SKILLS:

-Reading and interpretation of civil, mechanical and isometric pipe drawings.

-Manufacture and assembly of metal structures and industrial pipes. Assembly and maintenance of industrial mechanical equipment.

-Construction, repair and remodeling of homes. Knowledge of residential plumbing and electrical.

-Organization, coordination and management of personnel in manufacturing workshops and assembly projects.

EXPERIENCE:

COMPANY: ODEBRECHT INRAESTRUCTURA. CAMBAMBE – ANGOLA POSITION: SERVICE MANAGER

JANUARY 2015 - JANUARY 2016

In charge of the hydromechanical workshop in the repowering and expansion project of the Cambambe dam in the Republic of Angola. Manufacture of parts and structures for assembly work, pre-assembly of guide beams, seal frames, maintenance of existing gates. COMPANY: SERVIMONCA. MORÓN - VENEZUELA

POSITION: ASSEMBLY SUPERVISOR

JANUARY 2013 – SEPTEMBER 2013

Supervision of the works in the major maintenance stop in the Ammonia and NPK plants of the company PEQUIVEN-Morón. Dismantling of existing mechanical equipment, typical of the production process of the plants, for maintenance, repair, manufacture and / or replacement and subsequent assembly thereof, such as: pipes, motors, reducers, pumps, filters, mixers, tanks, pressure vessels, fans, etc..

COMPANY: PERSOL, CA. TOCOMA – VENEZUELA

POSITION: MECHANICAL ASSEMBLY SUPERVISOR

OCTOBER 2011 – NOVEMBER 2012

Supervision of the following assembly works for the OIV-TOCOMA consortium in the construction of the "Manuel Piar" Hydroelectric Power Plant:

-Assembly and alignment of guide beams and sealing frames for the intake grilles.

-Assembly of rails for the cranes for the permanent gantry cranes of the Auxiliary Warehouse.

-Assembly of pipes, accessories and supports in the different galleries of the assembly hall COMPANY: COOPERATIVA ZONA DEL HIERRO. MATANZAS – VENEZUELA POSITION: PROJECT COORDINATOR

OCTOBER 2010 – DECEMBER 2010

Coordination and supervision of the manufacturing, welding and assembly of pipes for the company ELECTROTÉCNICA SAQUI, in the "project of construction and assembly of an industrial water treatment and cooling plant" in the construction of the EPS TUBOS SIN SEAM plant, which takes place on the premises of SIDOR.

COMPANY: PERSOL, CA. TOCOMA - VENEZUELA

POSITION: ASSEMBLY SUPERVISOR

JANUARY 2009 – AUGUST 2010

Supervisor of the works in the Hydromechanics workshop that consisted of the adaptation, maintenance, recovery and pera-assembly of the equipment for the second diversion of the Caroní River, for the company OIV-TOCOMA, in the construction project of the Hydroelectric Power Plant

"Manuel Piar. Gantry cranes, temporary rail beams, temporary spillway bridge, guide beams, seal frames, plugs and gates.

COMPANY: COOPERATIVA ZONA DEL HIERRO. PUERTO ORDAZ - VENEZUELA POSITION: PROJECT COORDINATOR

JUNE 2007 – NOVEMBER 2007

Supervision and coordination of the manufacturing and structural assembly works of the Villa Granada shopping center, for the company Constructora Nueva Granada COMPANY: HERRAMIENTAS Y SUMINISTROS HEYSUCA. CIUDAD PIAR - VENEZUELA POSITION: PROJECT COORDINATOR

OCTOBER 2004 – JANUARY 2006

Coordination and supervision of the following projects for the company FERROMINERA ORINOCO in Ciudad Piar:

-Remodeling of roofs in the dining rooms of Cerro San Isidro.

-Installation of porcelain tiles in the planning offices.

-Remodeling and adaptation of spaces in offices of Cerro Bolívar. COMPANY: ELECTROTECNICA SAQUI CA. GURI - VENEZUELA POSITION: MASTER BUILDER

JUNE 2003 – OCTOBER 2004

Coordination and supervision of civil works, structural mechanical assembly and piping in the works of the project "adduction system for the concentration plant of CVG ERROMINERA ORINOCO in Guri.

COMPANY: A Y B INGENIEROS CA. MATANZAS - VENEZUELA POSITION: PROJECT COORDINATOR

APRIL 2003 – JUNE 2003

Coordination and supervision of the works before and during the shutdown of Furnace 1, of the SIDOR billet steelworks, for the dismantling of the existing refrigerated ducts and assembly of the new refrigerated ducts.

COMPANY: MANTECMO CA. MATANZAS - VENEZUELA

POSITION: CONSTRUCTION MANAGER

SEPTEMBER 1999 – MARCH 2003

Coordination and supervision of the different projects executed by the company, such as:

-Assembly, testing and commissioning of two mixers for the company CEMTEC GMBH, in the pellet plant located in SIDOR.

-Assembly of hydraulic crane, vacuum tests, with loading and commissioning, for the company CEMTEC GMBH, in the SIDOR pellet plant.

-Maintenance of the rotary dryer and the mobile grill during the shutdown of the main plant for the company TOPP CA, in the plant of pellets of FERROMINERA ORINOCO. COMPANY: TECMOMAN CA. BOLIVAR - VENEZUELA

POSITION: CONSTRUCTION MANAGER

APRIL 1996 – FEBRUARY 1999

Coordination and supervision of the different projects executed by the company, such as:

-Execution of works for the company SM. DURO FERGUERA DE VENEZUELA, in the project

"Expansion and modernization of PMH" in FEROMINERA ORINOCO.

-Execution of works for the company ASEA BROWN BOVERI SA, in the construction project of the briquette plant of CONSIGUA.

-Execution of works for the company FERGUERA PARQUES Y MINAS DE VENEZUELA SA, in the construction project of the "Low tenor ore plant", for the company FERROMINERA ORINOCO. These works are summarized in the following:

-Assembly of structures, hoppers and silos. -Assembly of vibro-feeders, conveyor belts, screens, bridge-cranes, pumps, motors and reducers.

-Vacuum and load tests of the assembled equipment. -Maintenance and repair of existing equipment.

COMPANY: CONSORCIO THT. CIUDAD GUAYANA – VENEZUELA POSITION: PROJECT COORDINATOR

JULY 1995 – MARCH 1996

Coordination and supervision of the assembly works in the project "Expansion and modernization of PMH", for the company SM. DURO FERGUERA DE VENEZUELA, at the facilities of FEROMINERA ORINOCO.

-Elaboration of the assembly programs and control of the progress of work

.

-Check, control and analysis of the costs of additional work carried out during the development of the work.

-Preparation of inspection protocols for the work carried out

.

COMPANY: NAVALMOLIA CA. MATANZAS - VENEZUELA

POSITION: MECHANICAL TECHNICIAN

AUGUST 1994 – JUNE 1995

Review of each of the lines of the different topics existing in the warehouse of the company BAUXILUM OPERADORA DE ALUMINA, in order to develop and document technical guides to update the company's catalog system.

COMPANY: ABB SVECA-SADE. MATANZAS - VENEZUELA

POSITION: MECHANICAL INSPECTOR

MAY 1993 – AUGUST 1994

Inspection of the assembly works of mechanical equipment (electrostatic precipitators, conveyor belts, bucket elevators, railway lines, fans, pumps, etc.), during the execution of the installation project of the "Pellet plant for the company FERROMINERA ORINOCO. COMPANY: CONFERROVEN – IRSI. CIUDAD GUAYANA - VENEZUELA POSITION: MECHANICAL INSPECTOR

JUNE 1992 – FEBRUARY 1993

Inspection and quality assurance, manufacturing, assembly and testing of wagons in the project

"Manufacture of 300 mineral wagons for CVG FERROMINERA ORINOCO" COMPANY: GRUCONSUR CA. MATANZAS - VENEZUELA

POSITION: MECHANICAL TECHNICAL INSPECTOR

APRIL 1991 – APRIL 1992

Supervision and inspection of mechanical assembly, pipes and tanks in the INTERALUMINA expansion project. Coordination and inspection of the programs of scintigraphy, heat treatment and hardness tests in welds, Review of the plans "Thus built". COMPANY: DSD-CGI. MATANZAS - VENEZUELA

POSITION: QUALITY CONTROL INSPECTOR

APRIL 1990 – FEBRUARY 1991

-Supervision and inspection of the mechanical assembly in the project "Expansion of the calcination plant" in the company CVG INTERALUMINA.

-Supervision and inspection of the cutting, manufacturing and welding process, for the different projects that were carried out in the workshops of the company, applied to pipes, tanks, structures and pressure vessels.

EDUCATION:

SECONDARY EDUCATION: Industrial Technical School "Antonio Díaz" Venezuela Industrial Bachelor mention Civil Construction.

UNIVERSITY EDUCACIÓN: UNEXPO - VENEZUELA

Mechanical Engineer

CERTIFICATIONS:

-RIGGING SUPERVISOR

-AUTO CAD LEVELS I, II AND ADVANCED

-WELDING INSPECTION UNDER THE AWS STANDARD



Contact this candidate