Peter Hunjan’s Profile
Tel: UK +44-795*-******
https://uk.linkedin.com/in/peter-hunjan-16a15949
Email: ad0vsa@r.postjobfree.com
Senior BIM Director
Specialist BIM Consultant & Manager
BIM/CAD Lecturer (London Southbank University London) Asset Codification Management / Building Information Modeling (BIM) Full Life Cycle Project Management / Supply Chain Leadership Accomplished, versatile professional with 36 Years of Industrial Experience with refined expertise driving and supporting the use of digital information across complex projects and business operations. Highly adept holding full accountability for data integrity and compliant knowledge of Asset Codification Management Registers. Quantifiable track record delivering complex BIM-related projects on time, within budget, and in accordance to established specifications. Advanced Technical Capabilities with complementary aptitude training and mentoring personnel in data exchange best practices and in the utilization of various software’s. Highly Skilled and directly interacting with senior leadership to ensure BIM activities align with project / corporate goals. Completed 5 Airport Projects: Heathrow Airport Terminal 5, Gatwick Airport Pier 6, Project HET Heathrow East Terminal 2, Riyad Airport Saudi Arabia, NDIA Qatar and many more covering the entire Building Services Sector
Data Analysis & Requirements BIM Strategy Development Continuous Process Improvement
Standard Procedure Development Asset Codification Management Technical Consultation
Audit Planning & Facilitation Digital Information Strategies BIM Subject Matter Expert (SME)
Common Data Environment (CDE) Team Development & Leadership CAD & BIM Standards Manuals
3D Presentations & Walkthrough Software Hardware Configuration Technical Troubleshooting E D U C A T I O N & C R E D E N T I A L S
Bachelor of Science (Hons) Degree in Building Services Engineering & HND in Building Services Engineering, London Southbank University
HNC Building Services Engineering, Paddington College Bachelor of Technology Diploma in Engineering Illustration, Barnfield College, Luton Autodesk Certified with 9 BIM Certificate’s 3D BIM Consultant & Engineer CAD Line Certified BIM Consultant & Engineer
City & Guilds: 2400 Design Erection & Verification, City & Guilds 730 Teaching & Assessing, City & Guilds 236 Part 1 & Part 2 Electrical Engineering, City & Guilds 4353-3-Dimensional AutoCAD Release 12, City & Guilds 4351 2-Dimensional AutoCAD Release 12. Please also see Supporting Documents attached for Total 31 Certificates & Qualifications Obtained over the span of 36 Years.
Peter Hunjan’s Profile
Technical Skills:
Very Strong Computer Technical and Communication Skills
Ability to seek out and resolve issues through close interactions with team members
Writing and Reviewing a BEP BIM Execution Plans
Writing and Reviewing a BSM BIM Standards Manual
Excellent skills using Navisworks Manage & Bentley Navigator for the elimination and detection of 3D Clashes.
Writing BIM Reports
AutoCAD, Revit, Sketchup professional accountable for the High Quality and Deliverables of 2D Extracted Shop Drawings from BIM Models
Excellent management and leadership skills liaising with Design Engineers, BIM and AutoCAD Staff
Populating Asset Management Register from COBie Data and Creating a COBie Matrix
Self-delivery of technological solutions which includes recruiting, management, and training,
Improving the Performance of internal teams
Develop BIM/CAD QA/QC processes by continuous auditing and improvement.
Specialist in writing hardware Specifications for BIM Workstations to a complete setup for any company
Development and maintenance of BIM documentation to ensure alignment with business policy and industry standards.
Supporting the design and delivery of specific BIM plans during the pre-construction phase and through the life of the projects
Carrying out reviews of the supply chain to assess their competences.
Supporting project teams to ensure the successful implementation of processes and tools.
Conducting audits at key project stages to ensure compliance of BIM processes and standards.
Maintaining an up-to-date knowledge of industry developments, best practice and innovations
Overseeing the implementation of training to raise BIM awareness and competence across the business.
Keeping abreast of the latest tools and technologies available in the market to ensure the BIM strategy is market leading and deliverable.
Working closely with all team members and project requirements to ensure the BIM strategy is optimized and refined to suit the project.
Identifying and streamlining existing procedures and implementing new technologies and process where necessary
Working closely with IT Departments to ensure best use of technology, Measuring, monitoring and reporting progress against agreed targets and Ensuring drawing delivery meets CAD/BIM standard Digital Plan of Work and the requirements for the project BIM Execution plan
Ensure that models meet BIM Level 2, BS1192 which will be superseded with ISO-19650 standards protocols.
Ensure that the design team understands the level of information required to meet the standards.
Coordination and meetings with team leaders and CAD/BIM Managers from other offices and disciplines, ability to ensure best practice using other software packages
Support technical staff to ensure that they are provided with correct up-to-date information software, hardware, training, and technical support that they require to ensure delivery of BIM/CAD data to project requirements.
Validated experience in many other software platforms, having a good understanding of BIM and its direction within the industry.
Clash Detection and Analysis, Creating Clash Matrix’s, Navis Clashes exported to HTML Tabulated 3D Reports
BIM Manager/Lead Consultant in the development and full coordination of models between all disciplines & suppliers
Able to implement and setup a CDE Common Data Environment to the latest wider industry AEC(UK) BIM/CAD protocols in line with PAS 1192 & BS ISO 19650 using BIM Collaboration Pro by Autodesk
Excellent interpersonal skills
Able to write, implement and maintain the BEP (BIM Execution Plan)
Ability to understand Employer Information Requirements and to implement these into the model templates and landing pages of the model
Resolving network issues
Plotter configurations
3D printers Configuration
Peter Hunjan’s Profile
Site 3D Laser Scanner Leica 360 Setup for Scanning Buildings for Point Cloud Data
Lead key stage gates of the BIM model review during the project implementation.
Develop and maintain mechanisms for the use of BIM platforms during and after the operational stage.
Maintain ownership of the 3D model for onward future development as appropriate for Facility Management Asset Registers.
Create Live 3D Presentations for client.
Professional Aconex user
Professional Project Wise user
Adapt to any FTP Site
Professional WeTransfer user
Professional Dropbox User
Creating 3D Animations.
Creating Walkthroughs
4D Scheduling Simulation
5D Cost Management
Generate COBie Data
Winning Tenders for Companies
Peter Hunjan’s Profile
Main Responsibilities:
Development and maintenance of Building Information Modeling with Extraction of Asset Management Registers to ensure alignment with Facility Management Companies business policy and industry standards, Supporting the design and delivery of specific BIM plans during the pre- construction phase and through the life cycle of the projects, Carrying out reviews of supply chain to assess their competence, Supporting project teams to ensure the successful implementation of processes and tools, Conducting audits at key project stages to ensure compliance of BIM processes and standards, Maintaining an up to date knowledge of industry developments, best practice and innovations, Overseeing the implementation of training to raise BIM awareness and competence across the business, Keeping abreast of the latest tools and technologies available on the market to ensure the BIM strategy is market leading and deliverable, Working closely with all team members & stakeholders for project requirements to ensure the BIM strategy is optimized and refined to suit the project, Identifying and streamlining existing procedures and implementing new technologies and process where necessary, Working closely with IT Departments to ensure best use of technology, measuring, monitoring and reporting progress against agreed targets and ensuring deliverables meet BIM/CAD standards, Digital Plan of Work and the requirements for the project BIM Execution Plan, Ensure that models meet BS ISO 19650 International BIM Standards and that the design team understand the level of information required to meet this, Chairing all Coordination meetings with team leaders and CAD/BIM Managers from other offices and disciplines, ability to ensure best practice using other software packages, Support technical staff to ensure that they are provided with the information, software, hardware, training and technical support they require to ensure delivery of BIM/CAD data to project requirements, I have validated experience in many other software platforms, having an excellent understanding of BIM and its direction within the industry. Experience of Advanced Level Clash Analysis tools such as Navisworks Manage & Bentley Navigator having worked as a BIM Director & Senior BIM Consultant and Lead Manager in the development of coordinated models between disciplines and suppliers, I have an excellent understanding and appreciation of Various CDE’s and have implement a Common Data Environment BIM Collaboration Pro on projects with the latest wider industry AEC(UK) BIM/CAD protocols, Excellent interpersonal skills, Able to write, implement and maintain a BEP BIM Execution Plans. Fully understand Exchange Information Requirements and to implement data into 3D models, Compliance with BIM/CAD standards and Quality Assurance procedures, demonstrating live 3D Presentations for the Client and Stakeholders. Through my hard work honesty and Dedication towards the industry I have achieved the following results completing projects worldwide.
Peter Hunjan’s Profile
Projects Completed & Experience
Diriyah Gate Development
– March 2023 till Present
Hammad International Airport
– Oct 2020 to July 2022
Intel Ireland – Oct 2019 Sept 2020
Senior BIM Director & Consultant
Spearheaded this project, Managed and maintained project content and sourced any additional Data content as when required Coordinate and Manage BIM Project Data sets/workflow and project setup Providing BIM Expertise to the client DGCL on the Diriyah Gate Development Covering all Multiple Aspects of the Project – from Concept Design Stage LOD 100 Working to a single Source of Truth in line with BS ISO-19650 International Standards Collaboration of all BIM Teams working from One Common Data Environment using ACC Autodesk Construction Cloud BIM 360 Onboarding of all LDC’s Lead Design Consultants to the Project Assign CDE Seats to the LDC’s Run live workshops on a weekly Basis 3D Presentations Live Walkthroughs Demonstrate the Metro Impact to the Project Telephone Ref: Mr Dan King Director+966-**-***-**** or +966-**-***-****
HIA - Hamad International Airport Expansion Client MATAR Senior BIM Director & Consultant, BIM Asset Management I was involved on the Doha Airport Expansion covering all Multiple Aspects of the Project from Concept Design Stage through to LOD 500 As Built, Daily duties include the review of all 3D MEP, Architectural & Structural Co-ordinated Models of all Disciplines from CCC Package 17 and UBT/JV Package 12, extensively involved in generating the Asset Codification Management Register by Setting up, training courses and Educating all Contractors as well as Hill International. Assisted in Designing a New Master Asset Template for the Contractors to use and Demonstrated all Industry Asset Hierarchy Structures Asset Levels 1 to 6 i.e. Level 4 being the Specific Area, Level 5 the Parent Asset for example the Room and Level 6 being the Child Asset e.g. the Maintainable Assets for example Luminaires, Fire Alarm Panels, Power Sockets, Distribution Boards, Pumps Bearings, Valves etc. all these were taken into consideration when populating the Asset Management Register for the Maintenance Engineers making this a number one priority on the project, Setting up the BIM Operations Meetings and Chairing all Meetings for MATAR
& Dar Al Handasah Company. Telephone Ref: Miss Gloria Saliba Senior Manager
BIM Director & Consultant, Worked on the Life Science Laboratories Since October 2019 on the Intel Project in Leixslip Ireland as a Director - BIM Operations Manager Asset Management Consultant, I was extensively involved in the Daily management of 80 BIM Staff 6 BIM Lead Managers on site. Attending daily meetings for the BIM Operations, Resolving all BIM Issues Raised by the BIM Leads Extracting the percentage of completeness on a weekly basis from all Staff, with completion dates for IFF model submissions to the client, attending Weekly Construction Review meetings, updating the BIM Master construction coordination schedule on a daily basis, working towards one common goal to meet the requirements of the BEP `BIM Execution Plan’ having identified many items for concern, all reviewed comments are submitted through a Constraints log with a true record of events that remains upto date. Working to a model Tolerances Clash Clearance for MEP Services set at +/- 6mm for insulated pipework and Containment, Generated 3D Comparisons for Client and demonstrated overlays with Percentage difference from December 2019 Models to January 2020 Models received from Jacobs and Exyte
Lusail Towers - Dec 2018 to Oct 2019
Lusail Towers
Senior BIM Director & Consultant for Louis Berger & Client LREDC Lusail Real Estate Development Company
Since December 2018 I have been working on the Lusail Towers Project as a Specialist BIM Consultant / Manager, I have been extensively involved in the Review process of LREDC and Foster & Partner Architectural BEP `BIM Execution Plan’ and have identified many items for concern, all reviewed comments are submitted through an OCS which is a Comments Observation Data Sheet and was a true record of events that had to remain upto date. Identifying all aspects of LOD Level of Developments from LOD 100 through to LOD 500, Tolerances Clash Clearance for insulated and uninsulated pipework, File Naming and Colour Codes, File Template and landing page, 3D Model file format change and more, PAS 1192 & BIM Level 2 Requirements.
Peter Hunjan’s Profile
SWAD - Jan 2017 to Dec 2018
Yas Island - April 2017 to Sep 2017
Aug 2016 to Dec 2016
Job Title
Responsibilities
Qatar Rail Green Line Metro
Under Ground Rail
Sea World Abu Dhabi
Senior BIM Director & Consultant for Louis Berger
I have been involved in project SWAD Sea World Abu Dhabi and have been Reviewing all 3D MEP Co-ordination of all Disciplines as well as Architectural & Structural Coordination against the BEP BIM Execution Plan, comparing previous models from December 8th Submissions to January 13th Models, then between January 13th Models verses January 23rd Models, January 23rd Models verses February 23rd Models, and February 23rd Models with March 16 Models using Revit 2017 & Navis Works Manage 2017. Running Clash Detection and generating Tabulated HTML Navis Reports for the Design managers and project managers of Louis Berger & Miral. The Buildings that I am currently reviewing for SWAD are Abu Dhabi Ocean, Blue World, Endless Ocean, Polar Ocean, Sea of Delight, Support Building and Tropical Ocean. I have identified discrepancies between the AutoCAD Drawings and the Models where there were mismatches for example between alignment of Columns and the Architectural model, also identified the WBS Work Breakdown Structure whether it was in line with the agreed WBS, identified Generic models to models that carried correct attributes and proper Revit Families. Demonstrated LOD Definitions from early Concept Design stage LOD 100 through to LOD 500 demonstrated to Miral Model Stages and discrepancies found in the latest set of models through live conference call meetings, discussions involved with all senior managers from Miral discussing Riba Stage 3 Development and how far PGAV had got with their updated Models.
Task involved to Review all 3D MEP Co-ordination of all Disciplines for 3D Models. Generate 3D Report using DWF Viewer and Louis Berger Template for BMO Multipurpose Building, YIY Building and Building YLY, picked up all clashes and clouded each one for submission to the client, the Revit models were then be updated by incorporating all the comments and sent back to me for further analysis. Qatar Rail Green Line Metro Stations
Senior BIM Director & Consultant
Daily tasks would involve Reviewing all 3D BIM Co-ordinated models of all Disciplines and manage a Team of 42 BIM Coordinators and 10 Engineers, Upload onto Project Wise & Aconex all Clash Free 3D BIM Models for the Consultant Hoare Lea to review for Al Messila Station, Hammad Hospital Station, Al Qadeem, Al Shaqab Station, QNL Qatar National Library and the White Palace Station, using Autodesk Revit & Navis 2015 software Disciplines for Electrical, Mechanical & Public Health Services for the Green Line Under Ground Stations, when models were Approved the extraction of 2D Shop Drawings were generated to LOD 350 with Support Bracketry and then to LOD 400 for Manufacturing, simultaneously generated a COBie Matrix for the project. Assess coordination of various disciplines (ensure Architectural, Structural, Mechanical, Electrical, and Public Health models were in Sync.)
• Run clash detection of various 3D Discipline Models
• Perform analysis of overall layout and placement of all devices within the model, show sets and scenic areas.
• Advise client/engineer of issues and mitigation plan within 1 week of receiving updated IFC DWGs
• Directly liaise with specialist vendors to ensure specific model is properly integrated
• Provide timely input and action to specialist vendors where Site Engineering team is not technically or creatively capable to avoid the Project from suffering. accordingly
• Advise for aesthetically pleasing placement of devices and elements into overall model
• Onsite safety envelope validation and clash detection of 3D Model where Peter Hunjan’s Profile
Navis Works 3D Clash Detection
June 2013 / Nov 2015
Job Title
Responsibilities
Lusail Multipurpose Stadium
Aug 2012 / May 2013
Role
Responsibilities
Lekwiya Stadium
Sep 2011 / Jul 2012
Role
Responsibilities
Al Sadd Stadium
timely input was required to field verification & site work.
• Progress was validated by numerous technologies which were included in the overall BIM Plan to monitor construction & track schedule.
• Ensure that project documentation is properly logged, recorded and distributed as required the Communication.
Plan Tracking drawings and documents.
• Keeping incoming and outgoing correspondence logs.
• Advising Project Manager of outstanding correspondence waiting for response.
• Authorizing copies of documents and logging.
• Preparing letters, transmittals and documents.
• Communication distribution.
• Filing and storing project documentation.
• Support project team on producing documents.
Lusail Multipurpose Stadium
Senior BIM Director & Consultant
Review of 3D BIM Co-ordinated models of all Disciplines and to manage a Team of 42 BIM Engineers, generate all 3D Clash Free Models using `Microstation V8i Mechanical Bentley Product Software’- Disciplines for Electrical, Mechanical & Public Health Services for the Lusail Multipurpose Stadium and generate Shop Drawings, Uploading the Data to Client FTP site and submit all models to DCG. Perform analysis of overall layout and placement of facility devices within show sets and scenic areas to ensure aesthetically pleasing Provide timely input and action to specialist vendors where Site Engineer team is not technically or creatively capable to avoid the project from suffering accordingly.
Lekwiya Stadium
Senior BIM Director & Consultant
MEP Co-ordination of all Services managing a Team of several Draughtsmen, Generating all Shop Drawings for all Disciplines using `Autodesk Product Software’- Disciplines included the coordination of all MEP, Architectural verses Structural overlays with Mechanical, Electrical & Public Health Services for the Lekwiya Stadium created all 2D CSD’s with Combined Services Shop Drawings which were Uploading on a regular basis, project was completed at the Stadium WSP Project site office in Qatar, and successfully submitted all Shop Drawings to the client for final approval, all drawings were approved. Al Sadd Stadium
Senior BIM Director & Consultant
Review all 3D BIM Co-ordination of Security Services and to Generate all 2D Shop Drawings for the Al Sadd Stadium using Autodesk Product Software’- Disciplines for CCTV Security Systems and Electrical Devices for the Al Saad Stadium, ensure that project documentation is properly logged, recorded and distributed as required, Communication Plan and Tracking of drawings and documentation, Keeping incoming and outgoing correspondence log.
Peter Hunjan’s Profile
Aug 2011 / Jul 2012
Role
Responsibilities
Qatar National Library
Aug 2009 / Jul 2011 (2 Years)
Role
Responsibilities
7 Star Sidra Hospital
January 2009 / July 2009
Canary Wharf
March 2006 / January 2009
Terminal 2 Heathrow Airport
Jan 2006 / March 2006
Bishopsgate Development
Qatar National Library
Senior BIM Director & Consultant
Daily tasks would involve attending site meetings with all the contractors to eliminate BIM Architectural, Structural, Mechanical, Electrical & Public Health Services Clashes and Co- ordinate with the Structural Engineer and the Architect. I was based on site to Manage 16 BIM CAD Engineering Coordinators. The work involved revising and submitting all BIM Models with 2D Extraction of Layouts to time & budget from Preliminary to IFC Rev 6 Shop Drawings, I also created & demonstrated to the client Louis Berger 3D Animations and Walkthrough from the Live Models for all presentations. (Using Navis Works 2012, Revit MEP 2012, & AutoCAD 2012)
Project Sidra (The World’s first 7 Star Hospital) in Qatar Senior BIM Director & Consultant
(Using Revit MEP 2010, AutoCAD 2010, CAD-Duct, & Navis Works Attend all site meetings with the Consultants & Contractors to Review & Coordinate from the Architect Peli, Structural, Mechanical, Electrical & Public Health Services Clashes and fully Co- ordinate BIM Models for the Clinic Building as well as the Hospital Building with the Structural Engineers and Architects. I was based on site to Manage & give Training to 72 AutoCAD & BIM Technicians; at the same time revising and submitting all Single Services MEP Drawings to time & budget from the Preliminary stages through to LOD 500 for the extraction of Shop Drawings, I also generated all the 3D Animations and Walkthrough presentation for QP Qatar Petroleum for which I received outstanding accolades from all parties.
First Property Services - Canary Wharf
BIM CAD Manager
(Using AutoCAD 2008)
Review & produce CSD Combined Services Drawing, and SSD’s Single Services Drawings for Project Moody’s, RT4 & the Pavilion Full 3D Coordination Using Autocad 2008, and 3D CADDuct,
Hoare Lea: London Heathrow Airport Terminal 2
BIM CAD Manager
(Using 3D SKETCHUP Professional & AutoCAD)
Generate all 3D SKP Models using Sketchup Professional for the Scheme Design of Project HET The Models were generated for BIM M&E Services Drawings using AutoCAD MEP Release 2008, 3D CADDuct, Sketchup 6, AutoCAD Architecture 2008 & Navisworks Timeliner. With Animations
For the (H.E.T.) Heathrow East Terminal Two Project, Heathrow Airport Axima (Bishopsgate Project) Liverpool Street London BIM Consultant Manager (Using CADDUCT)
Review & Co-ordinate 3D Mechanical & Electrical Services Models using AutoCAD Release 2006, Navisworks Jetstream
For the Spitalfields Bishopsgate Development at Liverpool Street Peter Hunjan’s Profile
Oct 2005 / Jan 2006
Terminal 5 Heathrow Airport
Nov 2004 / Oct 2005
Richmond Borough Council
July 2004 / Nov 2004
Wandworth Borough Council
May 2004 / July 2004
Arena Engineering (Enfield)
April 2004 / May 2004
SGM Retail Co.
Jan 2004 / April 2004
Golds Gym London
Jul 2003 / Dec 2003
Gatwick Airport Pier Six Project
Terminal 5 London Heathrow Airport (Hotchkiss)
BIM Manager (Using CADDUCT)
Co-ordinated 3D BIM Mechanical Services Models using CADDUCT with Architectural Desktop & AutoCAD Release 2004
For the T5 Contract Heathrow Airport Project, generate fully coordinated 3D Models for all MEP Disciplines up to LOD400 Manufacturing for the Hotchkiss Fabrication factory Richmond Borough Council
M&E CAD Manager/Coordinator
Design, Survey, create new Architects layouts from scratch, Modify Drawings for various Mechanical & Electrical Services contracts & create Record Drawings using AutoCAD 2004
Wandsworth Borough Council
M&E CAD Manager/Coordinator
Design, Survey, create new Architects layouts from scratch, Modify Cad Drawings for various Mechanical & Electrical Services contracts & to generate Record Drawings using AutoCAD 2004
M&E CAD Coordinator
Design and update existing Cad Drawings for various Mechanical & Electrical Services projects & to produce Record Drawings
S.G.M. Retail CAD Engineer
Design and update existing Retail/feasibility Cad Drawings for Project Threshers And project Costa Using AutoCAD 2004
Golds Gym Vistastar
CAD Manager Consultant & Coordinator
Design all Electrical requirements using Hevacomp & AutoCAD Release 2004 Electrical drawings for Viking House Hotel Hounslow and produce Record Drawings for O&M Manuals.
Gatwick Airport
BIM Coordinator (Using BSLINK)
Design Co-ordinate M&E Services Drawings using BSLINK with AutoCAD Release 2002 Pier 6 Airport Project
Peter Hunjan’s Profile
Jan 2003 / Jun 2003
Terminal 5 Heathrow Airport
Aug 2002 / Jan 2003
BBC White City
June 2002 / Aug 2002
Jan 2002 / June 2002
July 2001 to Jan 2002
June 1996 / July 2001 (5 Years)
Terminal 5 Heathrow Airport
BIM Coordinator Consultant (Using CADDUCT)
Coordinate Electrical & Mechanical Services Drawings using CADDUCT with AutoCAD Release 2002 ADT 3.3
For the T5 Contract Heathrow Airport Project
Haden Young
M&E Coordinator
Co-ordinate all Mechanical Services Drawings using AutoCAD Release 2002 for the BBC White City Project
M.J.L Michael J Lonsdales
CAD Manager
Completed all HVAC, Plumbing & Fire Fighting, Chilled Water Drawings using AutoCAD Release 2000 for the Deutsche Bank Data Centre Project in Hayes, Springfield Road, Middlesex, also Generated Record Drawings for the O&M Manuals for the Data Centre, Additional Projects completed were for Uxbridge College Park Road Development, Bexley Business Academy-Bexley Heath
T. Clarke Plc
Drawing Office CAD Manager
CAD Design & Coordination, based on site using AutoCAD Release 2000 for all Lighting, Power, Fire Alarm, Electrical Containment Layouts ie Trunking Conduit, Cable Tray Ladder Racks and all ELV Extra Low Voltage Drawings for the Deutsche Bank Data Centre Project in Hayes, Springfield Road, Middlesex. Also Generated Record Drawings for the O&M Manuals.
Cundall Johnston Partners LLP
Drawing Office CAD Manager
CAD Design and Coordination based on site using AutoCAD Release 2000 for all Electrical drawings for 138 Million Pound `Project Welcome' Design & Populate Drawings for The Hayes Data Centre, Project Star Maidenhead, B Sky B Isleworth Co-Ordination Cad Drawings.
Trilectric Ltd – Ruislip, Middlesex
Drawing Office CAD Manager
In charge of Drawing Office – to Revise and update all Electrical Drawings and submit on time from Preliminary stages through to the As Built Record Drawings, single handedly supported 5 Design Managers, 3 Directors and 100+ Site Engineers of the company Using AutoCAD Release 14 & AutoCAD 2000
Peter Hunjan’s Profile
EDUCATIONAL CERTIFICATES & AWARDS ACHIEVED
May 2006
Sep 2005
Jan’ 2001-Sept 01
1998 - 1999
Southbank University
Southbank University
Willesden College
Uxbridge college
Bachelor of Science Honors
Building Services Engineering Degree
Passed all 4 Years Graduated in May 2006
with Distinctions & Credits.
(See attached Transcripts & Certificate)
H.N.D. Building Services Engineering.
City & Guilds 2400 Design, Erection &
Verification (Electrical Engineering)
City & Guilds 730 Teaching & Assessing.
1996 - 1998 Uxbridge College City & Guilds 236 Part 1 City & Guilds 236 Part 2
Electrical Engineering
1995 – 1996 Paddington College H.N.C. Building Services Engineering 1993 – 1994 West Thames College City & Guilds 4351 Two Dimensional AutoCAD Release 12
City & Guilds 4353
Three Dimensional AutoCAD Release 12
1986 – 1987 North Hertfordshire College Engineering Practice Drawing BS308 Advanced Level
1983 – 1985 Barnfield College, Luton Engineering Illustration B.Tech. Diploma
1978 - 1983 Hitchin Boys’ School 6 ‘O’ Levels obtained Plus For Additional Qualifications (Please See 31 Certificates) Peter Hunjan’s Profile
Peter Hunjan’s Profile
Dar A1-Handasah Consultants
(Shair and Partners]
APPRAISAL
Appraisal: for Employee Ref: Peter Hunjan
Designation: Senior BIM Operations Manager & Consultant, Specialist Building Services Engineer, BIM Asset Facility Management
Date. 24th March 2021
To Whom it may Concern,
This is to confirm, and it also gives me great pleasure to write this Appraisal with regards to the above-named employee Peter Hunjan.
Peter started his probational period of employment work at Dar Al Handasah on the 15th October 2020 and from day one he has hit the ground running,