HIMANSHU T. PATEL
ad0uoe@r.postjobfree.com
Highest Qualification: B.E In Mechanical Engineering
Total Experience: 25 years
Highest Qualification: B.E In Mechanical Engineering.
Total Experience: 25 years
Highest Qualification: B.E In Mechanical Engineering.
Total Experience: 25 years
Highest Qualification: B.E In Mechanical Engineering.
Total Experience: 28 years
Total Experience: 25 years
Highest Qualification: B.E In Mechanical Engineering.
Mechanical Maintenance, Turnaround, Erections & commissioning of
SPECIALISATION:
Project Execution, Operations and Maintenance, Turnaround, of Rotating Equipment, & Static equipment’s, Engineering review of equipment’s, SAP
/CMMS, Spare parts Management in Oil & Gas, and petrochemical/chemical/Pharma/Sugar
industry
Profile summary:
Having 28 years of experience for Project Execution, Operation and Maintenance of Plant, Utilities and troubleshooting of rotating equipment’s & Static Equipment’s.
Major maintenance/ Turnaround/Shutdown/Overhauling/Engineering Review / of
heavy-duty rotating equipment like engines, compressors, pumps, turbines etc., &
static equipment like columns, safety valves, pressure vessels, heat exchangers
etc., (All types of Pumps, compressors, Reciprocating gas compressors, steam
turbines,, Mech.seal,Alignment, vessels,heat exchangers boilers, Reactors
, Centrifuges, etc.)
KEY AREAS OF EXPERIENCE:
Site Engineering
Piping Engineering
Plant Maintenance
Utility Operation and Maintenance
Resource Planning
Liaison & Coordination
Budgeting & Cost
Tendering,Contracts & Procurement
Process Improvement
Erection, Testing & Commissioning
PROFESSIONAL EXPERIENCE:
Mechanical Engineer O&M Support PRESENT
Anton oil Services DMCC-Iraq for (Basra Oil Co)
JULY-2018
Responsible for all types of maintenance of Rotating & static Equipments.
Looking After Operation and Maintenance Support Lead Engineering for Central Processing Facility & Degassing Station1&2
Responsible to any technical query regarding any issues related to rotating equipment using latest standard engineering practice
Ensure proper procedure in place and in line with the standard engineering and statutory requirement prior to any testing, installation and hook up commissioning activity
Monitor all the activity and responsible to make sure that any maintenance activity compliance with company standard working procedure in line with ASME, API, NACE, TEMA etc. and company HSE policy.
Inspection and review of new facilities before Hand over. Check availability of all documents.
Prepare activity plans to accomplish all work required by the field procedures
Prepared Root Cause Failure Analyse report and Investigation reports to the related equipment
Maintaining and Modify the equipment system to ensure that it is safe reliable and efficient
Liaise with Vendors for technical Issues and material requirements
Involved in Tendering, Contracts and Procurement Activity
Provide Technical advice and Troubleshoot rotating equipment field problem
Prepared Service Contract for external services form Vendors and also
Involved in New Up Coming Project Activity
Mechanical Engineer 2 MONTH
Kanooz Industrial Services - Saudi Arabia
December 2017 –January 2018
Looking after SHUT DOWN activities for STATC EQUIPMENTS like Columns, Vessels, Heat exchangers, Sumps, Storage Tanks.
The main responsibility is to co-ordinate for all the jobs going on in the plant, report preparation.
Documentation related to each job before start up like Ventilation Plan, Air compressor lay out, electrical lay out, Method of Statement, Lifting plans etc.
Senior Piping Engineer
AL Ghanim International - Kuwait 1 YEAR
June 2016 - February 2017
Spearheaded Low Fars Heavy Oil Kuwait Oil Corporation Piping Project
Directed the engineering output of the piping work scope in-line with the technical specification budget and planning
Ensured relevant sections of mandatory health and safety standards, including pressure piping regulation and code
Designed and modified existing piping discipline drawings based on information gained on-site information provided by pipe stress and flow analysis, simulation, pipe pressure drop calculations and fluid velocities
Directed modification of equipment and ensured conformance with engineering design, specifications and performance, maintained piping specialty items list and data sheets managed the derivation and development of design solutions with customer to meet functional requirements within cost.
Engineer Manager Services 3 YEARS
Royal Swaziland Sugar Corporation - Swaziland
December 2012 - August 2015
Spearheaded mechanical maintenance, fabrication activities, machine shop and planning activities.
Supervised the maintenance of pumps, compressors, gearboxes, belt conveyors, bucket elevators, centrifugal, rotary filters, crystallizers and dryers.
Administered the off-crop shutdown planning for all plant machinery
Successfully led the implementation of SAP System. SAP PM Module.
Engaged in the maintaining ISO 9001-2008, ISO 14001-2005, HACCP.OHSAS 18001-2007, AMS 16001 HIV/AIDS, ISO 22000 FOOD SAFETY.
Augmented the engineering plant capacity enhancement through yields, machine availability, operating rate, indexing up, process capability, reduction in scrap and introduction of housekeeping trophy.
Prepared detailed project control schedule to ensure the correct logic and sequence for engineering, procurement, construction, commissioning
Formulated and implemented strategies for building team effectiveness
Planned preventive maintenance schedules to improve machine availability
Deputy General Manager Utilities 15 YEARS
Sterling Biotech Limited - India
February 1998 - November 2012
Project execution, Operation & Maintenance of Utilities namely: Boilers-12TPH, Ammonia Chilling plants-60TR, 40TR, 30TR and 20TR, Vapor absorption heat pump (VAHP)- 450TR, 280TR, 80TR, 60TR, Air Compressor-700CFM, Atlas Copco Make, Root Blowers-4900M3/hr, Cooling Towers 2000M3/hr., 900M3/hr.
Water treatments plants -R.O. Plant - 55M3/hr., 40M3/hr, D.M. Plant30M3/hr, Soft Water Plant-25M3/hr.
Executed the system policy and procedures in the company while outlining the steps taken in implementing maintenance program for smooth operations across the unit
Conducted review meetings with quality, maintenance and other departmental heads to assess work performance against targeted production levels and provide needed reinforcement
PREVIOUS EXPERIENCE
Officer Maintenance 1YEAR & 6 MONTHS
United Phosphorus Limited - India
July 1996 - February 1998
Senior Mechanical Engineer 3YEARS & 9 MONTHS
Hindustan Nitro-products Limited - India
August 1992 - June 1996
Total years of Experience: 28 YEARS