ADB.

(4)PERIOD OF ASSIGNMENT : April 16, 2018, to April 15, 2020

DURATION OF ASSIGNMENT : 24months (2.0yrs.)

NAME OF EMPLOYER : PERT Consult International

CLIENT : Department of Public Works & Highways (DPWH)

PROJECT TITLE : QUALITY ASSURANCE CONSULTANT IN THE CONDUCT OF CIVIL WORKS PROJECT ASSESSMENT/INSPECTION IN THE LUZON AREA

MAIN PROJECT FEATURES : Project assessments on the quality of construction and compliance with plans and specifications of both ongoing and completed Road and Bridges and other Infrastructure Projects of DPWH District Offices within Luzon. Fifty (50) projects every quarter of the year.

LOCATION OF PROJECT : LUZON AREA

PRINCIPAL POSITION HELD : Sr. Civil Engineer (Quality Assurance Consultant)

DESCRIPTION OF DUTIES

AND RESPONSIBILITIES : Senior Civil Engineer in the regular inspection/assessment of projects four (4) times a year.

Senior Civil Engineer in the investigation of complained projects.

Senior Civil Engineer in checking compliance of materials quantity and quality construction methods.

Conduct appropriate non-destructive tests for all structures, when necessary, e.g., core drilling for PCCP and ACP to verify the actual thickness and strength of in-placed concrete and the quality of asphalt mix based on approved design mix and job-mix formula, respectively.

Verify materials on-site by submission of samples at BR’s laboratory to check compliance with the specification requirements.

Senior Civil Engineer in the submission of detailed inspection/assessment report stating the summary of defects and deficiencies thru the web-based QAU Reporting System of the DPWH

Senior Civil Engineer in the preparation of Investigation Report with corresponding analysis of findings and recommendations, including action memorandum to be submitted to the office of the University.

Responsible for monitoring recommended course of action on the defects/deficiencies forwarded to the concerned implementing office.

Review and evaluate project documents prior to inspection and assessment.

Assist the Head Consultant in the preparation of the Completion Report and all required reports.

Perform all other items works not specifically mentioned but which are necessary and essential to successfully comply with the terms of the contract of QA Consulting Services

(5)PERIOD OF ASSIGNMENT : December 12, 2017, to July 22, 2018

DURATION OF ASSIGNMENT : 7 months (0.58 yrs.)

NAME OF EMPLOYER : PERT Consult International

CLIENT : San Miguel Corporation

PROJECT TITLE : Proposed Skyway Runway Toll Plaza

MAIN PROJECT FEATURES : NAIA Expressway II is the continuation of Phase I and includes the extension of the expressway all the way to Roxas Boulevard in Paranaque City via Andrews Avenue, Domestic Road, and NAIA Road. Road.

LOCATION OF ASSIGNMENT : TAGUIG CITY, METRO MANILA

PRINCIPAL POSITION HELD : Jr. Civil Engineer (Highway and Drainage Engineer)

DESCRIPTION OF DUTIES

AND RESPONSIBILITIES : Assist in reviewing/checking shop drawings for drainage construction, submittals and method statements being submitted by the Contractor,

Responsible for the inspection of all drainage work for conformity with plans and specifications.

Inspection and monitor accomplishments related to drainage works including the installation of deck drains and downspouts, laying of culverts and construction of catch basins and manholes among others.

Prepare site observations, if deemed necessary for the construction

Prepare and submit daily construction reports.

Assist in reviewing/checking of As-built drawings

Perform other duties assigned by superiors from time to time.

(6)PERIOD OF ASSIGNMENT : October 6, 2015, to December 12, 2017

DURATION OF ASSIGNMENT : 25 months (2.08yrs.)

NAME OF EMPLOYER : PERT Consult International

CLIENT : Department of Public Works & Highways

PROJECT TITLE : QUALITY ASSURANCE CONSULTANT IN THE CONDUCT OF CIVIL WORKS PROJECT ASSESSMENT/INSPECTION IN LUZON AREA

MAIN PROJECT FEATURES : Project assessments on the quality of construction and compliance with plans and specifications of both ongoing and completed Road and Bridges and other Infrastructure Projects of DPWH District Offices within Luzon. Fifty (50) projects every quarter of the year.

LOCATION OF PROJECT : LUZON AREA

PRINCIPAL POSITION HELD : Jr. Civil Engineer (Quality Assurance Consultant)

DESCRIPTION OF DUTIES

AND RESPONSIBILITIES : Assist the Senior Civil Engineer in the regular inspection/assessment of projects four (4) times a year.

Assist the Senior Civil Engineer in the investigation of complained projects.

Assist the Senior Civil Engineer in checking materials quantity and quality construction methods compliance.

Conduct appropriate non-destructive tests for all structures, when necessary, e.g., core drilling for PCCP and ACP to verify the actual thickness and strength of in-placed concrete and the quality of asphalt mix based on approved design mix and job-mix formula, respectively.

Verify materials on-site by submission of samples at BR’s laboratory to check compliance with the specification requirements.

Assist the Senior Civil Engineer in the submission of a detailed inspection/assessment report stating the summary of defects and deficiencies thru the web based QAU Reporting System of the DPWH

Assist the Senior Civil Engineer in the preparation of the Investigation Report with corresponding analysis of findings and recommendations, including an action memorandum to be submitted to the office of the University.

Responsible for monitoring recommended course of action on the defects/deficiencies forwarded to the concerned implementing office.

Review and evaluate project documents prior to inspection and assessment.

Assist the Head Consultant in the preparation of the Completion Report and all required reports.

Perform all other items works not specifically mentioned but which are necessary and essential to successfully comply with the terms of the contract of QA Consulting Services.

(7)PERIOD OF ASSIGNMENT : December 20, 2010, to August 21, 2014

DURATION OF ASSIGNMENT : 44 months (3.70yrs.)

NAME OF EMPLOYER : ASMAEL General Contracting Est.

PROJECT TITLE : Saudi Aramco Mosque

Al Obeikan Tower

Al Khobar Baladia Municipality

Al Tuwairqi Tower

MAIN PROJECT FEATURES : The project consists of the task of Construction a mixed-use tower comprising 4 basement levels, a ground floor and 30 additional floors, including a five-star hotel consisting of (217) rooms offering amenities such as a specialty restaurant, all-day dining outlet as well as a pool and lobby lounges.

LOCATION OF PROJECT : K.S.A.

PRINCIPAL POSITION HELD : Project Engineer /Company Surveyor/ Quantity Surveyor

DESCRIPTION OF DUTIES

AND RESPONSIBILITIES : Responsible for taking material quantity take-off & estimates at the site.

Responsible for forecasting activities prior to meeting such schedules.

Monitors actual quantity variation to contact quantities and scopes.

Responsible for lay-out of the possible coordinates using the surveying instrument SOKIA SET5X.

Preparing the coordinates/datum layout plan and setting it out on site.

Responsible for making sub-con invoices as per progress accomplishments.

Responsible for reviewing shop drawing for proper implementation of projects.

Direct coordination to consultants regarding project progress and developments of the project

Coordinate with SAPMT, consultants, inspectors, sub-contractors, and third-party agencies concerning project requirements.

Coordinates with all disciplines regarding project technicalities, problem-solving and progress developments for the project.

Responsible for reviewing/checking Final Quantity submittals.

Direct responsibility for the implementation of works and overall supervision of civil, architectural, plumbing, electrical, HVAC and communication works.

Reviewing and anticipating materials needed on site.

Preparing a two-week look ahead prior to implementing at the site.

Strictly instructed and assisted QA/QC in various disciplines for works to be done and instructed them to raise RFI’s for



Contact this candidate